Loading…
Loading…
17,024 results • Best match
Supply and Installation of Street Lighting System from Unit 3 and 4 Main Gate to NHS Type Quarters under Jhanjra Project Colliery
Laying of cable in UG trench (460mm wide x 760mm depth) with brick protection
Day to day maintenance of existing 6 inch dia pipeline with pump shifting/pipe shifting from main quarry to Parej filter plant for the period of one year of PEOCP under Hazaribag Area
... sand and or good soil after laying of cable/ pipe etc in layers of 20 ...
Replacement of damaged cable of Hostel Block at Agricultural Training Centre, Hooghly.
Laying of cable after cutting floor/pavement/wall as per GS for the following Sizes.
Electrical work for provision of pump installation & associated accessories at various locations over Moradabad Division.
including making chase & plastering after laying of cable/digging of cable trench, sand cushioning,
SPL REPAIR TO BLDG NO P-1 (04 QTRS) CAPT MD ACCN AT NORTH COLONY RAIWALA MIL STN
... clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and... and punned to 18 cm after laying of cable complete all as specified ...
PROVN OF 02 X 125 KVA DG SETS AND ALLIED WORKS AT KARZOK UNDER AGE (I) NYOMA
... ground cables 8 cm below the cable before laying & 15 cm above the cable after laying, complete all as specified ...
UPGRADATION OF EXISTING TRANSFORMER FROM 250 KVA TO 400 KVA FOR CORPS ENGR SIGNAL REGT UNDER AGE E/M-II OF GE 865 EWS, LEH
... ground cables 8 cm below the cable before laying & 15 cm above the cable after laying, complete all as specified ...
AUGMENTATION OF POWER SUPPLY AND SPECIAL REPAIR/ REPLACEMENT OF 02 NOS BER TRANSFORMER AT NEW CANTT UNDER GE (WEST) PRAYAGRAJ.
... ground cable (8 cm before laying the cable and 15 cm after laying the cable) in trenches and consolidated ...
Providing and Fitting of Hydrant Irrigation Equipments and Allied Works at B.C Parks Jammu
... digging out Trenches and laying of cable including refilling of trenches.
Supply and Installation Work of Rooftop Solar Photovoltaic Power Plant at Transit Accommodation in 1.Obadenahalli Industrial Area, Doddaballapura, Bengaluru Rural District. 2.Devakathikoppa Industrial Area, Sidlipura Village, Shivamogga Taluk, Shivamogga District 3. Yamunapura Site at B.K Kangrali Industrial Area, Belagavi District. 4.Badanaguppe- Kellamballi, Industrial Area, Badanaguppe Village Kasaba Hobli Chamarajanagara Taluk, Chamarajanagara district. 5. KIADB Industrial Area Kapnur at Kalaburgi District. 6.Plot 1,2,3&4/P2 & Plot no. 94 KIADB Industrial Area Nandur at Kalaburgi District.
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff.2.5 to 25 Sqmm
Replacement of old and outlived POLB's over Kota Division for improving reliability of Signalling installation.
... charge before commencement of cable laying process and only then shall ...
SPECIAL REPAIR REPLACEMENT TO HT LT SWITCHES PANELS HT CHANGEOVER WITH COMPACT SUBSTATION INCLUDING REPLACEMENT OF OLD HTLT CABLES AND ALLIED WORKS AT VARIOUS EM INSTALLATIONS ATAF STN SINGARSI UNDER AGEIAF SINGARSI
Supply, laying and testing cable XLPE insulated, screened, ...
SPECIAL REPAIR REPLACEMENT OF SECURITY LIGHTS ALONG PERIMETER FENCE DEPOT AND UNIT AREA OF DOU IN DINJAN MIL STN
... Supply up to the Panel & Cable laying, Providing Power Cable from High Mast to Panel. ...
PROVISION OF POWER OPTIMIZATION MEASURE AND ALLIED WORKS AT VSN, NAGAPUR (PH-I) UNDER GE AF NAGPUR
Supply, laying & testing cable XLPE insulated, screened, ...
SPL REPAIR REPLACEMENT OF LT UG CABLE OF PERIMETER LIGHTS OF OUTSIDE LOCATION AT AF STN JAMNAGAR
... as per SSR–Part-I before laying of cable and 150mm thick after laying of cable, complete all as specified ...
MAINT OF STREET LIGHTS, SECURITY LIGHTS AND CONNECTED WORKS AT CIJWS VAIRENGTE
... relevant items. (2) During cable laying, necessary minor accessories ...
