Loading…
Loading…
Opening company profile
Loading company metrics, contact preview, and tender history.
Public records across all portals
steel body evaporative coolers-desert cooler Steel Body Evaporative Coolers-desert Cooler ( 25 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/TYPE Nominal cooling capacity (CuM/hr@WATT) 5000 Cu.M/hr @ 325 WATT 1800 Cu.M/hr @ 185 WATT, 3000 Cu.M/hr @ 225 WATT, 5000 Cu.M/hr @ 325 WATT, 6000 Cu.M/hr @ 375 WATT, 4000 Cu. m/hr @ 250 Watt Type of Air Cooler Body Steel Body - Type of Fitting Without Stand - CERTIFICATION Conformity to Indian Standard IS: 3315 latest - ISI marked false - If ISI marked, CM/L No and date 0 - Availability of Test Report from Central Govt/NABL/ILAC acredited lab to prove conformity to specification true - Name & address of the Lab pathankot - Test Report Number & Date 1241 12/04/17 - 1/3 GENERIC Material of Filter panel, Grill, Top of cooler body, cabinet and sump tank ISI marked to IS 277 latest, Galvanized steel sheet with zinc coating not less than 100 gms/sq.metre - Thickness of ISI marked Galvanized steel Sheet for Filter panel, Top of cooler body and cabinet 0.8 - Thickness of ISI marked Galvanized steel Sheet for Sump Tank 1 - All internal surfaces Painted with Water Resistant paint to IS 9862 latest Yes - Drain Plug material Brass/SS - Fan Size 450 - Blade Material Aluminium (for 5000/6000 cooling capacity) - Fire Retardant Plastic Yes - Fan Motor ISI marked to IS: 996 latest - Fan Motor 4-pole RPM 1400 - Fan Motor Speeds 5 - Power Factor 0.9 - Submersible Pump Conforming to IS:11951 latest - Thickness of wood wool Pad (mm) 15 - Wire Guard for Pads Yes - Water Level Indicator Yes - Minimum length of ISI marked connecting cable with 3-pin moulded Plug Top, 5/6amps 2.5 - * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Gurdeep Lal 145024, 132 Bn BSF, Madhopur Near Thariyal Chowk 25 15 2/3 EMD Required No ePBG Required No
steel body evaporative coolers-desert cooler Steel Body Evaporative Coolers-desert Cooler ( 25 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/TYPE Nominal cooling capacity (CuM/hr@WATT) 5000 Cu.M/hr @ 325 WATT 1800 Cu.M/hr @ 185 WATT, 3000 Cu.M/hr @ 225 WATT, 5000 Cu.M/hr @ 325 WATT, 6000 Cu.M/hr @ 375 WATT, 4000 Cu. m/hr @ 250 Watt Type of Air Cooler Body Steel Body - Type of Fitting Without Stand - CERTIFICATION Conformity to Indian Standard IS: 3315 latest - ISI marked false - If ISI marked, CM/L No and date 0 - Availability of Test Report from Central Govt/NABL/ILAC acredited lab to prove conformity to specification true - Name & address of the Lab pathankot - Test Report Number & Date 1241 12/04/17 - 1/3 GENERIC Material of Filter panel, Grill, Top of cooler body, cabinet and sump tank ISI marked to IS 277 latest, Galvanized steel sheet with zinc coating not less than 100 gms/sq.metre - Thickness of ISI marked Galvanized steel Sheet for Filter panel, Top of cooler body and cabinet 0.8 - Thickness of ISI marked Galvanized steel Sheet for Sump Tank 1 - All internal surfaces Painted with Water Resistant paint to IS 9862 latest Yes - Drain Plug material Brass/SS - Fan Size 450 - Blade Material Aluminium (for 5000/6000 cooling capacity) - Fire Retardant Plastic Yes - Fan Motor ISI marked to IS: 996 latest - Fan Motor 4-pole RPM 1400 - Fan Motor Speeds 5 - Power Factor 0.9 - Submersible Pump Conforming to IS:11951 latest - Thickness of wood wool Pad (mm) 15 - Wire Guard for Pads Yes - Water Level Indicator Yes - Minimum length of ISI marked connecting cable with 3-pin moulded Plug Top, 5/6amps 2.5 - * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Gurdeep Lal 145024, 132 Bn BSF, Madhopur Near Thariyal Chowk 25 15 2/3 EMD Required No ePBG Required No
2 more tenders are hidden. Create a free account to unlock the full tender history, filters, and exports.
This profile is built from what portals disclose publicly. Since several states never release bidder lists or quoted prices, it likely understates the company’s true footprint. A tender is counted as won when the company either received the award or stood L1 at financial bid opening, even if the formal award is still pending. TenderKart compiles these public records independently and has no association with any government portal, buyer, or bidder.