BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at head end area of BCN-1A/B tunnel along the conveyor, TP-1 including FG-3 and 4 floor, MH-2, module-1 to 10 and tail end area at MH-1 including HGTU by head loads on to running conveyor, apron feeder floor and BCN-2AB tunnel including FG-1 and 2 floor by head loads on to running conveyor required in MM-I sub division of MM/CHP/BTPS from 01.04.2026 or actual date of commencement of work to 31.07.2026.
Loading…