SITC of silent type 50 KVA Diesel Generator Set with allied E.I. work including strengthening of existing power distribution system at District Reserve Store within the campus of Kadambagachi PHC, North 24 Parganas.
SUB HEAD 2 -- LAYING OF CABLE Laying of cable as below, after cutting ...
REPAIR AND MAINT OF EXTERNAL ELECTRICAL SUPPLY ITEMS OF AIR FORCE COMPONENT HELD UNDER GE BRICHGUNJ.
Supply & laying cable protection pipe of HDPE ...
Bhopal Division: Increase of CSR & crossover reversal on both ends at Banapura station in ET-KNW section involving outdoor work & indoor alteration work in existing EI.
... with DIN 53438 Part-II for laying signaling/telecom cables, channel attachable to each... cover, as per RDSO/STS/E/cable laying PreciseVol-IV and as per ...
10/EDCB/2026-27
Laying of control cable from 33 KV Panel to VCB 2x2.5 Sqmm Aramourd cable under ground in trench making proper complete in all respect as per RESSPO Norms.
Construction of line for giving electric connection to consumers under EDS,Tarikhet under EDD,Ranikhet
Laying of AB cable 1x16+25 MM
ELECTRICAL WORK IN CONNECTION WITH "IMPROVEMENT OF SAFETY & RELIABILITY IN POWER SUPPLY DISTRIBUTION SYSTEM AT SBP SETTLEMENT".
Laying of HT Cable through Trenchless method
Repair and maint of STPs, high mast, parking and garden lights under GE Gurdaspur.
M&L for sand cushioning trenches using fine sand to under ground cable, laid in two layers 15cm before laying the cable & 8cm after laying the cable complete all as specified and directed.
REPAIR AND MAINT OF SOLAR STREET LIGHT AND HIGH MAST LIGHT UNDER GE (A) JAISALMER
... layers of sand 8cm before laying of cable and 15 cm after laying of cable (Total 23 cm) in trenches ...
Conversion of General Classroom to E Class Room Installation of AC and its allied Work at ANM( R) School ,ID BG Hospital Campus under IDBG Electrical Section.
Power & Control Cable: Supply & laying of power cable from control panel to condensing unit. 4 core 2.5 sqmm communition cable.(IDU to ODU ) Make: KEI/Polycab/Havells
Enhancing Block Working and Operational Efficiency by Provision of FN-MUX at IBH LNR-VMA and IBH VMA-THUR on Kota Division.
... 12.06.2014 before commencement of cable laying process and only then shall... trench as per Drg. No. TS/Cable laying/12/03/03 Alt.-1. For achieving ...
Repair and maint of 11KV and 33 KV HT elect installations including connected items such as transformers VCBs CT PT God DO fuses AVR cables etc at Sonamarg incl HAWS under GE 970 EWS
... river sand cushioning to underground cables 8 cm thick before laying cable and 15 cm thick after laying ...
Provision of OFC Backbone for Saftey Critical like BPAC/MSDAC/EI/UFSBI/Kavach over Low Density Network of SECR (Bilaspur, Raipur & Nagpur Division).
... following DIN-53438 part I, for laying Signalling/Telecom Cables. Kg (Top As per Technical Specification STS/Cable- Laying practices Vol. IV ...
WORK SERVICES FOR STANDARISATION OF POWER SUPPLY INFRASTRUCTURE FOR CRITICAL EQUIPMENT AT SU AF UNDER GE MISSAMARI
... thickness (8 Cm in depth before laying the Cable and 15 Cm in depth after laying the Cable) and consolidated (punned) ...
REPAIR AND MAINTENANCE OF PERIMETER SECURITY LIGHTS, STREET LIGHTS, SOLAR LIGHTS AND SOLAR WATER HEATER AND OTHER MISC WORKS
M&L for sand cushioning in trenches spreading and consolidation 8cm thick before laying the cable & 15 cm of sand after laying the cable complete all as specified
SPECIAL REPAIR/ REPLACEMENT OF LT OVERHEAD LINE TO LT UNDERGROUND CABLE AND CONNECTED ITEMS IN THORAT VIHAR, MT AREA AND ADM BN UNDER GE SAUGOR
... cable , 80 mm thick before laying the cable and after laying the cable complete all as specified ...
Renovation of 2 Nos. VIP Rooms and Bar, Restro, ladies Toilet, gents Toilet, Passage and other allied works with E.I work , Furnishing alongwith upgradation of Kitchen at T/C Bahadurgarh.
[24.2.2.2]LT CABLE 2.2. Laying of underground cable 0.75 metre below ground ...
SPECIAL REPAIRS/ REPLACEMENT OF 04 BER DECLARED TRANSFORMERS AT NAD ALWAYE
Supply, laying and testing cable XLPE Insulated,screened, ...
