Loading…
Loading…
2,187 results • Best match
Presurvey for Conducting investigation sub soil exploration, soil testing for Construction of 2 Lane ROB in lieu of L.C.No.2(Manned) at Km 1/3-4 between DMM-CCI Station of Dharmavaram - Pakala section at Km 17/2 of Damajipalli - Tadipatri road in Ananthapuramu District.
Construction of proposed 2 lane ROB and its approaches in lieu of existing Level Crossing No.120 at Km.56.700 of NH18 (New NH40)under Setu Bharatam in the state of Andhra Pradesh under NH(O) for the year 2021 22 on EPC MODE
Construction of 3 arms ROB in lieu of L.C.No.381 @ Nidadavole at road Km 16/240 of Prathipadu-Nidadavole road and at Railway Km 556/15-17 in West Godavari District Sub work: Providing Hire Vehicle to Dy. Executive Engineer (R&B) Sub- Division, Kovvur
Additional Maintenance to V.K.Road Km.24/0 to Pedaraopalli via Chinaraopalli road from Km 0/0 to 3/500 (400 Mtrs length added due to Kantakapalli ROB of VBK Road) from Km 0/0 to 2/0 (VZMD 103) in Vizianagaram District (in bits).
Supply and Fixing of Illuminated with both side walls on 4 sides by projector flood wall washers inside the tunnel with ceiling being covered and entry and exit will have liner pixel fistures with desiing and DMX at RC Road ROB in Tirupati Municipal Corporation.
Package No AP19PIII LSB04 T01 Construction of High Level Bridge at 0 by 910 of PL R and B Road at Bokkellu to PL R andB Road at K Kodapalli of Paderu (M) Visakhapatnam Dt. Est.Cost Rs 544.00 Lakhs Mtch. Rs 14.96 La
Construction of High Level Bridge across Nizampatnam Canal East Thurumella Village on the road from Amarthaluru Inturu RandB road at 1/0 km to Thurumella via M.P. Office in Amarthaluru Mandal of Bapatla district in Vemuru Constituency Est Cost Rs 68.00 Lakhs
Removing rank vegetation, transportation of debris, Paintings to kerbs, dwarf walls, NCFOB, ABFOB bridges, tree stems from parallel bridge to convent junction, Y junction to Navashakthi Nagar, CWC junction to L-15 and truck parking junction to RCL ju
Providing Speed Calming Measures -Rumble Strips, Zebra line Crossings and Caution Boards- for Black spots i.e., Curves, Narrow Bridges and Culvert, Junctions, Cross Roads & Village limits etc., for all MDRs & ODRs in -RandB- Sub-division, Pattikonda in Kurnool district
Lifting Handling and conveyance of MS Pipes from the dismantled temporary diversions at various bridges or structures locations at Km 97.920 at Km 98.630 at Km 99.550 at Km 104.180 at Km 105.100 0.690 and at Km 105.100 2.465
Engaging of 50 Feet Excavator Long Boom Chain Mounted Machine for Removal of Silt and Sullage at Cross Bridges at Sriram Colony bridge, Jayaprakash Colony Extension bridge, Kurnool Road Flyover bridge & 60 Feet Road Bridge in Ongole Municipal Corporation
Sub Work: Shifting of Existing Drinking Water Supply Pipelines with D1 K9 and HDPE Pipes etc. at Construction of Two Lane ROB in Lieu of LC No.2 manned at Km 1/3-4 (Kadiri Gate) between DMM-CCI Stations of Dharmavaram - Pakala Section and Km 17/2 at ... of ROB in ...
Urgent repairs to Major Bridge at Km 4/4 of Link road between RI road -Allur (via) Gagunapalli road and Utukur -Panapudi - Pattapalem road in SPSR Nellore District
Consultancy Services for assisting Authoritys Engineer for supervision of i. Construction of proposed 2-Lane ROB and its approaches in lieu of existing level crossing no.120 of NH-18 new NH-40 ii Widening to 4-Lane of missing link b/w NH-40nNH-69
Consultancy Services for assisting Authority s Engineer for supervision of Construction of proposed 2-lane ROB and its approaches in lieu of existing level Crossing No.95 at Km.183/600 (railway chainage 145/500-600) of NH 205 (Km.9/6 of new NH-71)
Preparation of detailed project report for Construction of ROB atTallabadra gate between Khurda road- Palasa ( SUDV - PSA Block section) in lieu of LC No.372 at Railway km.675/3-5 ie road chainage at km.14/10 of Poondi - Akkupalli - Kasibugga road in Srikakulam District.
