Loading…
Loading…
3,204 results • Best match
A/R, S/R work of Cement Concrete shoulders, drain, central verge, footpath, paver block, renovation of rotary and repair of culverts and bridge work of Road Section No. 7B, 8 and 18 Under M-3 Sub Division PWD Bhopal.
Construction of Railway over Bridges in lieu of L.C no 06 in KM 996/4-5 on Bina-Katni Section and on Khurai-Khimlasa Road (in Khurai City) District Sagar in the state of Madhya Pradesh. on EPC Mode
EMPANELMENT OF ARCHITECT AND ENGINEER FOR THE WORK RELATED TO CONSTRUCTION OF BUILDINGS ROADS BRIDGES CULVERTS DEVELOPMENT OF GARDENS CROSS RAODS ETC AND ALL OTHER CIVIL WORK AT MUNICIPAL CORPORATION OR WORK HAVING COAST LESS THAN rs 50 LAKH
EMPANELMENT OF ARCHITECT AND ENGINEER FOR THE WORK RELATED TO CONSTRUCTION OF BUILDINGS ROADS BRIDGES CULVERTS DEVELOPMENT OF GARDENS CROSS ROADS ETC AND ALL OTHER CIVIL WORK AT MUNICIPAL CORPORATION OR WORK HAVING COAST MORE THAN rs 50 LAKH
Construction of High Level Bridges on Halon river near Gadi on Gadi Motinala road and Kashmiri Nala near Gadi on Sijhora Gadi road on Turn Key basis including construction of approach roads. This includes work of urvey,necessary investigation,
EMPANELMENT OF ARCHITECT AND ENGINEER FOR THE WORK RELATED TO CONSTRUCTION OF BUILDINGS ROADS BRIDGES CULVERTS DEVELOPMENT OF GARDENS CROSS RAODS ETC AND ALL OTHER CIVIL WORK AT MUNICIPAL CORPORATION OR WORK HAVING COAST LESS THAN rs 50 LAKH
Const. of Amarpur Mohaniya Road in Km 4/10 Habeeb Khan House to Railway line Mahendra Singh House Vill- Badkhara 740 , Under Sub Dn Churhat, Distt. Sidhi PWD S.O.R. Road And Bridges SOR W.e.f 29-08-17 Plan Work
EMPANELMENT OF ARCHITECT AND ENGINEER FOR THE WORK RELATED TO CONSTRUCTION OF BUILDINGS ROADS BRIDGES CULVERTS DEVELOPMENT OF GARDENS CROSS ROADS ETC AND ALL OTHER CIVIL WORK AT MUNICIPAL CORPORATION OR WORK HAVING COAST MORE THAN rs 50 LAKH
BT Patch repairs on Khargawali to Janakpur, SH 22 to Shukkarwada, Khargawali Tamcharu road at Makhan Nagar Section, Sub Dn. Narmadapuram. 1st Call, PAC Rs. 16.37 Lacs on Road Bridges SOR 25.03.2022 (Ammendment upto date), Completion period 60 days.
Track linking for BG track (manually) including Supply of all P Way fittings and materials from RDSO approved firms, Linking track at level crossings bridges and Linking Points X ings GNDI_BRGW Station yard in connection with KTE-SGRLDoubling Project
Ruthiyai-Maksi section: Construction of shed over approaches & Provision of Open drain of LHS at LHS- 99, 103, 162 & 176 (Total 4 Nos) and Fixing of height gauge at LHS- 79, 95, 144, 156, 182, RUB-1191/1, 1190/2 (Total=7 Nos) under ADEN/Shajapur Section.
