Loading…
Loading…
17,045 results • Best match
COMPREHENSIVE MAINTENANCE OF 33 KV SUBSTATION YARDS AT MRS AND STN HQ INCLUDING 33 KV OH LINE FROM 132 TO 33 KV STN HQ AT MIL STN JAISALMER
... in depth for foundation, laying of cable/pipe etc not exceeding 10 ...
Construction of Block Level Stadium (Without Indoor Hall) at Bhanjanagar Block in the District of Ganjam.
Laying of MV cable above 25Squre Metersm to 120 Squre Metersm in ground (5.1.2)
As per BoQ
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 125 mm on top of the cable, (d) Lay the protective Common burnt ...
HT (Electric) Connection for Incubation Center at KUMS Bhilwara
... mm along the trench, (b) Lay another cable in middle of trench in such... height 100 mm on top of the cable. (d) Lay the protective Common burnt ...
CWEK/T-49/864 EWS/2026-27 SPL REPAIR TO BLDG NO P-1127 IN BB CANTT, SRINAGAR IN THE AOR OF AGE B/R-II UNDER GE 864 EWS
M&L for sand cushioning for under ground cable provided with a layers of sand before laying cable and sand after laying & stretching the cable complete all as specified and directed.
PROVISIONS OF TOILETS (12 NOS.) FOR TRANSIENTS AT 217 TRANSIT CAMP PALCHAN UNDER AGE (I) R AND D MANALI
... cushioning (8cm thick before laying the cable and 15 cm above the cable), protective covering (laying sub class B bricks in flat), ...
REPAIR MAINTENANCE OF SECURITY LIGHT, HIGH MAST DISTRIBUTION SYSTEM, CEILING FAN, EXHAUST FAN, WALL MOUNTED FAN, METER, INTERNAL WIRING FITTING AND OTHER ALLIED WORKS AT SITE P AND SITE R AT AF STATION THANE UNDER GE (AF)THANE
... thickness (8 Cm in depth before laying the Cable and 15 Cm in depth after laying the Cable) and consolidated (punned) ...
REPAIR AND MAINTENANCE OF HT/ VCBs/SF6 TRANSFORMETS AT INS HAMLA
Supply & laying HT XLPE Cable, insulated, screened, PVC ...
REPAIR MAINTENANCE OF LT NETWORK AND ELECTRICAL INSTALLATIONS AND PREVENTIVE MAINTENANCE OF SERVO VOLTAGE STABILIZER AT SOUTH CAMP MAP AREA 4 AFSR AIR ENCLAVE NEW PROJECT AND ALLIED AREA AT AF STN BAMRAULI UNDER GE AF BAMRAULI
M & L for sand cushioning with Ganga Sand to underground cable (8 cm thick before laying and 15 cm thick after laying the cable, complete all as specified and directed.
PROVN OF INFRA FOR 240 KW FAST CHARGER FOR CHARGING ELECTRIC BUSES AT MIL STN GAYA UNDER GE GAYA
Supply, laying and testing cable XLPE insulated, screened, ...
SPL REPAIR FOR REPLACEMENT OF DG SET 125 KVA AGAINST BER AT MH IN OLD AMRITSAR CANTT
Supply and laying testing cable XLPE insulated armoured ...
SPECIAL REPAIR TO BUILDING NUMBER T 71(1) T 71(2 3) T 71(4 5) T 71(6 7) T 71 1(5 6) T 71 1(7 8) T 71 1(9 10) AND T 71 1(11 12) (19 X ROOMS TENT TYPE QUARTERS) AT DUNKRIK LINES UNDER AGE B AND R II GE(CENTRAL) KHADKI
Excavating in trenches n. exc. 1.5 m wide and n. exc. 1.5 m in depth; for foundation , laying of cable etc or for manholes, laying pipes etc and getting out in hard / dense soil.
Repair/ maint of Sedimentation tank, oxidation chamber and connected pipe line/ walls and associated work at Misa Camp under GE (S) Tezpur
M & L for sand cushioning with a layer of sand 18 mm thick before laying of cable and 150 mm thick after laying of cable in trenches complete all as specified and directed.
