Loading…
Loading…
3,204 results • Best match
Shoulder filling, Painting, Figuring on CD, J.C. Bridge etc. work on different roads under Sub Dn. Seoni Malwa, section Seoni Malwa. 1st Call, PAC Rs. 19.31 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i
Shoulder filling, Painting, Figuring on CD, J.C. Bridge etc. work on different roads under Sub Dn. Seoni Malwa, section Dolariya. 1st Call, PAC Rs. 19.96 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c
B.T. Renewal of Seoni Malwa Byepass Missing Link road and various roads of Seoni Malwa Sub Division. 1st Call, PAC Rs. 199.77 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days ex/c rainy season.
Repair of Bridge and Culvert various road under Sub Dn Khirkiya.
Repair of Bridge and Culvert various road under Sub Dn Harda .
TRD/OHE work for (A) Construction of LHS with Road cover shed, sump and pump in lieu of LC No.-4, 20, 52 and 62 & (B) ROB work at LC No.-16,231 and 234 of Jabalpur division.
Construction of ROB at LC No 120 (Ratlam-Chanderia Rail Section K.M 241/15-16) on Neemuch- Chhoti Sadri Road MDR Including Pole Shifting, Height Raising Underground HT/LT Line Crossing External Street Light Electrification. District Neemuch
Construction of Balance Work of ROB in Lieu of LC no 23 on Ujjain-Nagda Rail Section (KM 48/9-10) on Ujjain Badnagar road in District Ujjain in The State of Madhya Pradesh on EPC Mode
Construction of Railway Over Bridge at LC No 192 Between Dhonswas- Ratlam Railway Section at the Location of K.M 373/11-13 (Ratlam Chanderiya Rail Section) of Western Railway Including Electric Pole Shifting of ROB District Ratlam.
Const of bridges in ward no .04 and 10 at Saame river and CC Road in ward no. 01, 03, 05, 06, 07, and 14 and Under CM Infra 4th Phase Scheme.
Construction of Main Road Thonga Mair Tola to Jamua No.-02 Road Length- 3.30 Km., Under PWD Sub Division. Majhauli, Distt-Sidhi (M.P.) PWD Road and Bridges SOR w.e.f 25-03-2022
V.I.P. and V.V.I.P. Programme Stage and Helipad, Barricading , App Raod and Other Work For Loksabha Election 2024 Under Sub. Dn. Churhat Distt. Sidhi, PWD Road and Bridges SOR w.e.f 25-03-2022
Strengthning work of Chandohidol Madwas Hingmaniya Road in Km 6/6 to 8/2 L- 1.73 Km, Under Sub. Dn. Majhauli Distt. Sidhi PWD Road AND Bridges SOR w.e.f 25-03-2022
Construction of Rastriya Rajyamarg NH-39 Upani to Uttar Tola Approach Road, Length- 3.06 Km., Under PWD Sub Division. Sidhi, Distt-Sidhi (M.P.) PWD Road and Bridges SOR w.e.f 25-03-2022
Construction of Barkheda Dor to Hinotiya road length 2.25 km PAC Rs. 211.30 lakh First Call on Road and Bridges SOR 11/04/2025 work period 120 days i/c rainy season
V.I.P. and V.V.I.P. Programme Stage and Helipad, Barricading , App Raod and Other Work For Loksabha Election 2024 Under Sub. Dn. Majhauli Distt. Sidhi, PWD Road and Bridges SOR w.e.f 25-03-2022
V.I.P. and V.V.I.P. Programme Stage and Helipad, Barricading , App Raod and Other Work For Loksabha Election 2024 Under Sub. Dn. Sidhi Distt. Sidhi, PWD Road and Bridges SOR w.e.f 25-03-2022
Const. of N.H. 39 to N.H. balance work up to Vill. Mohaniya App. Road, L- 1.00 Km, Under Sub. Dn. Churhat, Distt. Sidhi PWD Road and Bridges SOR w.e.f 11-04-25
Providing, Laying, Jointing, Testing and Commissioning of 400 mm dia D.I. Pipeline and Interconnection, Allied civil works at Nandbag main road for under construction of Bridge under zone 01 Ward 16(as per schedule)FIRST CALL
Prepration of DPR Including Survey, Planning, Design, Drawing and Estimation work of Drains, Bridges, Culverts, CC Roads, Land Scapping work, BT Roads, Electrical Development, Water works, Beautification work, Fountains work etc
Preparation of detailed project report for construction of flyover, over Swarn Rekha Nalla in Gwalior City from Laxmi Bai Smarak to IIITM college i/c Geotech investigation, Traffic survey, Geometrical survey, PPT and complete detailed survey and incl
Widening of Submerible Bridge across Morar river on nadi paar taal from Morar Thana to Shamshan Ghat road
CONSTRUCTION OF UPGRADATION TWO/FOUR/SIX LANE ROAD FROM HARIFATAK LALPUL TO MULLAPURA TO SHANKRACHARYA CHAURAHA TO CHANDUKHEDI, LALPUR TO CHINTTAMAN GANESH JAWASIYA INCLUDING 2 NOS ADDITIONAL 2 LANE ROB AND ADDITIONAL 2 LANE BRIDGE OVER SHIPRA RIV
Construction of ROB at LC no 79-B KM 152/22-24 Situated Between Akodia-Shajapur Station in Ujjain-Bhopal Section Shujalpur Including Electrical Pole Shifiting Increase Height and Dismentaling of 33KV/11 KV LT Line Etc.District Shajapur
Repair of bridge/Culvert of various Road Under P.W.D. Sub Division Amarwara
MOW, AR, SR Work of RB, NRB for repair work of sign board, information board with denting, painting, figuring under PWD. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 19.96 Lacs on Road Bridge Works SOR 25.03.2022 and BUILDING Works SOR 01.01.2024 (Ammend
Constn. of Ratwada to Sail road Gram Panchayat Ratwada, Length 0.37 Km., Constn. of 01 Row HPC near Gopal Yadav, Shakher Yadav khet at village Bhiladiya Kalan. 1st Call, PAC Rs. 2.54 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Co
Zonal Work of Maintenance, B.T. Patch repair of roads in P.W.D. Division No. 1, Narmadapuram. (For F.Y. 2026-27). 1st Call, PAC Rs. 80.00 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 365 days i/c rainy season.