Supervision and Quality Control Consultancy of Bridge works being constructed under PMGSY/other Schemes
Supervision and Quality Control Consultancy of Bridge works being constructed under PMGSY/other Schemes
Supervision and Quality Control Consultancy of Bridge works being constructed under PMGSY/other Schemes
CONSTRUCTION OF CC MAIN ROAD OF GUPTA COLONY AND CC ROAD AND DRIAN NEAR NAINA GIFT SHOP IN GUPTA COLONY AT WARD 71 IN ZONE 11
Shifting of Electric Lines and Transformer Substation at Proposed Const. of ROB on Level Crossing No. 1 Km. 630/12-13 on Khandwa-Akola Meter Gauge Sec and Between pole No. 567/55-57 to 567/56-58 on Itarsi Bhusawal Road Gauge Railway Line Near Teen
B.T. Patch Repairs for Restoration in Seoni Malwa Babrighat road to Gadariya Bhangiya Harpalpur road (Kusumkui Gadariya Harpalpur road) Km. 1 to 12.10, Sub Dn. Seoni Malwa. 1st Call, PAC Rs. 19.89 Lacs on Road and Bridges SOR 25.03.2022 (Ammendment u
Construction of Submersible Bridges in Rehli Vidhansabha Sagar. 1. Bridge across Gadheri River in Km 1/2 on Hinota-Garhakota I/C approaches Road 2. Bridge across Nalla Between Police Station and Tilak Ward in Garhakota town I/C approaches
B.T. Patch repairs on Simrodha to Khairi app. Road, Chourahat app. Road, Talkesri app. Road, Sangakheda approach road at Makhan Nagar Section, Sub Dn. Narmadapuram. 1st Call, PAC Rs. 15.39 Lacs on Road and Bridges SOR 25.03.2022 (Ammendment upto date
B.T. Patch Repairs for Restoration in Kusumkui Jhaklay Gadariya Harpalpur Hathnapur road (Khapariya to Hathnapur road) Km. 1 to 11, Sub Dn. Seoni Malwa. 1st Call, PAC Rs. 16.70 Lacs on Road and Bridges SOR 25.03.2022 (Ammendment upto date), Completio
Shifting or handling of loose weight 50 kg each for calibration and checking of Road Weigh Bridges 2, 3, 4, 5, 6, 7, 8, 9 and 10 installed at Jayant Project for a period of two years i.e. 730 days
Track linking for BG track (manually) including Supply of all P Way fittings and materials from RDSO approved firms, Linking track at level crossings bridges and Linking Points and X ings, packing of track of Katni Singrauli Rail line Project
Modification and Extension of existing FOB at KMZ Murwara Railway Station including civil works of FOB foundation piers and slabs and other miscellaneous works related to platform works in connection with Katni Grade Separator Project in Katni dist
REPAIR OF CULVERTS AND BRIDGES UNDER SUB DN. HARDA
Repair of Culvert and Bridges under sub dn khirkiya
Supply of P Way Materials, Special PSC sleepers, Thick web Switches ISEJ and Balance Track linking work for BG track (Manually), linking track at bridges, and Linking on Diversion,from Mahroai (MFQ) - Beohari (BEHR) and JOBA,GNDI and BRGW Yard
Monthly Basis Cab & Taxi Hiring Services - MUV; 2500 km x 320 hours; Outstation 24*7
Custom Bid for Services - Washing and ironing Double bed - bed sheet with pillow cover One double bed sheet of standard size and 2 no pillow cover count as one unit for payment Work is to be carried out to the satisfaction of SSE works C IND Rate inc.., Custom Bid for Services - Washing and ironing Single bed -bed sheet for cover fly Work is to be carried out to the satisfaction of SSE works IND Rate includes all consumables carries charges Tand P man power Taxes etc complete record will be as p.., Custom Bid for Services - Dry cleaning and ironing Blanket double bed of standard size Work is to be carried out to the satisfaction of SSE works C IND and special condition attached Rate includes all consumables carries charges T and P man powe.., Custom Bid for Services - Washing and ironing Curtain of door &window of any size hanging in ORH Work is to be carried out to the satisfaction of SSE works C IND and special condition attached Rate includes all consumables carries charges T&P man.., Custom Bid for Services - One security guard round the clock to attend occupant and visitors Note Duty more than 12 Hrs can not be done by one person, Custom Bid for Services - Safaiwala for cleaning brooming dusting ORH as per special conditions, Custom Bid for Services - Miscellaneous expenditure on consumable items etc as per schedule attached Similar Category Haulage & Housekeeping Services Haulage & Housekeeping Services Haulage & Housekeeping Services Haulage & Housekeeping Services Haulage & Housekeeping Services Haulage & Housekeeping Services Haulage & Housekeeping Services
Shifting of Ele Lines and Transf SubSta for Pro Cons of ROB on Level Crossing No 1Km 630/12-13 on Khandwa-Akola Meter Gauge Section and B/W Pole No 567/55-56-58 on Itarsi-Bhusawal Road Gauge Railway Line Near Teen Puliya at Khandwa Distt. Khandwa.