Construction of 2 Lane ROB approaches Balance Works in Lieu of L C No 104E SPL3 at Km 97 6 to 7 between Cherukuwada Undi Railway stations on Gudivada to Bhimavaram section at NH Km 170 400 on Kathipudi to Pamarru road of NH214 New NH 165
NAME OF WORK Construction of 3 arms ROB in lieu of LCNo381 Nidadavole at road Km 16 240 of Prathipadu Nidadavole road and at Railway Km 55 15 17 in West Godavari District Sub work Providing Hire Vehicle to Executive Engineer R and B Division Kovvur
Supply and Fixing of Illuminated with both side walls on 4 sides by projector Flood, wall washers inside the tunnel with ceiling being covered and entry and exit witll have liner pixel fistures with desing and DMX at DR mahal Road ROB in Tirupati Municipal Corporation.
Supply, Installation of Replacement of CCTV Cameras n Accessories installed in the year 2015, Replacement in Phase -I and other locations of CCTV Network at 02 Nos. of In-motion Railway Weigh bridges(AKP n WOB), (For detail desc.Refer NIT Doc.)
Construction of E3 Road (Phase III) Extension with Bridges, Underpasses, and 6-Lane elevated corridor with utilities along with interchange connecting to NH-16 in Andhra Pradesh on Lump Sum Contract (Percentage Tender) including DLP of 2 Years (Package XXXXV)
Maintenance and Repairs of weigh bridges at Various locations at Kapulupada dumping yard, Mudasarlova Zone-II, TownKotha Raod Zone-IV, Gajuwaka Zone-VI, Cheemalapalli Zone-VIII of GVMC for the period of 7 months i.e. September 2024 to March 2025
Conducting Pre Survey, Soil exploration, Preparing DPR & Designs for Construction of Minor Bridge at Km 20/2 of Kandukur-Gudlur-Thettu road in Nellore District
Construction of High Level Bridge across Nizampatnam Canal Middle in Thurumella Village on the road from Amarthaluru Inturu R&B road at 1/0 km to Thurumella via M.P Office in Amarthaluru Mandal of in Vemuru Constituency in Bapatla district Est Cost Rs 148.00 Lakhs
Construction of ROB in Lieu of LC.No.2 at railway Km.1/3-4 of Dharmavaram - Pakala Section on Damajipalli - Tadipatri road at Km.17/2 in sri Satya Sai District.Sub work:-" Dismantling existing structure and cleaning away debris of Damajipalli - Tadipatri road in Sri satya sai District."
Conducting detailed investigation Survey getting approval preparation of land plan schedules and structural estimates etc for the work of Construction of ROB in lieu of LC No 431 Railway Km 640/ 30- 32 on V-V section in Pithapuram municipal limits on Samalkota - Uppada road in Kakinada District
Construction of R.O.B at Railway Km 246/9 to 247/0 of Secunderabad Dhone Section in lieu of L. C. No 135 E in KM 359/2 4 of Chittoor Kurnool Road, NH 18 (within city limits of Kurnool City) in Kurnool District. Sub Work: Providing Lighting to ROB
Construction of 100 bedded ESI Hospital Building and 32 Nos Residential Staff quarters for ESIC at Rajamahendravaram,AP SH : Providing and fixing Galvanised coated strctural steel for bridge work to carrying for medical gas pipe line form LPG Plant room to 100 bedded hospital building
Signalling & Telecom arrangements in connection with Proposed construction of New RCC Box bridges along with Catch water drain, retaining walls at 1) Km.6/5-6 between NLPD-PRCA and 2)Km.21/30-32 between TEL-VJA stations over Guntur Division.
Outsourcing of services of 9Nos contractors workmen to assist in Up keeping of Stores sheds and office floor cleaning Toilets cleaning in stores office and 2Nos of weigh bridges daily for a period of eleven months that is from 01.05.2019 to 31.03.2020
Repairs and Operation and Maintenance of Existing 140 Nos CC TVs to Dumper bins and STPs and vulnerable dumping points and Excel Points and Canel Bridges in various locations in Circle II area for regular monitoring as part of Swachh Survekshan 2026
Custom Bid for Services - Hiring of One no of Road vehicles for a period of 36 months for use of SrDENBridgesWAT in connection with official duties inspection maintenance of Steel Girder Bridges on PSAVSKP Main Line RGDAVZM RV line KRPUSPRD KR line ..