Construction of Main Road NH-39 Badhaura (Baniya Tola) to Kargil Approach Road , Length- 3.20 Km., Under PWD Sub Division. Sidhi, Distt-Sidhi (M.P.) PWD Road and Bridges SOR w.e.f 25-03-2022
Strengthening of Kusumkui Jhaklay Gadariya Harpalpur Hathnapur and Bhangiya to Narayan Colony Amlada road. 1st Call, PAC Rs. 484.79 Lacs on Road and Bridges SOR 25.03.2022 (Ammendment upto date), Completion period 150 days.
Repairs of Bridges, Culverts, Protection Wall and Shoulders work and different roads in Sub Dn. Pachmarhi. 1st Call, PAC Rs. 9.62 Lacs on Road SOR 25.03.2022 (Ammendment upto date), Completion period 90 days.
Construction of Balance Track linking for BG track, linking track at level crossings, bridges between SURSARAIGHAT ( Including yard) - DEORAGRAM ( excluding yard ) and Mahdeiya- Singrauli of Katni- Singrauli Rail Doubling Project ( WCR) Pkg-09
Custom Bid for Services - Spraying of water through mobile tanker of capacity 5000 Lts for dust suppression at Weigh Bridges of Chhinda for the period of 03 years under RWACDA of Pench Area
Construction of Badhaura Bus Stand to Ghat Crassing PMGSY Road Kubari Approach Road, Length- 1.92 Km., Under PWD Sub Division. Sidhi, Distt-Sidhi (M.P.) PWD Road and Bridges SOR w.e.f 25-03-2022
B.T. Renewal Work on Sidhi Kamrji Mauganj Road in Km 1/2 to 3/2 L- 2.20 Km, Under Sub. Dn. Churhat Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
B.T. Patch repair on various roads at Makhan Nagar Section, under Narmadapuram Sub Division. 1st Call, PAC Rs. 19.79 Lacs on Road and Bridges SOR 25.03.2022 (Ammendment upto date), Completion period 90 days.
Strengthning work of Belha Mahua Naudhiya Devarth Road in Km 3/6 to 9/4, L- 5.80 Km, Under Sub. Dn. Majhauli Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
Preparing DPR for Construction of road from newly constructed ROB (on railway) Harda byepass junction to Narmadapuram Bhopal (NH 69) via Fefartal village, through behind SPM. 1st Call, PAC Rs. 4.08 Lacs on Road Bridge SOR 25.03.2022 (Ammendment upt
For Shifting of Existing 11 KV/ 33 KV line, DTR and LT Line Hinderance on Construction of ROB 255 at Bhopal - Bina Railway Crossing, Near Chopad - Kalan Village, Bhopal at Bhopal - Vidisha Road District Bhopal and Providing Street Light on Newly
Execution of Foundation Substructure and earthwork in approaches for Major Bridge No_17 SONE RIVER of span 5x45.70 M Open Web Through Steel Girder
CONSTRUCTION OF CC ROAD AT WARD NO. 05 FROM UNDER BRIDGE TO RAJEEV JAIN HOUSE MANDIDEEP
Four Laning of existing road with PQC(Pavement Quality Concrete) from Kanta More to Circuit House, Shukla More to RUB, and extension of culvert between Shukla More and Circuit House turning along with provision of comprehensive maintenance for 5 year
Const. of Main Road to Raikhore Kolan Basti to Yogendra Singh House App. Road , L- 0.90 Km, Under Sub. Dn. Churhat, Distt. Sidhi PWD Road and Bridges SOR w.e.f 11-04-25, 2nd Call
B.T. Patch Repairs on Seoni Malwa Bye pass road in Km. 1 to 3. 1st Call, PAC Rs. 19.98 Lacs on Road and Bridges SOR 25.03.2022 (Ammend-ment upto date), Completion period 90 days.
Repairing of Bridges, Culverts, Protection wall different roads, Sub Division Seoni Malwa. 1st Call, PAC Rs. 19.39 Lacs on Road Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 120 days i/c rainy season.
Special Strengthning work of Nakjhar Lauar (MDR) Road in Km 1/2 to 25/8, Total L 24.80 Km, Under Sub. Dn. Sidhi Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
Const. of Siraula Sulkhan Basti to Kahasadol Jogi pahadi Patel Singh House Beside Nahar App. Raod , L- 3.00 Km, Under Sub. Dn. Majhauli, Distt. Sidhi PWD Road and Bridges SOR w.e.f 11-04-25
Const. of Silwar Madwas Main Road to Bagahiya Tola Via Shri Babalu Singh House App. Raod , L- 4.50 Km, Under Sub. Dn. Majhauli, Distt. Sidhi PWD Road and Bridges SOR w.e.f 11-04-25
Wooden planks of 900 Lx 250 W x 150 T mm.Material should be as per RDSO letter No. SD.Disaster.MGT, dated 14.10.2011 and RDSO issued IRS Specification for solid wooden sleeper on bridges and crossings
REPAIR OF BRIDGE/CULVERTS ON VARIOUS ROAD UNDER SUB DIVISION NO. 1 KATNI