Widening from Intermediate Lane to Two Lane and Strengthening at km 5/1-6/2,7/2-9/3 of Azhampoondy- Mazhavanthangal road including Drain at km 5/1-5/4, 5/4-5/6, km 7/8-7/10, 8/500-8/550,and box culvert at km 5/4, 7/10, km 8/6,8/8,8/10-VPM-088
Loading…