Loading…
Loading…
8,719 results • Best match
Construction of Submersible Bridge in Km 1/300 across Nirguna river on SH 279 Digras Kh to Digras Bk MDR 25 2 ) Submersible Bridge across Nirguana River on Babhulgaon to Sasti Road. Ch 6/400 Taluka Patur Dist Akola
Construction of Major Bridge across Kadwa River on Pimpri Harijan Wasti to SH.27 Road VR.86 Tal. Niphad Dist. Nashik
Construction of Road with C.D.Works from Mandve bk to Chinchkheda ta.wa. To Kumbhari kh. Road (V.R.-176) V.R.184 ,Km. 0/00 to 2/00 with Construction of Bridge at Km.0/650, Tal.Jamner, Dist.Jalgaon
Construction of Bridge and STBT to Khiroda Faizpur Rozoda Chinawal Vivara Kusumba to MDR-1 Road-72 Km.4/900 to 8/00 and 9/500 to 11/00 (Part Faizpur to Rozoda Chinawal) Tal.Raver
Improvements to Vaki Bk. Padavalwadi ranavadi Ambeshivthar Road MDR-95 Km 2/00 to 4/00 and 5/500 to 11/00 and Construction of Bridge At 3/100, 3/800,7/200,7/800 Tal.Mahad Dist.Raigad
Construction of Retaining Wall at Nag River 1. Kumbhartolli, Shastri Nagar, 2. Deshpande Layout Nag Nadi and 3. Construction of Bridge Guard Wall at Nag Nadi Near Hiwari Nagar Power House in Pr. No. 23
CONSTRUCTION OF BRIDGE ON CHINCHOLI - WAGHOLI - INZALA - PIMPALGAON - YERANWADI - ARVI - WADNER - TEMBHA - DONDUDA - SHEKAPUR (BAI.) - SELOO - KOLHI - DHIVARI (PIPARI) - SAWANGI - YERLA TO N.H.-7 IN KM. 60/500 NEAR DHOCHI VILLAGE IN TA. HINGHANGHAT D
Improvement with C.C. Gutter to Chinchala Kuppa Upali Bhogalwadi Aawargaon Road MDR-41 Km. 15/00 to 20/00 and 28/00 to 34/800 and Construction of Bridge at Km. 34/00 Tq. Dharur
Construction of Bridge with Approaches on SH-24 to Jamadi Chambhardi bk. Mundkheda Patonda Waghali Station N-have Borkheda Bahal Khedgao To District Border Road MDR-145 KM.11/800 Near Patonda Village Tal.Chalisgaon Dist.Jalgaon
Beautification of Neera left Bank Canal in Baramati Muncipal Area (Development of Teen Hatti Chouk (1) Canal box bridges 2 Nos. (2) Canal Turf (3) Chouk Roads, at Baramati. Dist.Pune.
1.Minor bridge ch 0/190Parwa- sonkhas-Dorli to Nagezari Taroda -Rasa road Tq. Ghatanji 2.Minor bridge at ch 4/444SH-14 chikhaldara Krushnapur Mohadari joginkawda to MDR-51 Tq. Kelapur 3.Minorbridge at NH-361to Bothbodan ichori ch 11/200 Tq.Yavatmal
Construction of Minor Bridge to Kharde Warshi Hanumantpada Road ODR-28, Km. 0/100, Tal. Deola, Dist. Nashik
Constructing Minor Bridge on Palasvihir to Vanar Roa at Ch 0.300 to 1.500 , 1.700 Tal Dindori Dist Nashik
Construction of Minor Bridge on Kankapur Sheri Mulukwadi Road VR-59 Km. 5/200, Tal. Deola, Dist. Nashik
Construction of Minor Bridge on Brahamangaon Moh Alonde Road M.D.R.40 Km. 5/300, Taluka-Vikramgad, District-Palghar.
Construction of Minor Bridge and Road on SH-22 to Ghagarbuda Road, VR-18, Tal. Surgana, Dist. Nashik
Construction of Minor Bridge across Karanjadi River on Karanjad to Parner Road VR-57, Tal. Satana, Dist. Nashik
Construction of Minor Bridge on SH-22 to Verule Ambapur (SH-21) VR-08, Tal. Kalwan, Dist. Nashik
Construction of New Minor Bridge on Dahiwadi to Chass Kumbhar Nalla Road VR.90 Tal. Sinner Dist. Nashik
Construting of Minor Bridge on Chankapur Ozar Bordaiwat Khirad Ghagbari Road MDR-9 at.Ch.6/00 Tal.Kalwan Dist.Nashik.
Construction of Minor Bridge on SH.30 to Sapgaon Kachurli Kalmuste Takeharsh Km 2/100 Trimbakehswar Dist. Nashik
Construction of Minor Bridge and Improvement of Road From Mohmukhphata to Mohmukh VR- 109, Tal. Kalwan, Dist. Nashik
Construction of Minor Bridge on Bhagur Nanegaon Palase Road MDR38 in Km.7/500 to 8/00 Tal.Dist.Nashik
Preparation of Horticulture Work and Supply of Garden Soil in Front of Poddareshware Ram Mandir Under Ramjhula ROB And Preparation of Rose Bed And Various Beutification Work At Gandhibag Garden Aeroplane Fountain in Pg No 19 (D).
Estimate No 1517/GND/2024 25 Shifting of Existing DTC, HT and LT OH Line and Errecting New DTC,LT Line, UG HT Cabling for Proposed Rob From Bus Stand to Shende Bandhu Petrol Pump at Gondia.
