Supply, Fabrication, Testing & Commissioning of Foam Fire Suppression system
Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Opening company profile
Loading company metrics, contact preview, and tender history.
Public records across all portals
Supply, Fabrication, Testing & Commissioning of Foam Fire Suppression system
Section-C, chapter-6, Supply of Butterfly valve, wafer design, integral seat, bubble tight shut off, class rating PN 16 size- 300 NB as per specification in Section-C, chapter-6, Supply of Butterfly valve, wafer design, integral seat, bubble tight shut off, class rating PN 16 Size- 200 NB as per specification in Section-C, chapter-6, Supply of Check valves, wafer design, integral seat, bubble tight shut off, class rating PN 16 Size- 300 NB as per specification in Section-C, chapter-7, Supply of Check valves, wafer design, integral seat, bubble tight shut off, class rating PN 16 Size- 200 NB as per specification in Section-C, chapter-7, Supply, Fabrication and erection of structural supports, as per specification of chapter-2, Supply and Application of Wrapper coating tape of 4mm thick AWWA C 203 tape, Size of Pipe- 100NB, as per specification of chapter-1, Supply and Application of Wrapper coating tape of 4mm thick AWWA C 203 tape, Size of Pipe- 200NB, as per specification of chapter-1, Supply and Application of Wrapper coating tape of 4mm thick AWWA C 203 tape, Size of Pipe- 300NB, as per specification of chapter-1, Construction of Pipe pedestals for inter connecting joining the existing line to new hydrant line, as per specification of chapter-1, Carbon steel-Butt welding of pipe, fitting, GTAW welding for Root, SMAW for subsequent passes for road crossings, hydrant posts with weld consumables, 10 percent Radiography, as per spec of chapter-1, Carbon steel Socket welding of fittings, Slip on flanges etc by GTAW welding process for Root, SMAW for subsequent passes road crossings, hydrant posts with weld consumables, as per spec of chapter-1, CS piping erection, Installation of flow components like manual butterfly valves, check valves etc. by providing adequate clamping, testing, painting tag numbering, commissioning, as per spec of chapter-1, Removal of existing -old- CS pipe of size 350NB in OHT shaft and laying and erect with new CS 350NB size in OHT shaft
Supply, Fabrication, Testing & Commissioning of Foam Fire Suppression system
Section-C, chapter-6, Supply of Butterfly valve, wafer design, integral seat, bubble tight shut off, class rating PN 16 size- 300 NB as per specification in Section-C, chapter-6, Supply of Butterfly valve, wafer design, integral seat, bubble tight shut off, class rating PN 16 Size- 200 NB as per specification in Section-C, chapter-6, Supply of Check valves, wafer design, integral seat, bubble tight shut off, class rating PN 16 Size- 300 NB as per specification in Section-C, chapter-7, Supply of Check valves, wafer design, integral seat, bubble tight shut off, class rating PN 16 Size- 200 NB as per specification in Section-C, chapter-7, Supply, Fabrication and erection of structural supports, as per specification of chapter-2, Supply and Application of Wrapper coating tape of 4mm thick AWWA C 203 tape, Size of Pipe- 100NB, as per specification of chapter-1, Supply and Application of Wrapper coating tape of 4mm thick AWWA C 203 tape, Size of Pipe- 200NB, as per specification of chapter-1, Supply and Application of Wrapper coating tape of 4mm thick AWWA C 203 tape, Size of Pipe- 300NB, as per specification of chapter-1, Construction of Pipe pedestals for inter connecting joining the existing line to new hydrant line, as per specification of chapter-1, Carbon steel-Butt welding of pipe, fitting, GTAW welding for Root, SMAW for subsequent passes for road crossings, hydrant posts with weld consumables, 10 percent Radiography, as per spec of chapter-1, Carbon steel Socket welding of fittings, Slip on flanges etc by GTAW welding process for Root, SMAW for subsequent passes road crossings, hydrant posts with weld consumables, as per spec of chapter-1, CS piping erection, Installation of flow components like manual butterfly valves, check valves etc. by providing adequate clamping, testing, painting tag numbering, commissioning, as per spec of chapter-1, Removal of existing -old- CS pipe of size 350NB in OHT shaft and laying and erect with new CS 350NB size in OHT shaft
7 more tenders are hidden. Create a free account to unlock the full tender history, filters, and exports.
This profile is built from what portals disclose publicly. Since several states never release bidder lists or quoted prices, it likely understates the company’s true footprint. A tender is counted as won when the company either received the award or stood L1 at financial bid opening, even if the formal award is still pending. TenderKart compiles these public records independently and has no association with any government portal, buyer, or bidder.