Chief Engineer, PWD (R and B)
SE, PWD (R and B), Fifth Circle/EE PWD (R and B) Ambassa Division/Gonda Twisa Division, PWD (General)
Lost
Urgent construction of Retaining Wall at Gonda Twisa-Raishyabari road to Boalkhali H.S. School under PWD (RandB) Gonda Twisa Sub-Division during the year 2026-27 /SH- Excavation for structure, Sand filling, P.C.C, Pucca drain etc.
Gonda Twisa | Dhalai, TripuraAOC Updated 7 Sept 2026
Tripura
AOC
Tripura
AOC
Est₹15.9 LL1
This company