NHPC Limited
Subansiri Lower Project-NHPC
Tech Rejected
River bank protection erosion control measures on the Right bank of River Subansiri Downstream to Ghancharai 27degree 6minute23.26second N and 94degree 9minute 14.87second E between RD 56.70KM to 57.70KM beyond 30KM 1000m
NHPC Limited Subansiri Lower HE Project Gerukamukh | Dhemaji, AssamAOC Updated 18 Aug 2026
CPPP
AOC
CPPP
AOC
Est₹5.6 CrL1
This company
Khagen Konch
Tech Rejected