Tuff Boom Float as per BOQ and Scope of work Annexure A enclosed, Deflector Panels for Debris Log Boom Barier as per BOQ and Scope of work Annexure A enclosed, Deep Standard Debris Screen as per BOQ and Scope of work Annexure A enclosed, Long Galvanised Chain with Galvanised Threaded quick link as per BOQ and Scope of work Annexure A enclosed, Long Galvanized A325 Bolt with Heavy Hex Nut Drill Nut and Bolt for Cotter Pin as per BOQ and Scope of work Annexure A enclosed, Galvanised Weldless End link as per BOQ and Scope of work Annexure A enclosed, Galvanised Safety Shackle with Cotter Pin as per BOQ and Scope of work Annexure A enclosed, Tuff Boom Connection plate with Debris Screen Connection Lug as per BOQ and Scope of work Annexure A enclosed, long Galvanized A325 bolt with Galvanized flat Washer and Galvanized loack washer as per BOQ and Scope of work Annexure A enclosed, Removal of Existing Log Boom Line and replacement in all respect and Reinstllation of Log Boom Barrier in reservoir detailed as per Scope of work annexure A enclosed, To and For Transportation charges for Materials Men and Machinery as per Scope of work annexure A enclosed
Loading…