CONSTRUCTION OF 2 LANE 386 MTR LONG EXTRADOSED BRIDGE OVER RIVER SIANG AT DESIGN KM 2PT908 AND 63PT50 MTR SPAN MAJOR BRIDGE AT DESIGN KM 2PT590 IN BETWEEN KM 118.8 JUNCTION OF NH 513 WITH YINGKIONG TO MOYING VILLAGE JUNCTION AT KM 93.50 ON DDM RD
Loading…