Loading…
Loading…
10,701 results • Best match
Annual Maintenance estimate of MLD STP Jind for the year 2025-26.
[24.2.2.1]LT CABLE 2.1. Laying of underground cable 0.75 metre below ground level covered with sand and bricks including excavation and refilling of trenches.:-2.5 Sq mm to 10 Sq mm 2 to 4 Core
Work of supplying and laying copper armoured cables for streetlights at Powai unit chawl staff quarters under AEMWWESII.
Work of supplying and laying copper armoured cables for street lights at Powai unit chawl staff quarters under AE(M)WWES-II
Plant/Systems/Equipments (Version 2) - Office Space; Brick Work in Ration 1:3 and Cement and core sand including Supply all Material T & P Etc Required for Proper completion work as per PWD Specification; Ser.., Repair, Maintenance, and Installation ... and laying Ceramic ... and laying Ceramic ... & Cable Unit ...
and Installation of Plant Systems/Equipments (Version 2) - Office Space; Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality of approved make in colou..
Supply and Laying of Cables to Facilitate Power to Different Processing Plants and Sanitary Landfill at Dhapa Plant Site.
Replacement and re-laying of damaged cables at DM-45 plant under Asphaltum Department Palmer Bazar.
REPAIR/MAINTENANCE OF LT PANELS, JUNCTION BOX, APFC PANEL, ACB PANEL AND LAYING OF LT CABLES AND ALLIED WORKS AT MIL STN KANASAR UNDER GE (N) BIKANER
Laying only LT underground cable, 1100 volts grade, XLPE insulated and PVC sheathed, armoured heavy duty with multistrand aluminium conductors in trenches encased in DWC/ GI pipe of following sizes complete all as specified and directed by Engr In Charge.