SPECIAL REPAIR TO MD ACCN BLDG NO P183 AND PROVN OF EXHAUST FAN IN OTM ACCN AND ORs BATHROOM AT MARIANI UNDER GE JORHAT
... thickness (8 Cm in depth before laying the Cable and 15 cm in depth after laying the Cable) and consolidated (punned) ...
PROVN OF REVENUE WORK AND CERTAIN MINOR WORKS AT NAUGAM AND BARAMULLA UNDER GE 969 EWS
M&L for sand cushioning to under ground cables with a layer of sand 8 cm before laying the cable and 15 cm after laying the cable, complete all as specified and as directed.
REPAIR / MAINT OF LT DISTRIBUTION SYSTEM WITH CONNECTED SWITCHGEARS, MAIN DISTRIBUTION PANELS / PILLAR BOXES / PANEL BOARDS / CUBICLES, LT CABLES AND CONNECTED WORKS AT MD ACCN AREA OF MINNIE BAY AND SRINAGAR AREA UNDER AGE E/M-I OF GE MINNIE BAY, SR
... recorded before and after laying of cable. (a) 3.5 Core 25 Sqmm
SPL REP TO BLDG NO ET-87 AND PROVN OF HEAVY DUTY INTERLOCKING TILES AT DARRANGA MIL STN UNDER GE RANGIA
... thickness (8 Cm in depth before laying the Cable and 15 Cm in depth after laying the Cable) and consolidated (punned) ...
REPAIR/MAINT OF DG SETS, STREET LIGHTS, LA, FIRE ALARM , LT CABLE, DISTRIBUTION PANELS AND EXTERNAL SUPPLY UPTO 1100 VOLTS AND MISC E/M INFRASTRUCTURE AT 4AFSB VARANASI UNDER GE(AF) GORAKHPUR.
... earth work required for laying the cable complete all as specified ...
Provn of 12 x toilets and 12 x bathrooms with allied infra near Bldg No T-122 in OTM of 65 Med Regt at New Mil Stn Kapurthala under GE Kapurthala
M&L for sand cushioning to under ground cable with a layer of sand 8 cm thick before laying of cable and 15 cm thick after laying of cable complete all as specified and directed.
Rajkot division-S&T Work in connection with (i) Providing ROB in lieu of LC No 135 at Km 755/0-1 Between KHDI - PDH section(2 lanes) (ii) Providing ROB in lieu of LC No 147 at Km 770/1-2 Between PDH - CX section(2 lanes) (iii) Proposed LHS in lieu of LC No. 92 at Km 698/1-2 bet LXR-WKR (iv) Kanalus: Rectification of bad layout from Pt 112 towards PBR side by shifting the turnout by 18m towards RJT.
Laying of half round RCC pipe after laying the cables in the trenches as per technical specification of tender condition. (Cable laying is covered separately) Running
Rajkot division-S&T Work in connection with (i) Providing ROB in lieu of LC No 135 at Km 755/0-1 Between KHDI - PDH section(2 lanes) (ii) Providing ROB in lieu of LC No 147 at Km 770/1-2 Between PDH - CX section(2 lanes) (iii) Proposed LHS in lieu of LC No. 92 at Km 698/1-2 bet LXR-WKR (iv) Kanalus: Rectification of bad layout from Pt 112 towards PBR side by shifting the turnout by 18m towards RJT.
Laying of half round RCC pipe after laying the cables in the trenches as per technical specification of tender condition. (Cable laying is covered separately) Running
REPAIR AND REPLACEMENT OF SECURITY STREET LIGHT,GLOBE LIGHT, LT CABLE AND EM MISC WORKS IN OFFICE AND RESIDENTIAL PRIMISES AT PCDA (NC) JAMMU UNDER GE AF JAMMU
... cushioning for 8 cm before laying the cable and then after laying the cable 15 cm width of trenches ...
SPECIAL REPAIR TO BLDG NO P-20, P-21 AND P-26 IN MES COLONY UNDER AGE B/R-I OF GE SAUGOR
... cable , 80 mm thick before laying the cable and after laying the cable complete all as specified ...
SPL REPAIR / REPLACEMENT OF ELECTRIC ITEMS AT BLDG NO D-110 APS AND PROVN OF CEMENTED INTERLOCKING TILES AND ALLIED WKS AT VARIOUS LOCATIONS OF SHAHBAAZ SUVIDHA COMPLEX UNDER GE SAUGOR
... cable , 80 mm thick before laying the cable and after laying the cable complete all as specified ...