Imp. and Widening to Pohaner Sirsala Moha Road SH-211 Km.10/00 to 12/00 and 19/00 to 37/00 Constg. of Minor Bridge on Km.6/200, 13/200 and Imp.and Widening to Pohaner Sirsala Moha Road SH-211 Km. 8/500 to 10/8 00 and12/800 to 14/00 Tq. Parali
(1)Imp. and Widening to Hingani Amla Kannapur Road MDR 50 Km. 17/00 to 21/00 (km. 17/00 to 20/100) and Constg. of Minor Bridge on Km. 12/200, 12/800, 13/400 and 15/00 (2) Imp. to Hingani Amla Kannapur Road MDR 50 Km. 24/00 to 29/00 Tq. Ambajogai
(1) Imp and Wid. to Beed Mahalasjawala Road SH-55 Km. 325/00 to 330/00 (325/00 to 327/500) (2) Imp and Wid. to Laul Pathrud Road SH-55 Km. 322/500 to 325/00 ( 322/500 to 324/650) and Constg. of Minor Bridge on Km. 325/100 and 327/200 Tq. Parali
Improvements to MDR 10 to Giravi Dudhebavi Wadale Pimprad Rajale to MDR-6 Road MDR-87 Total KM-28.00 Working Length 0/00 to 3/00, Km 3/500 to 7/00, Km 10/300 to 11/00, Km 11/850 to 12/750, Km 13/00 to 13/890, Construction of Minor Bridge at Km 10/200
SN (1) PIPE CLIP 36X25 Drg. No %u2013 LE63109 ITEM NO -2 open dia -38 mm , close dia -36 mm and drg. No %u2013bogie /clip -01 , material specification - IS 6911-92 Grade -304 SI ,Elastomer as per rub
Custom Bid for Services - Cleaning and Cutting of Road side drains from MKD I Coal stock to New RUB along Coal Transportation Road at MKD III OC Mine of Umrer Area Similar Category Facility Management Service - Outcome Based
1)Construction 5 Year Maintenance of 6 m x 4 Span Submersible Bridge at Ch.2/690 MRL08-Dhotra 2)Construction 5 Year Maintenance of 8 m x 3 Span Submersible Bridge at Ch.4/170 MRL21-SH 273(Hisai) - Ajgaon
1-Construction of Submersible Bridge at Ch 5.370 Dhanla To Ajangaon To Kumbhari To Mouda NH-53 Road Tah. Mouda 2-Construction of Submersible Bridge at Ch 0.320 Dhanla To Ajangaon To Kumbhari To Mouda NH-53 Road Tah. Mouda
Improvements to SH-249 to Waigaon Kumtha Dhamangaon road, MDR-27, Km.0/00 to 3/500 and reconstruction of bridges at Km.0/800 and 1/400, Tq.Ahmedpur, District Latur.
14/2/3.FDR to Rautwadi Harne Valaha road MDR 50 Km8/800 and 9/500 Repairs Bridges (Construction of Retaining wall and Concrete and BT Road Near Valahe Village, Tal.Purandar,Dist.Pune.
1) Provision of fittings for H-Beam sleepers in Solapur Division. 2)Replacement of sleepers on bridges using bridge approach and bridge central sleepers under ADEN/PVR jurisdiction in KWV-MRJ section.
Making dust suppression arrangement by spraying water over road surface at old surface at old new railway siding, coal transportation road, around all CHPs Including weigh bridges approaches at Ghugus Sub-Area.
Making dust suppression arrangement by spraying water over road surface at old surface at old, new railway siding, coal transportation road, around all CHPs Including weigh bridges approaches at Ghugus Sub Area.
Assistance in cleaning and upkeeping of weigh bridges, canteen, SAM office, Other Offices, and Operation of sprinklers at Amalgamated Yekona-I and II OC Mines under Yekona Sub Area of Majri Area.
Flood Damage Repairs to Bridges on Kalyan Murbad Malshej ghat Nirmal Road NH-61 in Km. 36/000 to 58/000 (Murbadi Bridge, Sajgaon Bridge, Doiphodi Bridge, Kanakveera Bridge) for 2022-23
Making dust suppression arrangement by deploying water tanker on coal transportation road from Wardha river bridge to CHPs Naigaon OC and Neeljay South and approaches to weigh bridges under Neeljay Sub Area.
Providing Technical consultancy services on panel basis in vvcmc area for the year 2020-21 2021-22 and 2022-23 work includes lakes garden development bridges cremetorium nalle samaj mandir buildings etc.
Construction of Foot Over Bridges, Service Roads, Bus Bays and Bus Shelters between Km 205.400 to Km 241.300 Parshuram Ghat Arawali Section of NH.66 in the State of Maharashtra on EPC
2702 MI Non Plan M and R works of reamoving grass, bushes on dam slope and painting the Hoist, Hoist mechanism, Approach bridges of M I Schemes under Irrigation Sub Division Sawantwadi
Improvement Widening and Reconstruction of CD Works and Bridges to Poladpur Mahabaleshwar Wai Wathar Bhadale Road SH139 km.95/500 to 100/00 (Section - Circlewadi to Pimpode Bk) Tal- Koregaon Dist- Satara
Supply and application of Loctite 2048LV or equivalent Thread locking Adhesive as an anti theft anti sabotage measure for HSFG bolts in railway bridges ,channel sleepers and other track components with bolts.
Construction and five year routine maintenance of Submersible bridge Ch 0400 MSH 16 to Khadakwadi Tq. Patoda
Construction and five year routine maintenance of Submersible bridge Ch 5000 SH70 to Takalsing Hingni Tq. Ashti
construction of Submersible Bridge at Ch.8.970 on NH-753Asura Nangangaon to Padali Shinde Road Tq. D.Raja