Consultancy Services for Preparation of DPR/DTS for Construction of Series of Shirpur Pattern Check Dams, Deepening & Widening of Nala & Recharge Shaft Works in Kalaburagi District
Loading…
Loading…
Opening company profile
Loading company metrics, contact preview, and tender history.
Public records across all portals
Consultancy Services for Preparation of DPR/DTS for Construction of Series of Shirpur Pattern Check Dams, Deepening & Widening of Nala & Recharge Shaft Works in Kalaburagi District
Conducting Reconnaissance and detailed survey at the project site taking L/s, C/s of river/ stream/ halla at 100m intervals both on upstream and downstream side of the site, for a distance of 500m. The index map showing the location of project site and indicating the project site on a topo sheet showing the catchment area. Preparation of plan, sectional elevational drawing of all the components as per detailed Designs computations based on Trial pit/ Trial Bore details, preparation of Estimates as per the direction of Site Engineers. Supplying Require Numbers (about 15 to 20 copies) of DPRs/DTS for placing before TAC/TSC and attending to the observations of TAC/ TSC, till it accords clearance to the Project and supplying the finalized DPR/DTS in required numbers (about 6 copies) to accord Administrative approval and technical sanction etc., complete as per the directions of Engineer-in-charge.
Consultancy Services for Preparation of DPR/DTS for Construction of Series of Shirpur Pattern Check Dams, Deepening & Widening of Nala & Recharge Shaft Works in Kalaburagi District
Conducting Reconnaissance and detailed survey at the project site taking L/s, C/s of river/ stream/ halla at 100m intervals both on upstream and downstream side of the site, for a distance of 500m. The index map showing the location of project site and indicating the project site on a topo sheet showing the catchment area. Preparation of plan, sectional elevational drawing of all the components as per detailed Designs computations based on Trial pit/ Trial Bore details, preparation of Estimates as per the direction of Site Engineers. Supplying Require Numbers (about 15 to 20 copies) of DPRs/DTS for placing before TAC/TSC and attending to the observations of TAC/ TSC, till it accords clearance to the Project and supplying the finalized DPR/DTS in required numbers (about 6 copies) to accord Administrative approval and technical sanction etc., complete as per the directions of Engineer-in-charge.
20 more tenders are hidden. Create a free account to unlock the full tender history, filters, and exports.
This profile is built from what portals disclose publicly. Since several states never release bidder lists or quoted prices, it likely understates the company’s true footprint. A tender is counted as won when the company either received the award or stood L1 at financial bid opening, even if the formal award is still pending. TenderKart compiles these public records independently and has no association with any government portal, buyer, or bidder.