5a - Scope of Supply, 100000000012 Supplying of materials for in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level -Refer Annexure 5a - Scope of Supply, 100000000013 Shifting loading unloading placing Installation testing and commissioning of above mentioned Panel This includes foundation Civil Work-Refer Annexure 5b-Scope of Erection, 100000000014 Shifting loading unloading placing Installation testing and commissioning of above mentioned- Refer Annexure 5b-Scope of Erection, 100000000015 Making end termination with brass compression gland and aluminium lugs for 3point5C X 70sqmm size of PVC insulated -Refer Annexure 5b - Scope of Erection, 100000000016 Making end terminations of 3point5Core 300 sqmm size of cables -Refer Annexure 5b - Scope of Erection, 100000000017 Installation Testing and commissioning of Earthing with copper earth plate 600 mm X 600 mm X 3 mm thick including accessories -Refer Annexure 5b - Scope of Erection, 100000000018 InstallationTesting and commissioning of 25 mm X 5 mm copper strip -Refer Annexure 5b - Scope of Erection, 100000000019 Installation Testing and commissioning of Earthing with GI earth plate 600 mm X 600 mm X 6 mm thick including accessories-Refer Annexure 5b - Scope of Erection, 100000000020 Installation Testing and commissioning of 25 mm X 5 mm GI strip-Refer Annexure 5b - Scope of Erection, 100000000021 Laying of one number PVC insulated and PVC sheathed XLPE power cable Above 35sqmm and upto 95 sqmm-Refer Annexure 5b - Scope of Erection, 100000000022 Laying of one number PVC insulated and PVC sheathed XLPE power cable Above 185 sqmm and upto 400 sqmm-Refer Annexure 5b - Scope of Erection, 100000000023 Laying of one number PVC insulated and PVC sheathed XLPE power cable Above 185 sqmm and upto 400 sqmm -Refer Annexure 5b - Scope of Erection, 100000000024 Laying and fixing of one number XLPE or PVC insulated and PVC sheathed or XLPE power cable -Refer Annexure 5b - Scope of Erection, 100000000025 Mouling through the existing roads in any kind of soil-laying of HDPE pipe 90mm pipes for cables etc-Refer Annexure 5b-Scope of Erection, 100000000026 Excavation of the cable trenches in hard rock not exceeding 1point5 metres in width and lift upto 1point5 metres including -Refer Annexure 5b - Scope of Erection, 100000000027 Mixing Laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level -Refer Annexure 5b - Scope of Erection, 100000000028 Laying of 90 mm dia OD 90 mm and ID 76 mm nominal size HDPE pipe ISI marked along with all accessories -Refer Annexure 5b - Scope of Erection
Loading…