SPECIAL REPIAR FOR REPLACEMENT OF PUMPS AGAINST BER AND PROVN OF 10 X WALL FANS IN BLDG NO PRR-207 FOR OR LIVING ACCN OF HQ 787 (I) AD BDE UNDER GE DEHU ROAD
... shall conform to IS 9137. e) laying power cable from existing starter to ...
WBPHE/EE/JMD/NIeT 11_12 OF 2026-2027
Laying of cable (as item no 3 a)as on Cable Tray all complete as per direction of E.I.C.
SITC of Rooftop Grid Connect Solar Power Plant atJDAOffice Building (with 5 year O AND M)
G. Solar meter and Cable : Laying of array cables to PCU/ DCDB unit along ...
CA NO. GE (AF)/SGR-46/2026-27 REPAIR TO CERTAIN E/M INSTALLATIONS AT NO 2 AREA UNDER GE (AF) SRINAGAR
... consolidation 8 cm thick before laying the cable and 15 cm of the sand after laying the cable but will be measured 18 ...
REPAIR / MAINT OF LT CIRCUITS AND SWITCHGEARS AT NIWARU MIL STN
... cohessive), 8 cm before laying cable and 15cm after laying and punned to 18cm after laying of cable complete all as specified ...
Provision of 2x750 KVA, 33/0.4 KV Sub-Station for cancer care Centre at New Medical College and hospital (DDMCH) Keonjhar.
Excavation of cable trench length by providing all necessary tool, manpower, pump etc, suitable for HT & LT cable laying .
Water Supply Maintenance works in Arani Town Panchayat.
Cable Laying Charges Earth work
PROVN OF WORK SERVICES FOR UPGRADATION OF SEWAGE NETWORK AND GREASE TRAP AT ALL MESSES AT AFSSR UNDER GE (AF) GURGAON
... cesspits, manholes, pier holes, cable laying,sewage/water lines etc complete ...
SITC (Supply, Installation, Testing and Commissioning) of Mini High Mast lighting along with all electrical accessories at Durgapali, Juhar Chowk, Khetrajpur Flyover (Market Side), and Kainsir Village.
Supply & Laying of 50 mm Dia, ISI Marked PVC/HDPE Conduit pipe suitable for UG cable laying.
SITC (Supply, Installation, Testing and Commissioning) of Mini High Mast lighting along with all electrical accessories at Bhatara, Naxapali, NSCB College Chowk, Modipada Park Front, Rasanpur and Chatabar.
Supply & Laying of 50 mm Dia, ISI Marked PVC/HDPE Conduit pipe suitable for UG cable laying.
SITC (Supply, Installation, Testing and Commissioning) of Mini High Mast lighting along with all electrical accessories at SMC Workshop, Sakhipada, Bhalupali, Deer Park and Kluthkani Chowk.
Supply & Laying of 50 mm Dia, ISI Marked PVC/HDPE Conduit pipe suitable for UG cable laying.
SITC (Supply, Installation, Testing and Commissioning) of High Mast lighting along with all electrical accessories at PHD Field
Supply & Laying of 50 mm Dia, ISI Marked PVC/HDPE Conduit pipe suitable for UG cable laying.
Providing, Supplying, Erection, Testing and Commissioning of High mast 12.5m (Ward 38).File No.78/26X6/4.
CABLE LAYING Laying of one number PVC insulated and PVC sheathed power cable of 1:1 kV grade of size not exceeding 25 Sq.mm in the existing RCC Hume/Stone/Ware/G.I. pipe as required.
DEPOSIT-DEPOSIT-Procurement of Display Monitor with extra monitor in courts-SITC of Display monitor and extra monitor in subordinate courts under Ernakulam section- General Electronics Work
OD88258/2024-2025:Supply and laying 20m HDMI cable .Prefered make : NT
SPECIAL REPAIRS/ REPLACEMENT OF BER 306 CEILING FAN AND 24 GEYSER AND GARDEN BOLLARD LIGHTS AT CAD PULGAON
... soil and getting out for laying of cable in any position including ...
Electrical work regarding Provision of AT, where IPS is available, at 4 nos. Mid- section LC gate goomties in Kharagpur Division.(SRC jurisdiction)
... Par 59372.00 Description:- Laying of cable/ cables in underground along the road through cable ...
Electrical work regarding Provision of AT, where IPS is available, at 4 nos. Mid- section LC gate goomties in Kharagpur Division.(SRC jurisdiction)
... Par 59372.00 Description:- Laying of cable/ cables in underground along the road through cable ...