Loading…
Loading…
2,409 results • Best match
Construction of High Level Bridge in lieu of existing causeway at Km 47 6 of Avinashi Tiruppur Palladam Pollachi Cochin via Meenkarai road SH 19
Reconstruction of High level Bridge at Km 5/4 of Emapalli - Kailasampalayam Road to Pappampalayam Road (via) Appanaickampalayam in lieu of existing bed level causeway
Construction of Bridge in Bridge in Puduthurai To Atrangarai Road Via Vellapallam Link Road at ch 2/120 in Sirkali Block at Mayiladuthurai District (TN09-450) Under PMGSY2022-2023
Widening from Single Lane to Intermediate Lane Widening from Two Lane to End to End Strengthening Improvements to Riding Quality Construction of Minor Bridge Construction of Retaining Wall Ction of Breast Wall Construction of Dran including CD
CONSTRUCTION OF PERMANENT RCC BRIDGE OVER RIVER ADAYAR AT OTA CHENNAI (PH II) (SPL WORK) (EXTERNAL ELECTRIC AND WATER SUPPLY) AND SPL REPAIR REPLACEMENT AGAINST QTY 06 X SPLIT AIR CONDITIONER DECLARED BER SQAE (V) CHENNAI UNDER GE STM
Construction of ROB at Km.3_0 of Goodanagaram _ Anakanallur road in lieu of existing LC No.67 at Railway Km.160_2_4 in between Melalathur and Valathur Railway Stations
Construction of bridge at mallapadimarmanapalli road H/o mallapadi in Bargur Block of Krishnagiri District under NABARD RIDF XXIX(2023-24) Package NO TN 04 KRI 132
Construction of Bridge at 1.700 in Sengattur to Veerabogam Road in Sengattur Village Panchayat at Lathur Panchayat Union under NABARD RIDF XXVIII 2022.23 having PKG No.01
Construction of Bridge in Uthirangudi to Authaur Road Across Manniyar River in Authur panchayat Mayiladuthurai Block Mayiladuthurai District under NABARD - RIDF XXIX (2023-24) Tranche Package 09
Construction of Bridge across North Side River at Nakkaneri Panchayat in Rajapalayam Block at Virudhunagar District under State Special Assistance Phase-I for the year 2025-26
Construction of bridge across Miruganda River at Kanthapalayam to Koothalur road in Kanthapalayam Panchayat Package No.TVM/2022-23/157 Kalasapakkam Block of Tiruvannamalai District under NABARD XXVIII
Salem District - Attur Block - Construction of Bridge at Ramanathapuram to Malaiadivaram Road across Pudupalayam Odai in Appamasamudiram Panchayat in NABARD RIDF-XXVIII -2022-23 Package No.02
Thanjavur District - Package No.07 - Construction of Bridge Poonaikuthi river from Palayanagaram to Jeevankurichi road in Palayanagaram Panchayat at Peravurani Block -NABARD RIDF XXIX - 2023-2024 Tranche.
Thanjavur District - Package No.08 - Construction of Bridge across Maruthangudi River at Manakkadu Mangalanadu Road in Manakkadu Panchayat at Sethubavachatram Block -NABARD RIDF XXIX - 2023-2024 Tranche.
Construction of Bridge Across Kaveripakkam Tank Surplus Channel in Panapakkam Uliyanallore Road at KM 0/800 in Nemili Block at Ranipet District- NABARD RIDF-XXIX 2023-24
Construction of Bridge across Devi Riveralong Solaiseri to Senthattiyapuram Road in Senthattiyapuram Village and panchayat in Sankarankovil Block in tenkasi Dist NABARD RIDF XXIX Package No.3
Construction of Bridge Across Gundar River at Km 0/000 of Elumalai to Athangaraipatti Road (R36) in Sedapatti Block at Madurai District NABARD RIDF XXIX 2023-24
Construction of Bridge at Km 0/100 of Senthamangalam to Senthamangalam Burial Ground Road (R147) at in Alanganallur Block at Madurai District NABARD RIDF XXIX 2023-24
Construction of bridge across manna voikkal drainage channel at Sarvarajanpettai to Thirunaraiyur road at Sarvarajanpettai panchayat Kumaratchi block Cuddalore district under NABARD - RIDF XXVIII (2022-23) Tranche.
