HYDERABAD METRO RAIL LIMITED
Executive Engineer - III
Awarded
HMR-Corridor-II- Laying 450mm dia RCC NP3 class storm water drain pipe line From HMWSSB office to Ramalayam at Musheerabad x roads to avoid water stagnation in corridor-II.
TelanganaAOC Awarded 27 Apr 2018
Telangana
AOC
Telangana
AOC
Est₹8.2 LL1
Sri Laxmi Ganapathi WLCCS
Price locked
This company
Sri Laxmi Ganapathi WLCCS
Price locked