Loading…
Loading…
3,979 results • Latest
Repairing and Finishing works Room No. 53A and Court Yard at E-in- C Office, Cantt Road, Lucknow.(Lot No.35)
Supply AND Installation of digital water level recorder, radar type water recorder and water level indicator sounder at Dhora dam
Providing and fixing stainless steel windows in front side of two wheelers parking of Sinchai Vikas Bhawan Canal Colony, Cant Road, Lucknow.(Lot No.66)
Providing and fixing stainless steel windows in Right side of two wheelers parking of Sinchai Vikas Bhawan Canal Colony, Cant Road, Lucknow.(Lot No.62)
Renovation (Navinikaran) of service road (Nahar Patri) of DY. Faridpur from Km. 8.390 to Km. 9.667
Repairing and Maintenance work of Residence No- M-2/13 and M-2/14 at Canal Colony Cantt Road, Lucknow.(Lot No.61)
Flooring and Roof work in Residence no.- Sa-11 at Canal Colony, Cantt Road, Lucknow.(Lot No.65)
JANPAD BAREILLY MEN DINANK 07 EVM 08 JULY 2024 MEN HUI ATIVRASHTI SE RUHELKHAND NAHAR KHAND BAREILLY KE ANTARGAT SHARDA PRANALI KE VIBHINN RAJWAHON EVM MINORO KE KSHATIGRAST BANKS KE PUNARSTHAPNA KA KARY
Interior Painting Works in Residence No. 14/2 at canal colony cantt Road Lucknow.(Lot No.63)
Providing and laying Tiles in Room no-209,210 and 217 on 2nd floor Rooms of Sinchai Vikas Bhawan canal colony cant road lucknow.(Lot No.28)
Repairing and Finishing works Room No. 120 at E-in- C Office, Cantt Road, Lucknow.(Lot No.42)
Repairing and Finishing works Room No. 7A at E-in- C Office, Cantt Road, Lucknow. (Lot No.13)
Restoration of damaged Launching appron of Anti-erosion Work in 400 m for Protection of Majara Semra of Village Group Sherpur Semra Group on Left Bank of the River Ganga in District- Ghazipur
Anti-erosion Work for Protection of Majra Mubarakpur and Kewat basti of Village Group Sherpur-semra on Left Bank of River Ganga in District- Ghazipur
Anti-Erosion Work in Gram Gahmar near Panchmukhi Hanuman Ghat for protection against erosion in 550 metre length on the right bank of river ganga in tehsil-Sewrai, Distt-Ghazipur.
SILT DISPOSAL BY AUCTIONING OF CHAFF BRANCH FROM KM 0.400 TO KM 0.800
SILT DISPOSAL BY AUCTIONING OF CHAFF BRANCH FROM KM 0.000 TO KM 0.400
Anti Erosion Work of Kunhra-Ghoghi Bund Between Km. 31.900 to 32.300 in Village Gujrauliya on Left Bank of Burhi Rapti River in Distt. Siddharthnagar.
FLOOD PROTECTION WORK FOR PROTECTION OF GROUP OF VILLAGES SEMARIYA SHIVPUR KAPUR DIYAR SEMARIYA KA DERA NARAYAN RAI KA DERA AND LAGANTOLA ETC. ON LEFT BANK OF RIVER GANGA IN DISTRICT BALLIA
Baigul Escape ke Km 5.400 To Km 9.000 ke madhya Thek hatane,Aantrik section sudhar avam bank ki marmmat ka karrya.
Reconstruction of 5 no. V.R.B on Dohrighaat sahayak main canal in District Ballia.
CONSTRUCTION OF PRE-CAST R.C.C. PILLAR FOR DEMARCATION OF FLOOD PLANE ZONE ON THE LEFT BANK OF RIVER GANGA IN DISTRICT BALLIA Lot 1
Construction of V.R.B at Km 11.300 of Chandausi Branch.
