1 Supply installation testing commissioning of UNINTERRUPTED POWER SUPPLY, 20KVA, 1PHASE and Battery Bank Rack, LUG inter connector wire LS etc, 2 Supply installation testing commissioning of 150Ah 12Volts SMF Battery LEAD ACID, 3 Supply installation testing commissioning of CABLE, CU, 4CX10MM2, XLPE INS, ARM, FR, 4 Supply installation testing commissioning of POW CABLE, CU, 3Cx6MM2, ARM, 1.1KV, FRLS, PVC, 5 Supply installation testing commissioning of ELCB W or MCB, 63A, 4P, 100mA
Loading…