half inch NB Class 150 hash sign Blind Flange Carbon steel of A 105 Gr II, 1inch NB Class 150 hash sign Blind Flange Carbon steel of A 105 Gr II, 1 and half inch NB Class 150 hash sign Blind Flange Carbon steel of A 105 Gr II, 2 inch NB Class 150 hash sign Blind Flange Carbon steel of A 105 Gr II, 3 inch NB Class 150 hash sign Blind Flange Carbon steel of A 105 Gr II, 4 inch NB Class 150 hash sign Blind Flange Carbon steel of A 105 Gr II, 6 inch NB Class 150 hash sign Blind Flange Carbon steel of A 105 Gr II, 8 inch NB Class 150 hash sign Blind Flange Carbon steel of A 105 Gr II, 10 inch NB Class 150 hash sign Blind Flange Carbon steel of A 105 Gr II, 12 inch NB Class 150 hash sign Blind Flange Carbon steel of A 105 Gr II, 14 inch NB Class 150 hash sign Blind Flange Carbon steel of A 105 Gr II, half inch NB Class 300 hash sign Blind Flange RF Carbon steel of A 350 LF2, 1 and halfinch NB Class 300 hash sign Blind Flange RF Carbon steel of A 350 LF2, 2 inch NB Class 300 hash sign Blind Flange RF Carbon steel of A 350 LF2, 24 inch NB Class 300 hash sign Blind Flange RF Carbon steel of A 350 LF2 BOQ Title Forged carbon steel blind flanges MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Bid Number ( ) : GEM/2024/B/5194582 Dated : 07-08-2024 Bid Document 1/15 Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Primary product category half inch NB Class 150 hash sign Blind Flange Carbon steel of A 105 Gr II Time allowed for Technical Clarifications during technical evaluation 3 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 8 (a). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : The President of india Directorate Of Purchase And Stores CPU, DPS, 1st Floor Vikram Sarabhai Bhavan, Anushakti nagar, BARC, Mumbai : 400 094 Case File No. DPS/CPU/10/D2/7106 Note : In the event of submission of PSDBG by Demand Draft, the same may be drawn in favour of “Pay & Accounts Officer, DPS” payable at Mumbai. PSDBG/Demand Draft should be forwarded to APO DESPATCH, CPU, DPS, 1st Floor Vikram Sarabhai Bhavan, Anushakti nagar, BARC, Mumbai : 400 094. (Acting Through Director, Dps) 2/15 Splitting
Loading…