Construction of 2-lane specification road with paved shoulder And Tunnel(300 m) at Rabangla NH510 (Singtam-Tarku-Rabongla-Legship- Gyalshing) Package III (Design Chainage from Km 32.500 to 33.600) under SARDPNE Phase A on the EPC basis in Sikkim
Loading…