Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chainage km 30.000 to km 49.150 (design chainage km 30.000 to km 46.450) including design and construction of kandi tunnel (total length of tunnel 260 mtr) incl approaches
Loading…