Protection and other miscellaneous work under EDD-Kopaganj in Business Plan 2026-27
UNIQUE CODE-S076 CABLE LAYING AT RAILWAY CROSSING AT KARAUT FEEDER, RATANPURA.
Design,Supply,Constr.,Installation,Testing,Comm. of 110kV EHV XLPE insulated power cables and constr. of EHVbay with ABT metering arrangement and SCADA at MSETCL BSR Receiving Station on BOQ Basis for BSR TSS in BVI-VR Section of WR under MUTP-3A
... preparation of profile drawing for cable laying and preparation of final ...
ADDN/ ALTN OF TYPE-II QTR BLDG NO T-37 IN GE (AF) MOHAN BARI
Supply, fixing/ laying, connecting and commissioning LT underground cable XLPE insulated, screened, ...
Civil Work
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 125 mm on top of the cable, (d) Lay the protective Common burnt ...
Signalling work in connection with Extension of shunting neck and converted into DN Goods loop line at Tilati station of Solapur Division.
... relays for NI working if any, laying of temperory cables for mock panel and wiring ...
Signalling work in connection with Extension of shunting neck and converted into DN Goods loop line at Tilati station of Solapur Division.
... relays for NI working if any, laying of temperory cables for mock panel and wiring ...
Additional Electrical and Cable related work in Construction of ICD Building, RSIC, Jaipur
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 125 mm on top of the cable, (d) Lay the protective Common burnt ...
PROVN OF CERTAIN WORK SERVICES AT B/NO 241, PROVN OF INLET AND OUTLET CONNECTION TO WATER RADIATORS OF VACCUM FURNANCE AT VK-2500 OH LINE AND PROVN OF REFRIGERATORS/DEEP FREEZERS/WATER COOLER/WATER DISPENSER FOR VARIOUS LOC AT 3BRD UNDER GE(AF)MC CHD
... refilling in trenches before laying of cable 8 cm and 15cm after laying of cable. This is then gently punned ...
REPAIRS TO INTERNAL ELECTRIFICATION INCLUDING METERS, CEILING FANS GEYSERS AND EXTERNAL ELECTRIFICATION INCLUDING FPs DBs AND APFC AT VISHWA VIHAR CAMP UNDER GE (AF) MARATHAHALLI
... earth soil 15cm deep before laying the cable and 8 cm depth after laying of cable, complete all as specified.
REPAIRS TO INTERNAL ELECTRIFICATION INCLUDING METERS, CEILING FANS, GEYSERS AND EXTERNAL ELECTRIFICATIONW INCLUDING FPs, DBs AND APFC AT ASTE UNDER GE (AF) MARATHAHALLI
... earth soil 15cm deep before laying the cable and 8 cm depth after laying of cable, complete all as specified.
REPAIRS TO INTERNAL ELECTRIFICATION INCLUDING METERS, CEILING FANS, GEYSERS AND EXTERNAL ELECTRIFICATIONW INCLUDING FPs, AND APFC AT SDI UNDER GE (AF) MARATHAHALLI
... earth soil 15cm deep before laying the cable and 8 cm depth after laying of cable, complete all as specified.
REPAIRS TO INTERNAL ELECTRIFICATION INCLUDING METERS, CEILING FANS, GEYSERS AND EXTERNAL ELECTRIFICATIONW INCLUDING FPs, DBs AND APFC AT AKASH VIHAR UNDER GE (AF) MARATHAHALLI
... earth soil 15cm deep before laying the cable and 8 cm depth after laying of cable, complete all as specified.
S&T Work: (i)Utility shifting of LC Gate No. 158 (JDR-BMKI) in connection with the work " Construction of ROB at LC No.- 158 between Jivdhara -Motihari in East Champaran District. (ii) Utility shifting of LC Gate No. 178 (SGL-MJL) in connection with the work " Construction of ROB at LC No.- 178 between Sagauli Majhaulia in West Champaran. (iii)Utility shifting of LC Gate No. 160 (BMKI Yard) in connection with the work " Construction of ROB at LC No.- 160 at Bapudham Motihari yard in East Champaran.
