Loading…
Loading…
17,022 results • Best match
REPAIRING AND REPLACEMENT OF STREET LIGHTING SYSTEM AT PAIKPARA ROW, RANI DEBENDRABALA ROAD AND OTHER PLACES IN WARD NO-4 UNDER BR- 1, KMC
Laying through Underground Trech.(a)Laying of one No. cable upto 35 sqmm in underground ...
MAINT SERVICES FOR ELECTRICAL DISTRIBUTION SYSTEM OF MD AND OTM ACCN AT SOUTH OF RLY LINE UNDER GE MISSAMARI
... thickness (8 Cm in depth before laying the Cable and 15 Cm in depth after laying the Cable) and consolidated (punned) ...
REPAIR MAINT OF LT DISTRIBUTION NETWORK AND CONNECTED WORKS UNDER GE ARMY DHAR ROAD
Supply, laying , jointing ,testing and commisioning LT underground cable 1100 volts grade XLPE insulated ...
REPAIR MAINT OF EXTERNAL ELECTRIFICATION AND CONNECTED ITEMS AT DHAR ROAD SAMNABANJ AND BATTAL NODE UNDER GE ARMY DHAR ROAD
Supply, laying , jointing ,testing and commisioning LT underground cable 1100 volts grade XLPE insulated ...
SPL REPAIR/ REPLACEMENT OF REWIRING OF BLDG NO P-64, P-66 AND EDUCATION BLDG AT MAHAR OF AGE B/R AND AGE E/M UNDER GE TENGA
... any type of soils/rock for laying LT UG cable through pipe after laying /through the cable trenches will be filling ...
Guna - Up gradation of existing Carriage Watering system as per CAMTECH Design on PFs 1, 2 & 3 (Electrical work)
Supply & fixing of GI pipe of 150mm dia B class with necessary bends & clamps etc. for laying the cable.
REPLACEMENT OF DAMAGED, LT ABC/LT NAKED WIRE LINE, EARTHING OF T/f, MISC. WORK IN SWITCH YARD, 250 KVA IInd Point, CAP. INC. OF DISTRIBUTION Tf 250 TO 400 KVA, CONSTRUCTION AND STRENGHTNING OF 11 KV U/g LINE, AT DIFFERENT SITE UNDER EUDD-MAYOHALL
Laying of L.T. cable of size 1x240 sq mm.from T/F LT Bushing to LT Cubical/LT Pole and suitably connection with 240 sq mm long baarrel All Lugs at both ends.Lugs provided by contractor.
For the work of Shifting of Pole and Line, Electrification giving New connection to various consumers in the area of under 11 kv city side, Ghaziabad-1 by running Tender (Deposit Scheme) under the jurisdiction of SE EUDC-I GZB
Laying of 140/160mm O/D PN-4PE-80 PN-4 grade UV stabilized HDPE pipe as per IS of 6meter, for laying of underground Cable as per RESPO/Norms, including cost of above HDPE pipe.
S&T work in connection with the construction of the subway at closed LC No. KA-61 at Km 199/25-27 between PBA-VSU to facilitate the movement of pedestrian and vehicular traffic in the Adra Division.
... filling and ramming after cable laying as specified in Tech. Circular... Platform/Pucca road after cable laying. DWC pipes will be inspected ...
Repairs of Street light, Misc items and connected works at NSTL Area under AGE I RnD NSTL Visakhapatnam
... road/ hard standing for laying cable through GI pipe and returning,... layers not exc 25cm after laying the cable complete including provision ...
S&T work in connection with improvement in earthing arrangements of signalling assets to enhance system reliability and other signaling work over Adra Division.
... filling and ramming after cable laying as specified in Technical... platform/pucca road after cable laying.
Supply and installation of submersible pump motor sets at expected flood affected River Bed sites Tubewells with supply of necessary substitutes at different water supply scheme under Hura block under PMD, PHE Dte. in the District of Purulia.
Sand cutting and laying of 06 sqmm 3 core XLPE insulated Ar. AL conductor cable through PVC pipe with MS clamp after laying cable & refill the sand.
Supply and installation of submersible pump motor sets at expected flood affected River Bed sites Tubewells with supply of necessary substitutes at different water supply scheme under Kashipur block under PMD, PHE Dte. in the District of Purulia.