Construction of R.C.C. V.R.B. at Km. 1.870 of Sonhar Drain of District Hardoi
Anti erosion work for protection of near village Rampur, Gobaraha on right bank of River Ganga in Sadar Tehsil of Distt. Varanasi
Construction of R.C.C Box Type Regulator Gate at Km 14.500 of Khajuha Jhunjhunia Andharpurwa Bund on Left Bank of Rapti River in District Shrawasti. (LOT-06)
Construction of Embankment and Protection Work from Km 8.422 to Km 9.052 near Village Mohammadpur Kalan (Mujhehna) of Khajuha Jhunjhunia Andharpurwa Bund on Left Bank of Rapti River in District Shrawasti. (Lot-02)
Maintenance of Tainara Drain form Km 0.000 to 13.400 of District Unnao
Removing Sandbar From Right Edge of Rapti River Between km 18.550 to km 18.800 at P.D.T.Marginal Embankment in District Shrawasti. (Lot-01)
SILT CLEARENCE FROM KM 0.000 TO KM 1.300 AND SCAPING BETWEEN KM 1.300 TO KM 3.200 ON MAJHAUWA MR.
SILT CLEARENCE FROM KM 0.000 TO KM 1.200 AND SCAPING BETWEEN KM 1.200 TO KM 3.100 ON CHHANWATIYA MR.
SILT CLEARENCE FROM KM 0.000 TO KM 1.500 AND SCAPING BETWEEN KM 1.500 TO KM 3.800 ON AURHJUNGAL MR
SILT CLEARENCE FROM KM 0.000 TO KM 1.100 AND SCAPING BETWEEN KM 1.100 TO KM 2.850 ON PARASI MR.
SILT CLEARENCE AND BED BERM SCAPING ON AAMA MR. FROM KM 0.000 TO KM 0.900, AND KM 0.900 TO KM 2.500
SILT CLEARENCE AND BED BERM SCRAPING ON KOHARGADDI MR FROM KM 0.000 TO KM 4.300
SILT CLEARENCE FROM KM 0.000 TO KM 1.500 AND BED BERM SCRAPING BETWEEN KM 1.500 TO KM 3.800 ON SALTOUWA MR.
SILT CLEARENCE AND BED BERM SCRAPING ON KOLHUI MR.FROM KM 0.000 TO K.M 3.000
Silt Clearance on Lakhanpurwa Minor from Km. 0.000 to Km. 3.100
Silt Clearance on Uddaulia Minor from Km. 0.000 to Km. 3.300
Silt Clearance on Mudiyar Minor from Km. 0.000 to Km. 3.000
Silt Clearance on Hathiya Minor from Km. 0.000 to Km. 2.400
Silt clearance of Baldevjot mr. between Km. 0.00 to 2.600
Silt clearance of Khamharia mr. between Km. 0.00 to 2.600
CONSTRUCTION OF CEMENT CONCRETE LINING WITH TEMPERATURE REINFORCEMENT IN BABINA FEEDER CANAL FROM KM 0.000 TO 2.810
Restoration work of Boulder Revetment between Km. 6.650 to Km. 7.100 of Bhojpur-Shahpur Embankment on the left bank of Rapti River in Distt. Balrampur.
Projetc of Boulder Rivetment work in 700 Mtr. Length at Balrampur-Bhadariya Embankment near Village Kodarwa on right bank of Rapti River in Distt. Balrampur.
CONSTRUCTION OF COUNTER BERM WITH RETAINING WALL FROM KM. 50.000 TO 50.800 OF BANSGAON DY.
CC Lining Work (5 Nos) and Floor Protection (30 Nos) work on various Pucca Structures Constructed between km 0.000 to km 18.200 of Baghapar Dy in Distt- Basti.
Construction of Counter Berm by Constructing toe wall between Km 16.100 to Km 16.700 of Mahuli Dy.
Construction of Retaining Wall