Renewal coat of cc road at ward no. 01 1- From station road over bridge to jhiriya ghant 2- From pratham dhaba to shiv vilash garden 3- From galaxy complex to mahaveer nagar phase-2
FIXING OF ROAD STUDS ROAD MARKING RETRO REFRECTIVE BOARD FOR CULVERTS AND MEDIUM BRIDGES SITUATED ON SHARP CURVES IN KM. 20/4, 23/4, 26/4, 28/2, 31/4, 36/6, 37/6 AND 40/2 ON AMBUA DAHOD ROAD NH-56
Cons. of Bridges in Ditt. Ujjain 1- Cons. of Submersible 4-Lane Bridge Across Kshipra River (SR-4 Road) Behind Triveni Hills Colony To Vilage Sikandari 2- Cons. of Submersible 4-Lane Bridge Across Kshipra River Gau Ghat Pala to Sawrakhedi Road
Execution of balance work of Halon Irrigation Project Dam with NoF OF and Radial Gates Stop Log Gates Sub Station Gantry Crane etc. and 2 Nos High Level. Bridges with MoM for 24 months after completion as per details scope of work.
Special Strengthning work of Kuchwahi Tarka Via Saro Pokhra (MDR) Road in Km 1/2 to 6/10, 14/8 to 34/2 Total L 25.40 Km, Under Sub. Dn. Sidhi Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
PREPARATION OF DETAILED PROJECT REPORT FOR BRIDGES (D.P.R.) UNDER PMGSY
PREPARATION OF DETAILED PROJECT REPORT FOR BRIDGES (D.P.R.) UNDER PMGSY
Survey, investigation and preparation of DPR of Bridges/Box culvert
Survey, investigation and preparation of DPR of Bridges/Box culvert
Electrification and power supply arrangement of station building, Service building, electrification of platform/FOB/COP, quarter wiring, cabling, overhead power line at Khurai, Sagar, Damoh stations and other miscellaneous work of General service and LT cable laying for AT at various stations in Bina-katni section in connection with Bina-Katni 3rd line project.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Providing and fixing cantilever and overhead board at fly over; board; Service Provider
Construction of 4 lane ROB and its approaches at km 14/800 (Jerai) on NH 26A in lieu of existing level crossing No. 19 on Katni Bina section Railway chainage 1034/5-6 on Sagar Khurai Bina road of Sagar Dist in the state of Madhya Pradesh on EPC Mode
Balance work of Construction of 2lane ROB and its approaches at Km 36/800 (Jarua) on NH-26A in lieu of existing level crossing no. 11 on Katni-Bina Railway line on Railway ch 1011/6-7 on Sagar to Bina Road in the state of Madhya Pradesh on EPC mode.
Schedule For Supplying Fixing of Street Lights at Level Crossing 236 ROB Pipariya Distt -Hoshangabad
Earthwork in formation including blanking minor bridge and miscellaneous Pway formation works for relocation of existing engine line at ROH shed in connection with Katni Grade Separator Project
B.T. Renewal Work on Amiliya to Semri Road L- 2.00 Km, Uksa Hinaulti Road L 3.70, Supela Hinauti Raod 1.20 Km and Medhauli Kerai Road, Total - 8.10 Km, Under Sub. Dn. Sidhi Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022 6th Call
B.T. Renewal Work on Kubri Marsharha Raod L - 2.77 Km, Basaudha Vill. App. Road L - 2.66 Km, Bahri App Radd L- 1.00 Km Total L - 6.43 Km, Under Sub. Dn. Sidhi Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022 6th Call
On Turnkey Basis Construction of 04 Nos High-level Bridges, 02 Nos Box Culvert and 04 Nos. Hume Pipe Culvert with approaches Under Submergence and 01 Nos. Box and 01 Nos Hume pipe Culvert with Approach Road for Connecting Road upto Kotha Barrage of K
Balancing, Hand and foot Bridge, Step Crowl, Swimming Over, Ramp, Obstacle RCC Ruipe tunnel 30 feet long wind 24 inch dia, Barrel Crowl, Brick Wall, Obstacle MSH Type Channel, RCC pillar Base Structure
Consultants for survey, investigation and preparation of DPR of Bridges/Box culvert
Construction / Upgradation of Bridges works including maintenance for Five Year after construction.