M R to the eroded bank different stretches in between Ch. 0.00 and 480.00 of Canal D1 along with clearing and removing weeds and floating water hyacinth at cross regulator gate at Ch. 92.00 195.00 333.00 356.00 408.00 and 476.00 for a length of 7
Loading…