Dismantling of Pipeline 80MM, Dismantling of Pipeline 100MM, ERECTION OF STEEL SCAFFOLDING, 1 inch SS BALL VALVE, Supply and Installing of 1inchDia Drain line, Supply of 80MM Pipeline GI, Supply of 100MM Pipeline GI, SUP GI SORF FLANGE 3 inch 150, SUP GI SORF FLANGE 4 Inch 150, SUP GI BLIND FLANGE 4 inch 150, SUP 90 Elbow GI 4 Inch SCH 40, SUP 45 Elbow GI 4 Inch SCH 40, SUP 90 Elbow GI 3 Inch SCH 40, SUP 45 Elbow GI 3 Inch SCH 40, Laying of pipe 3 inch, Laying of pipe 4 inch, Supply Apply ETCH PRIMER, Supply of 4 inch Dia Dummy Flange, Interm MIO of Pipes, FINAL Coat Paint of Pipes, INST OF FLANGE JOINT 3 INCH, INST OF FLANGE JOINT 4 INCH, Sprinkler Nozzles 0.5 inch, 0.5 inch int thread Coupling, SPLY INSTLN 4 INCH YSTRAINER, SPLY INST 4INCH BUTTERFLY VALV, Fire screen, Design of Sprinkler pipeline