Madhya Pradesh Power Generating Company Limited
Executive Director(Gen.)-Shri Singaji Thermal Power Station-Khandwa - MPPGCL
Awarded
Testing of Safety Valve installed at Boiler side on Boiler drum, water separator equalizing line, Main Steam line, Cold reheat Line (CRH), Hot Reheat Line (HRH) and Soot Blower Station by Online Valtest Method for Boiler unit 1 and 2 at 3 and 4 SSTPP
Addl. C.E.(P and W) SSTPP | East Nimar, Madhya PradeshAOC Updated 23 Sept 2025
MP
AOC
MP
AOC
Est₹6.9 LL1
This company