Sand cutting and laying of 06 sqmm 3 core XLPE insulated Ar. AL conductor cable through PVC pipe with MS clamp after laying cable & refill the sand.
Additional work of Upgradation and Construction of existing 33 by 3.3 KV to 33 by 11 KV 2x5 MVA Substation of Dalmau A Pump Canal Head at Distt Raebareli Under Deposit Scheme
HT Cable Laying :
Supply, delivery and installation of submersible pump motor sets at expected flood affected River Bed sites Tubewells with supply of necessary substitutes at different water supply scheme under Neturia block under PMD, PHE Dte. in the District of Pur
Sand cutting and laying of 10 sqmm 3 core XLPE insulated Ar. AL conductor cable through PVC pipe with MS clamp after laying cable & refill the sand.
Supply, Installation, Testing, and commissioning of 250KVA Disel generator set with AMF Control panel at Civil court Dhenkanal for the year 2025-26
Cable laying
AUGMENTATION OF CYBER SECURITY INFRASTRUCTURE AT HWP (KOTA).
... 100mm PCC layer. c) OFC cable laying after PCC. d) Concreting ...
Work of 11 KV Line construction and Bifurcation in Business plan 2026-27 under EDC Amroha.
Laying of HDPE Pipe PE-80, PN-6, DN-200mm dia Pipe for laying of 11KV, 3x185Sq.mm, XLPE Cable with HDD (trenchless) method including cable laying.
Dismantling and repairing of 04 nos old pontoon and fabrication of 02 nos new pontoon with commissioning of pump and motor including shading, drum pontoon and fabrication of drum pontoon during Monsoon at Kakri Project
Fabrication pathway, drum pontoon, cable laying, of 15set drum pontoon , making cage, making railing, M.S. plate welding on top of drum pontoon.
UG Cable work for the erection of 33 KV incoming feeder lines for the new 33/11 KV Sujali Sub-station under Islampur Division, WBSEDCL
SUPPLY & LAYING OF KILN - BURNT 1st CLASS BRICKS HAVING PROPER SIZE & SHAPE SUITABLE FOR CABLE PROTECTIVE COVER AS PER DIRECTION OF SITE ENGINEER. ( single cable laying)
SITC of CCTV s at various location inside the premises of Ghitorni STP
Cable Laying Charges in PVC conduit pipe.
Incorporation_of_actuator_operated_delivery_valve_on_delivery_header_and_providing_shade_over_valve_compartment_at_BHALKI_PWSS_under_CMD_PHE_Dte_Dist_Purba_Bardhaman
Cable Laying charges for 4nos cable by Earth cutting with 3" dia x 20 mts Long GI pipe
Part supply of signaling material, installation, testing and commissioning in connection with Upgradation of Data Logger Monitoring System (Efftronic Make) in Divisional Control Office of Ahmedabad Division.
LAN and Communication cable laying and interface with the above data logger related equipment in DLMC Room
Modification/alteration in existing EI and associated S&T work in connection with construction of 2 lane ROB in lieu of L-Xing No.24 (EKL-ETW) at Km.1150/11-13, L- Xing No. 25 (EKL-ETW) at Km.1153/13-15, L-Xing No. 26 (EKL-ETW) at Km.1154/23- 25, L-Xing No. 31 (EKL-SB) at Km.1163/11-13 , L-Xing No. 60 (MNR-FZD) at Km.1226/9-11 in AAP-TDL , L-Xing No. 85-SPL (PNKD-BPU) at Km. 1038/13-15 on CNB-RURA- section
... per RDSO sketches No. SDO /CABLE LAYING/003, issued vide RDSO document... the RDSO drawing no.SDO/Cable laying/008, issued v i d e R D ...
SPL REPAIR TO BLDG NO. T-142 (04 X ACCN) OF T LINE OR MD ACCN OF 52 COY ASC (SUP) TYPE A UNDER GE KAMPTEE AND PROVISION OF 02 X OPEN SHED SHELTER FOR CONVERYOR BELT ASSEMBLY AT 52 COY ASC (SUP) TYPE A AT KAMPTEE UNDER GE KAMPTEE
... poles, structures, stay rods, laying of underground cable etc complete all as specified ...
