Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
5,820 results • Latest
Construction of RCC Precast Boundary Wall of Nizampur IH
TN-04/EE/2026-27 Reconstruction work (box culvert) of the damaged bridge located at km 8.790 of Rajwaha Upper Chudiala. Lot No-03
TN-04/EE/2026-27 Reconstruction work (box culvert) of the damaged bridge located at km 3.443 of Rajwaha Anti. Lot No-02
TN-04/EE/2026-27 Reconstruction work (box culvert) of the damaged bridge located at Km 18.336 of Rajwaha Salarpur. Lot No-01
Janpad hardoi me hardoi khand sharda nahar hardoi ke antargat Peng rajwaha ki kshatigrast pakki sanrachnao ke punarnirman karya
Janpad hardoi me hardoi khand sharda nahar hardoi ke antargat Sihauna rajwaha ki kshatigrast pakki sanrachnao ki punarniman ka karya
Work of laying stone soling (Khadanja) on various reaches of the left bank of the Shahjahanpur Branch under the control of the Sharda Canal Division, Shahjahanpur between km 29.500 and km 93.920 (Lot No. 07)
LOT-04 Restoration of Akauna Dy. from Km 0.000 to Km 10.000 under the Dhasan Canal System in District Hamirpur.
LOT-03 Restoration work of Jariya Dy. from Km 0.000 to Km 9.650 under the Dhasan Canal System, Saprar Division, Jhansi, in District Hamirpur.
Restoring capacity of Shobhapur Escape off taking from km 207.250 R/B of S.S.F.C.
Construction work comprising boundary pillars, wire fencing, and a guard/watchman room on departmental land within the premises of the Bewar Barrage, under the Irrigation Division, Etah.
Restoration of pitching work from the head of the Lower Ganga Canal (upstream of Narora Barrage) up to the 2.000 km mark in Bulandshahr district.
As per the NIT
Brick Soling Work Between Km 0.000 To Km 2.200 Of Ramnagar Thuthibari Bund On The Right Bank Of Chandan River In District Maharajganj.
Brick Soling Work Between Km 0.000 To Km 1.625 And Km 2.240 To Km 3.565of Lakshmipur Bharawaliya Bund On The Left Bank Of Chandan River In District Maharajganj.
Renovation repair work of the main gate of Guru Gorakshnath Ghat at Rajghat in District Gorakhpur
Lot 2 Construction of Fall at Km. 12.600 of Tail Dy
As per the NIT
As per the NIT
01/EE/2026-27 Reconstruction of VRB of Rt. Bhola Dy. at km. 0.800 (Lot-2)
construction of boundry pillar
construction of outlet
construction of V.R.B
construction of boundry pillar
construction of V.R.B
RE-CONSTRUCTION OF V.R.B.(BOX CULVERT) OF F.S BRANCH AT Km. 82.202 IN DISTT. AGRA
CONSTRUCTION OF CATTLE GHAT OF FATEHPUR SIKARI BRANCH AT Km. 45.073 IN DISTT. AGRA
RE-CONSTRUCTION OF V.R.B.(BOX CULVERT) OF F.S BRANCH AT Km. 78.333 IN DISTT. AGRA
CONSTRUCTION OF CATTLE GHAT OF F.S BRANCH AT Km. 81.480 IN DISTT. AGRA
RE-CONSTRUCTION OF V.R.B. OF F.S BRANCH AT Km. 80.660 IN DISTT. AGRA
CONSTRUCTION OF CATTLE GHAT OF FATEHPUR SIKARI BRANCH AT Km. 47.500 IN DISTT. AGRA
Janpad Fatehpur mein pashchimi allahabad shakha ke Km. 235.500 se Km. 244.000 tak kacchi service road par khadanja lagwane ka karya.
RE-CONSTRUCTION OF V.R.B.(BOX CULVERT) OF F.S BRANCH AT Km. 85.810 IN DISTT. AGRA
CONSTRUCTION OF CATTLE GHAT OF F.S BRANCH AT Km. 75.580 IN DISTT. AGRA
Janpad Fatehpur mein Rajapur rajwaha ke pakke karyon ke punroddhar ka karya.
Construction work of boundary wall of Galehra Inspection Building in Fatehpur district.
RE-CONSTRUCTION OF V.R.B.(BOX CULVERT) OF F.S BRANCH AT Km. 81.932 IN DISTT. AGRA
Reconstruction/rehabilitation work of concrete structures of Joniha Minor, Ray Minor, Shahbazpur Minor, Rawatpur Minor and Naraicha Minor in Fatehpur district.
SCRAPED SILT FROM KM 22.516 TO KM 23.520 RIGHT BANK ON BARABANKI BRANCH
SCRAPED SILT FROM KM 20.000 TO KM 20.315 RIGHT BANK ON BARABANKI BRANCH
SCRAPED SILT FROM KM 17.625 TO KM 19.575 RIGHT BANK ON BARABANKI BRANCH
Restoration of 08 No Canals under of Khanna Section of Mahoba District. (LOT-02)
SCRAPED SILT FROM KM 13.900 TO KM 15.400 LEFT BANK ON BARABANKI BRANCH
SCRAPED SILT FROM KM 12.500 TO KM 13.400 RIGHT BANK ON BARABANKI BRANCH
CONSTRUCTION OF CATTLE GHAT OF FATEHPUR SIKARI BRANCH AT Km. 23.976 IN DISTT. AGRA
Rest. damage sections,railing mesh installation,surface painting, other works for the RKE Main Market Bridge(UGC)located at km 29.780 as part of the project covering the Rest.and maintenance of bridges along the UGC system in HRD km 22.640 and 33.796
TN-01/EE/26-27 Janpad muzaffarnagar me muzaffarnagar khand ganga nahar muzaffarnagar ke esthrantargatr Rajwaha Bastam ke km 12.980 par VRB ke Punhnirman ka karya
TN-01/EE/26-27 Janpad muzaffarnagar me muzaffarnagar khand ganga nahar muzaffarnagar ke esthrantargatr Rajwaha Bastam ke km 13.630 par VRB ke Punhnirman ka karya
Construction of Foundation AND Railing for Steam Powered Tractor
Kanpur Prakhand Nichali Ganga Nahar ke Pratham Upakhand ke Antargat Gram Gutaiya, Bannajakha me Padane Wale Vibhagiye bhoomi ke Suraksha hetu Pre-cast Boundary wall Lagane ka karya.