Construction of Maharaja Shoor Saini Chowk at MC Ladwa , Kurukshetra
[24.2.2.2]LT CABLE 2.2. Laying of underground cable 0.75 metre below ground level covered with sand and bricks including excavation and refilling of trenches.:- 16 Sq mm to 35 sqmm 2 to 4 Core [Through Rate]
Extending Power supply to C and D Towers NTPC BARAUNI
Aerial Bunch Cable Laying
The work of enhancement of existing 100KVA Distribution Transformer to 400KVA Distribution transformer Amboi DTC Sao Mathias Diwar Goa for releasing 2 Nos of New LTD Connections
Supply and laying of Underground cable protective cover as per specs. The concrete slab shall be machine made using semi dry concrete that is batched in a fully automatic PLC controlled concrete batching plant and cast in a fully automatic "Vibro-press" machine with a high vibration frequency and hydraulic presuure of 40 MT, the size of the slab shall be 480mm*250mm*50mm and the concrete grade shall be M30 Adhring to IS 456l:2000 and shall have a minimum crushing strength of 30 N/mm2 (28 days strength) when tested.
Biennial Service Contract for various HT and LT electrical cabling jobs at Plant, KTPS under EMOPH department
Laying & termination of 11KV Cable Laying & termination of 3Cx95sq.mm , 11 KV grade, XLPE armoured power cable at underground trench of with 460mm wide and side with sand filling. Cable will be lay on sand which will be covered by brick as said. with 24 (Twenty Four) Nos. bricks per Mtr. including filling the space between the bricks and cable and also the trench with shifted soil, leveling up and restoring surface duly rammed. Gap between two laid cable will be 350mm x 760mm at average depth of 1Mtr, with brick protection on top
Special Repairs to External Electrical Fittings and Connected Work From TCP - 1 to Tank Chowk under GE Brichgunj, Sri Vijaya Puram
Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 25 sq mm 4 core including taking out old cable complete all as specified and as directed.
Balance work of Construction of Canteen, Common Room, Toilet Block in GGDSD College, Palwal.
[24.2.3.1]LT CABLE 3.1. Laying of underground cable 0.75 metre below ground level covered without sand and bricks including excavation and refilling of trenches.:- 2.5 Sq mm to 10 Sq mm 2 to 4 Core [Through Rate]