Guntakal Division- 1. Raising of Platforms to High Level and Provision of New 3m FOB at VPL, BLL, VP, HGI, BNL, KDT, NKDO & GPU - Electrical Arrangements., 2. Raising of Platforms to High Level at IMAM, TIM, SNKG & TKBN - Electrical Arrangements., 3. Provision of New 3m FOB at Hanuman Circle Station - Electrical Arrangements.
Item- 9 amendments and with suitable couplings and clamps for cable laying with all necessary accessories
S&T portion of work for (i) Closure of LC Gate No. KY-21 due to connectivity of road with National Highway at NMP R Yard. (ii) Construction of 01 No. RUB (Road Under Bridge) in lieu of LC No. 86 in Balichak- Jhargram Section (iii) improvement of road approach with cover shed, sump well, pump house & drain at LC No.87 of KGP- TATA Section under ADEN/JGM. (iv) Improvement of road approach with cover shed, sump well, pump house & drain at LC No.95 of KGP-TATA Section under ADEN/JGM.
... filling and ramming after cable laying as specified in Tech. Circular... Platform/Pucca road after cable laying. KHARAGPUR DIVISION-S AND ...
25/SE(T)/GNZ/2026-27
HT Cable Laying :
Provision of 90 watt LED lights with extension on existing poles along perimeter wall and necessary electrical works for improving illumination of outer perimeter at OFDR.
... Soft/loose soil; for electric cable laying in trench size of 6000 L ...
REPAIR/MAINT OF LT/UG CABLE OF ELECTRIC INSATLLATIONS, DB BOX, STREET LIGHT POLES, HIGH MAST POLES ALONGWITH ALLIED WORKS IN COY AREA, OFFRS MESS, JCO MESS AT AEC TRG COLLEGE AND CENTRE PACHMARHI
... 23cm thick (8 cm before laying the cable and 15 cm thick after laying the cable) including watering and ...
REPAIR/MAINTS OF LT OVER HEAD LINES, LT UG CABLES, LT PANEL/FEEDER PILLAR BOXES AND OTHER CONNECTED ITEMS AT KLP AREA UNDER GE BABINA
... 0.75m deep suitable for laying underground cable/MS tubes of any size/dia ...
AUGMENTATION OF ELECTRIC INFRASTRUCTURE FOR MD ACCN AT 3 WING AT AF STN PALAM UNDER GE (AF) PALAM, DELHI CANTT-10
... deep and getting out for laying of cable, poles & stay etc complete ...
Electrical work in connection with Provision of First foot over bridge with cover shed at 5 Station of N.E.Railaway LJN Div, Provision of essential items for Goods shed like Tarpaulin , Major Improvement work like Extension of PF No. 02 & water supply pipeline & sanitation and Provision of RCC OHT, Extension of 09 Nos. Passenger platform at 08 Nos. at different stn. at Ljn-Div, Upgradation of Infrastructure facilities of new coaching depot at GKP, Interlocking of 06 No. LC gates TVU greater than 20000 over LJN DIV.
... trench 33 etc. as required. Cable laying should be as per IS-1255/1983... 1000 mm and 350 mm wide for laying of cable with supply and placing ...
Electrical work in connection with Provision of Automatic Block signaling with Centralized Traffic Control (CTC) system Lucknow- Gorakhpur cant section, Upgradation of maintenance facilities of old coaching depot at GKP, Provision of P.P. shelter at 12 Nos. of different station over LJN-DIV, provision of deep tube well with pumphouse at Tulsipur and Barhni of Lucknow Division, Raising of platform from low level to high level at Gangadham PF-1 & 2 & Biseshwarganj PF-1 & 2.
... trench etc. as required. Cable laying should be as per IS-1255/1983... 1000 mm and 350 mm wide for laying of cable with supply and placing ...
SPECIAL REPAIRS REPLACEMENT TO DG SETS AGAINST BER AND CONNECTED ITEMS AT VARIOUS LOCATONS AT AF STN UNDER GE AVADI
M&L for Sand cushioning to underground cable 8cm before laying the cable and 15cm after laying and strectching the cable (punned down to 18 cm) complete all as specified and directed.
