WORK OF DETAILED SURVEY AND SOIL TESTING FOR HEIGHT RAISING / SHIFTING OF TOWER (LOCATION No. 121-122) OF 400 KV GORAKHPUR-AZAMGARH LINE BEIGH INFRINGED IN THE CORRIDOR OF RAMJANKI MARG PROPOSED BY MINISTRY OF ROAD TRANSPORT AND HIGHWAY, GORAKHPUR UN
WORK OF DETAILED SURVEY AND SOIL TESTING FOR CONSTRUCTION OF 132 KV MAHARAJGANJ-SISWA T.S.S. LINE FOR DOUBLING OF GORAKHPUR-VALMIKINAGAR RAILWAY LINE PROPOSED BY NORTH EASTERN RAILWAY UNDER ETD-II, GORAKHPUR
WORK OF DETAILED SURVEY AND SOIL TESTING FOR CONSTRUCTION OF 132 KV MAHARAJGANJ T.S.S. LINE FOR GHUGHLI- ANANDNAGAR-MAHARAJGANJ NEW RAILWAY LINE PROPOSED BY NORTH EASTERN RAILWAY UNDER ETD-II, GORAKHPUR
WORK FOR THE REPLACEMENT OF 36 KV VCB and 132 KV PT AT 220 KV SS Division PANKI KANPUR
Carriage of 132 KV TF Control Panel and Relay Panel for increasing capacity of 40 MVA TF at 220 KV Sub-Station, Bahraich under ETD Bahraich
OPEN EXCESS WORK OF 33KV RAILWAY BAY AT 132KV SUB-STATION MOHADDIPUR-OLD UNDER ETD-I GORAKHPUR
Shifting of Station Transformer fuse set and removing of damaged 300mm2 xlpe under ground cable
Providing and Fixing of Surge Counter for 120 KV Lightening Arrestor for various Sub-Station under ETD - II Agra
Repairing and Maintenance of outdoor LT distribution system and associated works at 400 kV S/S Agra
work
shifting of 220 kV RC Green- Jaypee Sports line infringing to interchange of Yamuna Expressway and Eastern Peripheral Expressway along ramp C of Interchange under ETD II Noida with all associated works
for the Diversion Height raising of 220 KV PGCIL Maharajganj Line and 220 KV PGCIL Anand Nagar Line between Multi Circuit Location No.10 to DC Tower No 30 due to infringement of Sahajanwa-Doharighat New Rail Line proposed by N.E.R. under ETD II GKP.
for the Diversion Height raising of 132 kV Gola Khajani S.C. Line and 132 kV Gola Bhagwanpur S.C. Line on D.C. Toweer due to infringement in area of new developed industrial corridor by Gorakhpur Industrial Development Authority under ETD II GKP
THE WORK OF DIVERSION AND HEIGHT RAISING OF 220 KV TANDA BARAHUA TRANSMISSION LINE BETWEEN LOCATION NO 243 to 250 DUE TO SAHJANWA DOHARIGHAT NEW RAIL LINE PROPOSED BY N E RAILWAY UNDER ELECTRICITY TRANSMISSION DIVISION II GORAKHPUR
Faulty BCU replacement at 132 KV Anoopshahar road, Aligarh
Construction of 33 KV Harchandpur Kalan bay at 220 KV Substation Etah, under ETD- Mainpuri
Replacement of old 220 KV Air Pneumatic circuit breakers at 220 KV S/s Mainpuri under ETD-Mainpuri
Work Of Carrying Out Painting Job Of Marshalling Boxes at 400kv S/S Bhadrekhi Orai Under E400kV S/S Division, Orai.
CARRIEGE OF VARIOUS ITEMS ,DIVERTED FROM DIFFERENT LOCATIONS TO 220KV SUBSTATION BHARTHANA UNDER ETD, ETAWAH
Attending oil leakage in LV WTI/OTI-CT Bushing and Neutral Bushing of 40 MVA T/F-II (Technical Associate make) at 132 KV s/s Auraiya under ETD, Etawah
For Replacement of 40MVA TF2nd C and R panel and procurement of Material for auto operation and overhauling of cooling fan at 132KV SS Jahanabad under ETD Fatehpur
WORK
FOR OVERHAULING/MAINTENANCE OF 33KV VCB INSTALLED AT 220KV SUBSTATION SARH KANPUR UNDER ETD-II, KANPUR.
Work
FOR ADDING 01 NO. 33KV GURUTEGBAHADUR FEEDER BAY INCLUDING DISMENTLING BAY AND ERECTION ALSO OF 03 NOS. FEEDER BAY AND 33KV TRANSFER BUS WITH BAY AT 132KV SUBSTATION KUNERA ETAWAH UNDER ETD-ETAWAH.
WORK
ADDING 02 NOS. 33KV SIRSABIBA MAU AND SARAIBHUPAT FEEDER BAY INCLUDING DISMENTLING AND ERECTION ALSO OF 02 NOS. 2X10MVAR, 33 KV CAPACITOR BANK AND EXTENSION OF 33 KV MAIN AND TRANSFER BUS AT 132 KV SUBSTATION JASWANTNAGAR UNDER ETD, ETAWAH .
WORK
WORK OF HIRING OF 01 NO DIESEL VEHICLE WITH DRIVER FOR SDO ETSD BHARUA SUMERPUR
WORK OF HIRING OF 01 NO DIESEL VEHICLE WITH DRIVER FOR SDO ETSD MAHOBA
WORK OF HIRING OF 01 NO DIESEL VEHICLE WITH DRIVER FOR EXECUTIVE ENGINEER OF ETD HAMIRPUR
Chemical Earthing work at 132 kv sub station kheragarh
Civil Construction work for open store
For Providing and Fixing of WTI Attending Gas leakage of 132 KV GCB ABB make at 132 KV SS MintoPark Prayagraj
WORK FOR HIRING OF 01 NO. DIESEL VEHICLE WITH DRIVER FOR SUPERINTENDING ENGINEER ETC BANDA.
FOR BORE EARTHING OF SWITCHYARD AT 132 KV SUB STATION DADANAGAR, KANPUR UNDER ETD-I, GOVIND NAGAR KANPUR
DISMANTLING AND ERECTION OF DAMAGED 33KV VCB AT 132KV SUB-STATION MOHADDIPUR-OLD UNDER ETD-I GORAKHPUR
supply and works for repairing of damaged 220 kv HGIS Pass module of 220 KV Muradnagar pratapvihar line bay
Overhauling of 220KV isolators shifting of LT line pole in existing switchyard of 220KV sub station Hardoi along with special earthing at 132KV sub station Asha under ETD Hardoi
For Strengthening and Sectioning of 33 KV Main Bus-Bar of Twin ACSR Moose conductor along with other associated work and materials at 220 KV Sub Station Bhelupur Under ETD I Varanasi.
WORK
REPLACEMENT OF DAMAGED/DEFECTIVE 33 KV VCB OF 33 KV HAISER BAY AT 132 KV S/S NATH NAGAR AND 33 KV MOLNAPUR BAY AT 132 KV KHALILABAD UNDER ETD-I BASTI.
Replacement of old and defective 132 KV Control Panel and 33 KV C and R Panel at 220 KV SubStation Modipuram under ETD Meerut
FOR WORK OF SPRAY PAINTING ON 220/132KV 200 MVA T/F-1 UNDER ETD-III, VARANASI.