Loading…
Loading…
10,632 results • Best match
RESTORATION OF ROAD DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT GOVT. COLONY FROM 480 BORAL MAIN ROAD TO 92/C USHA PALLY IN WARD NO. 111 UNDER BR XI
Reinstatement of road dug by Reliance Jio Digital Fibre Pvt Limited for laying Optical Fibre Cable (OFC) using HDD (Horizontal Directional Drilling MT Micro Trenching) Technique in Aldona Constituency in Bardez Taluka.
Composite e-Tender for Procurement, supply,Trenching, Laying, Installation, Testing of Optical Fiber Cable, PLB Duct and accessories for the construction of exclusive Optical NLD in Ernakulam District, Including Supply of Materials.
Enq.No.17-I 25-26 WCT for laying of 11kv 3x300 sqmm XLPE cable for erection of new 11kv kk nagar feeder 1005 m to be fed from new 33/11 kv Mangadu(Altis)SS
Drilling, Reaming & Laying of 11KV Cable using Trenchless Technology Method (Horizontal Directional Drilling method) at a depth of about 1.20m or more by using directional drilling unit equipped with automated pipe handling system, using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other services like telephone, Internet cables, water pipes, etc., installation including cost of pipe, hire charges for all the accessories and equipment etc., taking necessary drive pit for drilling & laying the cable, removing the excavated earth. The rate quoted for includes the charge of GPR (Ground Penetrating Radar) Survey for identifying the existing utility in the proposed bore path, making necessary entry pit and exit pit at every 200m intervals, extra excavation for joint pits, road/rail crossings, if any,including erection of ID,OD & Straight Joint Kits as required and as directed, transporting of cable drums from stores including loading and unloading using truck mounted crane, transporting of empty drums including loading at site and devolution of empty cable drum & balance cable to Departmental Stores etc., complete as directed.
Maintenance of Street Lights, High Masts on Delhi PWD Roads under PWD M-South Division during 2025-26. (SH- Day to Day Maintenance of Various types of decorative poles with fittings and Providing and Laying of UG Cable to restore the supply from IIT
Supplying, laying and fixing of following size PVC insulated and PVC sheathed/ XLPE aluminum conductor armoured power cable of 1.1 KV grade in the existing RCC/ HUME / METAL i/c less credit back old wornout dismantle material.
Restoration work due to cutting of 21 nos of pits and 20m Open trench by BSNL for laying of under ground OFC cable from 0.50 km to 3.605 km of Ghoshpara Road( At Shoulder, Mastic and Paver Block Surface Portion) under Barrackpore Division 2024-25.