As per tender document
Loading…
Loading…
Opening company profile
Loading company metrics, contact preview, and tender history.
Public records across all portals
As per tender document
a)Removal of existing defective Solenoid valves, Limit switches, junction boxes and connecting cables from its location and identification of cables before removing from the field instruments and junction boxes.b)Installation of newly supplied Solenoid valves, Limit switches and junction boxes in its places.c)Termination of cables at field instruments and junction boxes by putting proper cable glands and cross ferruling.d)Shifting of supplied materials to KPCL stores and site location will be under the scope of agency/contractor itself.e)Handing over of released materials from the field location to KPCL stores will be under the scope of agency/contractor itself.f)Finally loop checking of the cables from newly installed junction boxes to PLC control cabinets and further checking the operation of field instruments from remote operation through PLC/SCADA system under the supervision of I&C engineer.g)The required consumables/T&P required for the work shall be arranged by the bidder/agency only.
As per tender document
a)Removal of existing defective Solenoid valves, Limit switches, junction boxes and connecting cables from its location and identification of cables before removing from the field instruments and junction boxes.b)Installation of newly supplied Solenoid valves, Limit switches and junction boxes in its places.c)Termination of cables at field instruments and junction boxes by putting proper cable glands and cross ferruling.d)Shifting of supplied materials to KPCL stores and site location will be under the scope of agency/contractor itself.e)Handing over of released materials from the field location to KPCL stores will be under the scope of agency/contractor itself.f)Finally loop checking of the cables from newly installed junction boxes to PLC control cabinets and further checking the operation of field instruments from remote operation through PLC/SCADA system under the supervision of I&C engineer.g)The required consumables/T&P required for the work shall be arranged by the bidder/agency only.
11 more tenders are hidden. Create a free account to unlock the full tender history, filters, and exports.
This profile is built from what portals disclose publicly. Since several states never release bidder lists or quoted prices, it likely understates the company’s true footprint. A tender is counted as won when the company either received the award or stood L1 at financial bid opening, even if the formal award is still pending. TenderKart compiles these public records independently and has no association with any government portal, buyer, or bidder.