WEST BENGAL INDUSTRIAL INFRASTRUCTURE DEVELOPMENT
Lost
Supply,delivery, Fitting-fixing of column pipes,control panel,main switch, non-return valve, butterfly valves, pipe etc along with installation of existing pumping machinery for the tube well (No.3) near newly constructed over head reservoier at Falt
Falta Industrial Park, Sector-V under WBIIDC | 24 Paraganas South, West BengalAOC Updated 7 Aug 2026
West Bengal
AOC
West Bengal
AOC
Est₹2.1 LL1
JOYDEV ENGINEERING WORKS
Price locked
This company
SHABA ENGINEERING WORKS
Price locked