M/R by slip repair and strengthening of left bank of River Kangsabati for a length of 92.00 m at opposite side of Malyan Play Ground to reduce vulnerability of people due to flood during monsoon 2021 at Mouza- Malyan, Block and P.S.-Keshpur, PM.
Loading…