Loading…
Loading…
3,310 results • Best match
installation of Weigh Bridges at Out Center Job 1st, installation of Weigh Bridges at Out Center Job 2nd, installation of Weigh Bridges at Out Center Job 3rd
Rehabilitation work of Minor bridge on Markaz River at km 183 of Delhi Yamunotri Marg (SH-57)
Construction of 3x12m span RCC bridge over Naiya Nala at Haidergarh-Ramsanehighat (MDR-003) in km-10
CONSTRUCTION WORK OF 3 X 15 METER RCC BRIDGE FROM GAHWA TO SADHARI IN SANT KABIR NAGAR
Repair and Mentinance of 3x18 M Span RCC Bridge at Meyodha Bhadar Kusumkhor Road ODR KM-8
Repair and Mentinance of 3x18 M Span RCC Bridge at Meyodha Bhadar Kusumkhor Road ODR KM-6
Rehabitation Work Disst. Ayodhya NH-28 ke Parityakt Bhag ke ant sma Saryu Nadi on RCC Bridge
Reconstruction of RCC Bridge at Chhata Shergarh Naujheel Bajna Gomat Road in km 27 in District Mathura
AS PER NIT
AS PER NIT
25kV OHE Modification work due to raising of Platform at Kanchausi (KNS) & Pata (PTX) stations and replacement of old FOB by new FOB at Achhalda(ULD) station of Prayagraj Division.
Earth work, Blanketing in formation, Extension of Minor bridge, Construction of Station Building and Platforms alongwith other associated ancillary works in connection with work of ''Conversion of Barsethi Halt Station in to Crossing Station between Mariauh-Janghai section." of Lucknow Division on Northern Railway under Dy CE-C-V-LKO.
Earth work, Blanketing in formation, Extension of Minor bridge, Construction of Station Building and Platforms alongwith other associated ancillary works in connection with work of ''Conversion of Barsethi Halt Station in to Crossing Station between Mariauh-Janghai section." of Lucknow Division on Northern Railway under Dy CE-C-V-LKO.
Construction of Bridge over Agra Canal at Km. 22.515
Supply of 10 mm, 20 mm, Stone Grit ( Kabrai) and C-sand (F.M. 2.5 River Ken Banda) at Banda) at ROB I5 C Shujatpur in Distt. Kausliambi IS 383-2016
R.E. wall works in ROB 72 A in distt. Chandauli
CC Pavement Work at Service Road of Mill Road ROB
SUPPLY OF COARSE SAND AT ROB-BALRAMPUR IN DISTT. BALRAMPUR
SUPPLY OF 11.2 MM STONE GRIT AT ROB-40A BAHRIACH
Construction Of R.E Wall in ROB 148 Bholepur Dist Farrukhabad
Renewal Work with Micro Surfacing at Lohiyapath New ROB (RHS)
SUPPLY OF COARSE SAND AT ROB-262SPL IN DISTT. GONDA
Service lane route of Charfatak ROB in F.Y. 25-26
RE wall works in ROB 83 BT in distt. Chandauli
Beam Launching Work at 4 Lane ROB Bangla Bazar Lucknow
Repair work of Vivekananda ROB on Lucknow-Kursi-Mahmoodabad road
Bridge repair work at Km 31 of Arangi to Chaurihwan road
Special Repair of Bridge Putan Bhiknnepur Musepur road to Village Musepur Near Mala River
Annual Repair of Bridge in the Section of SSE/W/RAC under ADEN/SPN
Signage work of approach protection work of the Major bridge on Sarai River at Km. 29 of Maholi Hargawn Laharpur Bhadfar Road (SH-140)
Approch work and Repair work of the Major bridge on Kathina River at Km. 9 on the Mahsuniya Kanchanpur Patabojh Basi Fareedpur Road (ODR)
Construction of 3 RCC bridges in place of the damaged bridges located on the Doharighat Main Canal in Ballia District.
Rehabilitation of bridge no. 5 ( Tonse River) by Jacketing, protection work in abutment both end (DDU, PRYJ) at KM: 792/10-24, UP & DN main line under Sr.DEN/I/PRYJ
Alcohol Based Hand Rub/Hand Sanitizer, iso propyl alcohol, Pulse Oximeters, Infrared Medical Thermometer For Measuring Body Temperature
(EPC) MODE CONSTRUCTION OF BRIDGE OVER RIVER CONSTRUCTION OF BRIDGE OVER RIVER KUDAAR AT BHADRA-DHAYPURA ROAD APPROACH ROAD PROTECHTION WORK IN DISTT JHANSI
Construction of 2x6 meter span RCC Minor Bridge and Approach Road at Katmata Harraipur Road Under RIDF-25 in Financial Year 2019-20
Electrification Line Shifting Work ROB 11C Rohta-Runkata Road in Dist Agra at Canal Side.
Provision of Foot Bridge and drain covers in National Institute of Cancer Prevention and research Campus, Sector-39, Noida (UP) during 2024-25 Subwork/Packages: civil work
LAYING OF SEWER LINE NEAR PANDEYPUR ROB
Repair work of major bridge over Gangro river in km 2 of Shahbuddinpur road from Behat Shakumbari road in Saharanpur district.
Constr of Remaining Balance work of Foundation Sub Structure and Super Structure of 2 lane high level bridge across River Ghaghra Kamhariya Ghat on Sikariganj Belghat Lohariya Shankerpur Baghad Road in Distt Gorakhpur UP On PRW percentage rate
Construction of 4x6m span Minor Bridge and approach Road on Pratapnagar Madhoganj road km6 to Vajidpur Goverdhanpur road in km 4
Repair of approach road, parapet in Km.-76 Minor Bridge 3x9.00 m span of Sitapur-Gola-Aliganj-Bijuwa road (SH-135).
Construction work of Box Culvert 3x3x3 minor bridge on Chandi via Dauraitha road from Fatehpur Sikri Kagarol road in Agra district
New Construction of RCC Minor Bridge Approach Road and Protection work between Bandariya to Barmaula Arjunpur Link Road on Sivai Nala
Renewal on between Vill. Lauwa Jamuniya Kheda road 5 x 6 Mt span RCC Minor Bridge Approach road Additional Approach road
Rehabilitation of minor bridge no 4/2 situated on Dariyabad branch Sharda Sahayak Canal in km 4 of Dariyabad Barinbag road
Construction work of Minor bridge of 5x4x4 meter span on Orai Kotra road km 19 (Hamirpur Branch Canal) in Jalaun district
Construction work of minor bridge and approach road at km 0-2 of Datouli Ranghad to Mansapur road in Saharanpur district.
Construction of a 3 x 18 m span minor bridge and approach road on Mattan drain between Muraini-Khanipur-5676-1