Construction of Bridge across Karuppanadhi River along Thirikoodapuram to Periyanayagi Kovil Road in Thirikoodapuram Panchayat in Kadayanallur Block in tenkasi District NABARD RIDF XXIX Package No.1
Thoothukudi District -TN/Tut-03/2025-26-SSA 2025-26-Ottapidaram Block - Construction of Bridge across Kallaru River along Veppalodai Vadakku Kalmedu Road at Therku Kalmedu Panchayat
Construction of Bridge across Manapakkam Eri Supply Channel at CP Road to Manapakkam Road in Chunambedu Panchayat in Chithamur Block of Chengalpattu District Having PKG No.07
Construction of Bridge Across Adasolai Channel along Selatha to Avarai Road of Kadanadu Panchayat in Udhagai Block Of The Nilgiris District under (2022-23) NABARD RIDF-XXVII
Construction of Bridge at Thiruvali to Kaaraimedu across Manniyar river in Thiruvali Panchayat in Sirkali Block at Mayiladuthurai District under STATE SPECIAL ASSISTANCE PHASE-I (2025-26)
Construction of Bridge Across Nandhimangalam Tank Surplus Channel in SK road to Nandhimanagalam at KM 0/100 of Sholinghur Block, Ranipet District NABARD RIDF-XXIX 2023-24
Construction of Bridge across Pattakulam Supply Channel along Veppankulam Link Road in T. Sankarankovil Panchayat in Sankarankovil Block in tenkasi Dist NABARD RIDF XXIX Package No.4
Construction of Bridge at Kadalangudi to seepuliyur road across rajan vaikkal in Mudikandanallur Panchayat Mayiladuthurai Block Mayiladuthurai District under NABARD - RIDF XXIX (2023-24) Tranche Package 08
Construction of Bridge across Arjuna River along V.Muthulingapuram to Soorampatti Road in V.Muthulingapuram Panchayat in Virudhunagar Block of Virudhunagar District under NABARD RIDF-XXIX-2023-24-Tranche
Construction of Bridge at Maruthangudi to Alancheri across Kazhumalai River in Maruthangudi panchayat in Sirkali Block Mayiladuthurai District under NABARD - RIDF XXIX (2023-24) Tranche Package 07
Construction of Bridge across Uppodai supply channel along Varaganoor to Chellapatti road in Varaganoor Panchayat in Kuruvikulam Block of Tenkasi District under NABARD - RIDF-XXVIII (2022-23).
Construction of Bridge across Manjalaru river along Kunnuvarankottai Koottathu Ayyampalayam Road in Kunnuvarayankottai panchayat in Vathalagundu of Dindigul District under NABARD XXIX 2023-24 TN 05- 04
Construction of Bridge at Semamangalam Road across Ayavaiyanar River in Puthupettai at Semangalam Panchayat Sembanarkoil Block Mayiladuthurai District under NABARD - RIDF XXIX (2023-24) Tranche Package 10
Salem Division: Improvements to LUS/RUB Drainage facilities, Construction of collection well & pup room in LUS in lieu of LC No:5,7,10,19&25 in Karur-Dindigul Section- Electrical Arrangements.
SRPHC092045-CHLORHEXIDINE GLUCONATE 2.5 % + ETHANOL 70 % HANDRUB 500 ML BOT UNIT:BOT Firms' offer: Same as above, Make/Brand: Nanzilon Hand Rub-500ml NANZ MED SCIENCE PHARMA PRIVATE LIMITED-SIRMOUR
Supply, installation, testing and commissioning of unit spares for Johnson Escalator E-5881 at PF 1 FOB of TJ Railway station. List of spares is enclosed in Annexure- A. Make/Brand:- Johnson
Construction of High Level Bridge in lieu of existing old narrow bridge across Lower Bhavani Canal at Km 3 2 of Ukkaram Kondayampalayam road via Vandipalayam.
Balance works of Reconstruction of High Level Bridge at km 0/4 of Ayyampettai Ganapathyagraharam road (O 658) across of river Kudamuruti (Branch of River Cauvery)
Special Repairs to the Government Roads, Repairs to High level Bridge, Retaining wall and Parapet wall in Vaniyambadi (H), C and M Sub-Division-TVM-95
Construction of High Level Bridge in lieu of existing old narrow bridge across lower Bhavani canal at Km 23 6 of Cheyur to Erode Sathy road
Providing LED Street Light Pole Arrangements to the High Level Bridge at KM 25/6 of Arcot-Villupuram Road across Kamandalanaganadhi at Arni in Tiruvannamalai District
Construction of High Level Bridge in lieu of existing old narrow bridge across Lower Bhavani Canal at Km 1 2 of E Chettipalayam Moonampalli Chinnakosanam road
Construction of ROB in lieu of existing LC No.64 at Km.1_6 of Kinar _ Keezhavalam Road at Railway Km.81/2_4 in between Padalam and Karunguzhi Railway stations
Maintenance of Roads, Drains, Bridges, Culverts, Tollgate outside Custom Bond area for a period of Two Years at V.O.Chidambaranar Port Authority (Unit Rate Basis)
Hiring 1 No of Tata Indica or equivalent vehicle(A/c) for Executive Engineer(Bridges) for inspection purpose for a period of 12 months.
El.D.C.NO.South /10304/2019 - Provision of ReWiring in main building weigh bridges and Security Room at Perungudi Dumping Ground in Div 186 Zone 14 area
Construction of Birdge across Thondi River from Rettanai to Mandagapatu road in Mailam Block under NABARD RIDF XXVII Bridges 2021-22 in Viluppuram District
MS-VM Section- Repair's & Brightening of Station, Service Buildings & Staff quarters and Repair's & brightening of Minor, Major & Important bridges in SSE/W/TBM Section.
Facility Management of Electrical and Mechanical Equipments of Elevators, Escalators, Travellators, Passenger Boarding Bridges, Conveyor Belt and Standalone Weighing Scales at Chennai International Airport.
Hiring 1 No of Tata Indica or equivalent vehicle(A/c) for Executive Engineer(Bridges) for inspection purpose for a period of 12 months
Replacement of Existing Canopy Bellows with frame and without frame of Passengers Boarding Bridges Bukaka Make in Terminal 1 and 4 at Chennai Airport.