Loading…
Loading…
1,214 results • Best match
Repair and maintenance of 60 M span motorable bridge at Kangni over Hathal Nallah under Safety Audit of Bridges.
Estimate for illumination of Govt. buildings/bridges during independence/Republic Day celebrations falling under Jurisdiction of Electric Division Budgam
Repair and maintenance of 46 M span motorable bridge at Mawa over Teryath Nallah under Safety Audit of Bridges.
RDDDC2627105298-(CONST OF OF 2 NO FOOT BRIDGES AT DIFFERENT SPOTS OF IRRIGATION CANAL AT HAJIBAL BANDERPORA BLOCK KAKAPORA)
STAGE Draina to Gurakha via Cheeka link road, Soura to Kungla link road, Adjoining Foot / Motorable Bridges (4th Call)
RDDDC2627105298-(CONST OF OF 2 NO FOOT BRIDGES AT DIFFERENT SPOTS OF IRRIGATION CANAL AT HAJIBAL BANDERPORA BLOCK KAKAPORA)
PLZ REFER NIT
Strengthening of Aquaduct at RD 24765M Including of protection of foot bridges at RD 24660M and RD 25386M of MRC.
Annual maintenance contract for maintenance of plants fixed in ornamental steel work frames on fly over and Tawi Bridges Jammu
Repair Renovation of Foot Over Bridges being used largely largely by Public at Manglian Near Forebay and Mandal CHEP I
Annual maintenance contract for maintenance of plants fixed in ornamental steel work frames on fly over and Tawi Bridges Jammu
Illumination of Govt. buildings/ bridges/ flyovers during Independence/ Republic day celebrations for ED Kupwara under UT capex Budget 2026-27
REFER BOQ
BOQ
refer boq
BOQ
BOQ
REFER BOQ
REFER BOQ
AS PER NIT
please refer BOQ
Refer BOQ
AS PER BOQ
AS PER NIT
As per NIT
As per NIT
As per NIT
Construction of 190.52 Mtr. RCC Bridge/Vented Causeway at RD 1.175 KM 2nd of Road Rajpura to Bhaloora Via Nadahla, Package No. JK21-3005B1, PMGSY-III BATCH-II OF 2023-24, Block-Rajpura, District Samba
Balance work for construction of left Right side approaches of Dehrian Chakli foot bridge by way of construction of Edge B Wall providing and laying WBM Gr II 150mm thick in two layers 75mm thick each WBM Gr III 75mm thick n 25mm thick OGPC. Leng
Preparation of DPR for Construction of 04 No of Bridges of Span 50m 30m 20m 20 m in District Baramulla PMGSY Division Uri
Construction of Retaining wall and crated wall on Rajouri Dodaj road km 13th Malhut RD 200 400 under State Plan Bridges.
illumination using Tri Colour Decorations Strings to various Government Buildings/ Govt. Offices and other prominent locations like Bridges, Road Sides etc
Illumination of Govt. Buildings bridges flyovers during independence Republic Day celebration and other Govt. functions within the jurisdiction of ED Kulgam
Illumination of Govt. buildings/ bridges/ flyovers during independence/Republic Day Celebrations under UT Capex Budget 2026-27 for 15th August 2026
Empanelment of Engineering Consultants for Providing Consultancy Services (Architectural, Structural, Etc.) for Various Building / Bridges/ Road Works of RNB Division Pattan.
Illumination of Government buildings Bridges Flyovers during Independence Republic Day Celebrations and other Govt. functions under the Jurisdiction of ED Awantipora
Design Construction of Bridge on Nallah Sukhnag at Beerwah on Magam Beerwah road (2x35 Mtr. Span) on EPC MODE (ENGINEERING PROCUREMENT AND CONSTRUCTION MODE)
Balance work of RUB No. 173 at Km 69.422 (Road Km 72.507) on Pathankot-Jammu section of NH-44 in the UT of Jammu and Kashmir
Construction of 20.00 Mtr. RCC Bridge/ Vented Causeway at RD 375 Km 7th of Road Ladwal to Chhan Laldin Via Pansar, Package No. JK07-3016B2, PMGSY-III BATCH-II OF 2023-24, Block-Marheen, District Kathua
Preparation of DPR for Construction of 04 No of Bridges of Span 50m_ 30m_ 20m_ 20 m in District Baramulla PMGSY Division Uri
Design, manufacturing, testing placing in position ofbearings with accessories of approved brand andmanufacture for Bridges, as per the design parameters of each bridge (structuraldrawings enclosed) incl., third Party design proof checking
Please Refer BOQ
Please Refer BOQ
BOQ
Refer BOQ
BOQ
Please refer BOQ
please refer BOQ
REFER BOQ
refer BOQ