Construction of bridge on road from Kotagunnala to Gosayugondi, Artanapalli village Chintapalli mandal.
Monsoon Action plan - 2026 Removal of Silt from Kankaragunta ROB Peekalavagu culvert to AT Agraharam main road and Construction of Damaged Wall in Peekalavagu near ROB culvert in Div.No. 24 UNDER AE-5 SECTION (5th Call)
SW-I: BZA Division: GDV-BVRM Section: Proposed Construction of Bridge No. 4 near LC No. 52 between GDV & OTR stations under ADEN/BVRM jurisdiction. SW-II: BZA Division: GDV-MTM Section: Dismantling of existing Gate lodge LC No. 3 between GDV & NUJ stations under ADEN/BVRM jurisdiction.
Consultancy Services for Supervision of Construction of ROB and Approaches on NH 165 Bypass in the state of Andhra Pradesh on EPC Basis at Railway Km 4 of 0 to1 and at NH Km 10 of 906 and at Railway Km 74 of 8to 9 at NH Km 46 of 430
Construction of 2 Lane ROB and approaches in Lieu of L.C No. 104E SPL3 at Km. 97 of 6 to7 between Cherukuwada and Undi Railway stations on Gudivada to Bhimavaram section at NH Km 170 of 400 on Kathipudi to Pamarru road of NH 214 New NH-165 in Wes
Construction of proposed 2-lane ROB and its approaches in lieu of existing level Crossing No.95 at Km.183/600 (railway chainage 145/500-600) of NH205 (Km.9/6 of new NH-71) under Setu Bharatam in the State of Andhra Pradesh under NH(O)on EPC(3rd call)
Urgent repairs to the roads 1) Eluru ROB to meet at Km 0/0 of E K road via Clock tower road 2) Road mini Bye pass road from km 0/2 of E P road to 0/0 of E K road Via Vangayagudem in West Godavari District.(by HMP)
Pre survey estimate for Construction of ROB in lieu of LC.No.181 at Railway Km 259/4-5 of Guntur - Nandyal section at Km 2/451 of Nandyal - Yerraguntla new Railway line and Km 290/2-4 of Chittoor - Kurnool Road (old NH-18) Nandyal town limits) in Kurnool District
Desilting of Outfall drain to south side of Nunna Road from Singh nagar ROB to Pipula Road Junction in 58th and 59th Divisions and Desilting of Outfall drain to UDA Colony road from Rajiv Nagar Road to NSC Bose Nagar main road in 63rd Division.(by manual means and mechanical means)
Providing Kerb Wall and Fencing under Guntur ROB open area near Darga in Bapatla Municipality
Strengthening of Steel foot bridges at Km 73 700 of RBLLC
Providing 2 Nos. of foot bridges in Chintakunta Section of RBLLC
Guntur Division: Proposed Geotechnical Investigation and preparation of design for Construction of Road Over Bridges under Jurisdiction of DyCE-GS-GNT. Submission of Detailed Design of Foundation, Sub-Structure & Superstructure, casting and testing of test piles etc. for ROBs under DyCE-GS-GNT Jurisdiction.
Hiring of 1.0 MT capacity truck for carrying railway materials as per the direction of Engineer-in-charge including driver, helper, diesel oil, Lubricants etc., for a period of Eighteen Months for SSE/Br/WAT sections under the jurisdiction of Asst. ... Engineer/ Bridges /WAT.
Hiring of 1.0 MT capacity truck for carrying railway materials as per the direction of Engineer-in-charge including driver, helper, diesel oil, Lubricants etc., for a period of Eighteen Months for SSE/Br/WAT sections under the jurisdiction of Asst. ... Engineer/ Bridges /WAT.
SW-II BZA Division: BZA-VSKP Section: Eluru Station. Proposed Construction of 12m Wide Foot Over Bridges from PF-1 to 2&3 and Circulating area in ABS Phase-2 works at Eluru station in SSE/Works/EE section in ADEN/EE Sub-Division.
1)Provision of standby power supply to Gate Lodges etc. of Non-interlocked LC Gates on KK Line, KR Line & NG Line in Waltair Division.2)Provision of 20Kwp solar rooftop in connection with Electrification works in connection with "Simhachalam- ... wide FOB towards ...
Providing BT platform for parking four wheelers on northern side of two wheeler parking area Bus boarding point TOMD Garage PCN and concrete pathway on southern side of ROB from ROB east end to PNN entrance at Sullurpeta.