PWD
Lost
Construction of link road from (NH-205) Gara to Mauru km 0/00 to 2/00 ( SH-C/O ROFD in km 0/00 to 1/075 and C/O R/wall at RDs 0/102 to 0/132 and C/o 900 mm dia Hume pipe culverts at RDs 0/480, 0/585, 0/650 and 1/075)
Bilaspur, Himachal PradeshAOC Updated 20 Nov 2023
Himachal
AOC
Himachal
AOC
Est₹17.3 LL1
Ram Murti Govt. Contractor
Price locked
This company
DARA SINGH CONTARCTOR
Price locked