Supply of 4 core x 16 Sq.mm AL Cables, Supply of 30 Watt LED Street Light Fixtures, Supply and Laying of 50 mm Dia DWC Pipes direct in ground, Supply and Laying of 50 mm Dia DWC Pipes in the existing trench, Supply of 40 mm Dia HDPE Pipes, Laying of 40 mm Dia HDPE Pipes, Laying of LT cables, End Termination, Supply of 5.0 Meter Octagonal pole, Supply of Single Arm Bracket, Supply of Double Arm bracket, ERECTION OF POLES, ITC of light, EARTHING
Loading…