"Laying cables of different sizes as per ...
REPAIR MAINT OF EXTERNAL WATER SUPPLY REPAIR MAINT TO LT EXTERNAL ELECTRICFICATION REPAIRS MAINT SERVICING TO COOLING APPLIANCES REPAIRS MAINT SERVICING DG SETS , LT PANELS EARTHING REPAIRS MAINT OF SECURITY PERIMETER LIGHTS SOLAR LIGHTS GAR
... layers of 80 mm thick before laying of cable and second layer of 150 mm thick after laying of cable in trenches/ducts including ...
S&T works in c/w (A) Prayagraj Division-Provision of stabling lines at Subedarganj station. (B) Construction of a new island platform at Subedarganj (SFG) by dismantling at line No. 2 & 3 along with retaining of existing PF No. 6.
... is done. Important: The laying of OFC cable independently or along with ...
SITC of Electric Sub Station work at 50 Bedded Satellite Hospital Prithviraj Nagar, Distt Jaipur.
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 125 mm on top of the cable, (d) Lay the protective Common burnt ...
SPL REPAIR TO LT NETWORK AND EXTERNAL WATER SUPPLY SYSTEM AT NAGTALAO UNDER GE BANAR
... depth for taking out and laying pipe lines/cables not exceeding 10 Sqm on ...
Conversion of attached toilet at Block-B of the Upper Lobby of the Debating Chamber, assembly House into server room and store room under assembly House electrical Sub Divn Part I Electrical Installation
PWD Sche. Item: F-1/2(b): Laying of cable upto 3/4 core 25 sqmm on ...
CONSTRUCTION OF TRANSIT ACCOMMODATION PHASE-02 IN BLOCK 1 & 2 KIADB INDUSTRIAL AREA KAPNUR AT KALABURGI DISTRICT
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable120 to 240 Sqmm
REPAIR MAINTENANCE REPLACEMENT OF HT ELECTRICAL SYSTEM OF DIB AND DIA ZONE UNDER AGE EM I OF GE N MAMUN
Laying only cable retrieved from item No 113 ...
Construction of Town Stadium at Devanahalli Bengaluru Rural District (Phase I & Phase II)
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff HT Cable 3x95 to 150 Sqmm
CONSTRUCTION OF GOVT. ITI COLLEGE AT TAGADUR VILLAGE IN NANJNAGUD TALUK, IN VARUNA CONSTITUENCY, MYSURU DISTRICT
Supply and laying insulated cable on messenger wire using ...
REPAIR/ REPLACEMENT OF INTERNAL ELECTRIFICATION OF CDA (ARMY) UNDER AGE E/M-II OF GE (SOUTH) MEERUT CANTT
... trenches 80mm thick before laying the cable and 150mm thick after laying the cable including spreading levelling ...
GE/H/T-28 /2026-27 REPAIR/ MAINTENANCE AND IMPROVEMENT OF EXTERNAL ELECTRIC SUPPLY SYSTEM BUSBAR MAIN DBS MCCBS UG CABLES AND OTHER MISC WORKS AT AHRR UNDER GE E/M RR HOSP DELHI CANTT-10
Material and labour for sand cushioning with layer of sand 8cm thick before laying of cable and 15cm after laying of cable in trenches complete all as specified and directed.
REPAIR/ MAINTENANCE AND IMPROVEMENT OF LT NETWORK, UG CABLES, OH LINES, LT PANELS AND OTHER CONNECTED ITEMS AT BIRPUR AND GHANGORA UNDER AGE E/M-II OF GE DEHRADUN
Excavation in trenches in any type of soil not exc. 1.5 mtr wide and not exc. 1.5 mtr in depth for laying of cable, foundation etc and getting out complete all as specified and directed.
REPAIR/ MAINTENANCE AND IMPROVEMENT OF LT NETWORK, UG CABLES, OH LINES, LT PANELS AND OTHER CONNECTED ITEMS AT VARIOUS LOCATIONS OF GARHI CANTT AREA UNDER AGE E/M-II OF GE DEHRADUN
Excavation in trenches in any type of soil not exc. 1.5 mtr wide and not exc. 1.5 mtr in depth for laying of cable, foundation etc and getting out complete all as specified and directed.