REAPIR AND MAINTENANCE OF 11/0.433 DISTRIBUTION TRANSFORMERS AND 33/11 KV POWER TRANSFORMERS, OUTDOOR HT STRUCTURES AT DRDL/ASL AREA UNDER GE (I) RND KANCHANBAGH, HYDERABAD
Sand cushioning to underground cables 8cm thick before laying cable and 15cm thick after lying ...
ESWCA-05/2026-27
... by brick. On both side of cable by laying brick vertically and bricks... includes digging of trenches, laying of cable in under ground trenches, ...
Setting up of UG Cabling Network, Smart Grid Application incl. SCADA, ADMS, OMS, GIS Mapping, OFC, Control Centre and Distribution Network Automation in Agartala MC Area (Package-A)
... commissioning, testing, Integration, cable Laying Including all the necessary ...
PROVN OF RING MAIN CIRCUIT OF HT CABLE IN JCO / OR MD ACCN AT LALGARH JATTAN MIL STN
... soft/loose soil for taking up/laying cable/pipe etc complete all as ...
PROVN OF 240 KW POWER SUPPLY FOR FAST CHARGER AT MT SECTION OF HQ SWAC UNDER GE (AF) CHILODA
Supply and laying dry Sand cushioning to underground cable with screened, washed river ...
SPL REPAIR LT CABLE IN DSTV MD ACCN IN HISAR MIL STN UNDER GE HISAR
... of 80mm thickness before laying of cable and other layer of 150mm thickness after laying of cable) and punned down to 180mm ...
Hyderabad division: Provision of 24x7 Central Monitoring System setup at Divisional Head Quarters in connection with the work of South Central Railway- Upgradation of KAVACH version 3.2 to 4.0 in low density routes in the existing KAVACH territory- Electrical arrangements.
... of wide 40cm x 120cm for laying of HT cable. After laying of cable the trench should be brought ...
REPAIR / MAINT OF PERIMETER LIGHTING, SECURITY LIGHTS, JUNCTION BOXES AND OTHER CONNECTED ITEMS UNDER AGE E/M OF GE (SOUTH) BANGALORE
... thickness (8 Cm in depth before laying the Cable and 15 Cm in depth after laying the Cable) and consolidated (punned) ...
Hyderabad division: Provision of 24x7 Central Monitoring System setup at Divisional Head Quarters in connection with the work of South Central Railway- Upgradation of KAVACH version 3.2 to 4.0 in low density routes in the existing KAVACH territory- Electrical arrangements
... of wide 40cm x 120cm for laying of HT cable. After laying of cable the trench should be brought ...
SPECIAL REPAIR REPLACEMENT OF EXISTING UNSV BOLLARDS,GATE PILLAR LIGHTS AND CONNECTED MISC ITEMS OF VARIOUS UNIT LOCATIONS AT BORARUPAK-I AND SPECIAL REPAIR REPLACEMENT OF EXISTING UNSV SOLAR SECURITY LIGHTS OF VARIOUS UNIT LOCATIONS AT BORARUPAK-
... layers of 80 mm thick before laying of cable and second layer of 150 mm thick after laying of cable in trenches/ducts including ...
PROVN OF 250 KVA TRANSFORMER ALONGWITH ALL CONNECTED WORKS AT SFF ACADEMY EST-22, THROUGH MES DEHRADUN
... forming bottom surface for laying underground cable, foundation for poles etc ...
Signaling Work in connection with Provision of Track Machine siding at various Stations Over Chennai Division.
420.00 road crossing of cables, laying of DWC/ RCC pipes with collar/... to the original position. Laying of cables is not included in this ...
Replacement Of Old Battery Charger With New Battery Charger At 220 KV SS Barahuwa and 132 KV SS Gida Gorakhpur
... instruction of service engineer(laying of cable with own cost by contractor ...
IMPROVEMENT OF UTTARAN LIGHTING SYSTEM WITH ALLIED ELECTRICAL WORKS AT DIFFERENT UTTARAN AREAS IN WARD NO -48
... with Saddles / clamps.(a)Laying of cable upto 2 core 25 sqmm on wall/surface ...
Gram Chaupal Prithvipura Mein High Mask Light Gram Prithvipura Gram Panchayat Chhatarpur
providing laying P.V.C. cable 2.5 sq mm 3 core