Flood Protection and mitigation work for reducing vulnerability of people for Subsidence/Slope failure to Right Embankment of River Deuli near Kesiabheri Road for a length of 190.00 meter RS and 117.00 meter CS by using EUC bullah pilling at M
Loading…