Loading…
Loading…
2,651 results • Best match
RATE CONTRACT FOR ON-LINE SEALING OF STEAM, HYDROCARBON, ACID and OTHER LEAKS AT OHCU, FOB, LOB, TPS,OFFSITE AREAS,DHDS BLOCK, DYIP and BS-VI AREAS OF HALDIA REFINERY
OVERHAULING, REPAIRING, CALIBRATION AND TESTING OF M/S. WOODWARD MAKE PG-PL GOVERNORS (2 NOS.) OF RECYCLE GAS COMPRESSORS 22-K-01 A/B AT FOB AREA OF HALDIA REFINERY.
AMC of Minimax make Clean Agent Based Fire Extinguishing System (CAFES) at DHDT Main Control Room old FOB Control Room Building and LOB Control Room Building in IOCL Haldia Refinery.
Consultancy services for proposed Underpass (By Jack-Push method) across KNI Avenue (VIP Road) at 8th K.M and Foot-Over Bridge at Jessore Road near Airport Gate No.1 for pedestrian across
Construntion of wooden foot Bridge at Ch 558 over Nowi Khal Dismantling of old dilapiated Tubular Truss Foot Bridge at Ch 560, over Nowi Khal under Urban Drainge Division during the year 2021-202.
Rest portion of Construction of Girder Bridge at Balaspur on plot no-1382,Mouza-Panchgram in Panchgram G.P under Nabagram Block.
Zonal work for General repairs and maintenance of steel bridge works minor and major (Superstructure) in suburban section all over Sealdah Division. [Zone No.40 for the Period Ending 30.06.2027]
Improvement of drain with slab from Babu shop towards Rob house at NatunParaPaschimunder Kapasdanga Gram Panchayat Sector - 15th FC AAP No 63/ 2022-2023 ( ESWARAJ ID 57379975)
Construction of Foot Bridge over pond at Oceana Tourist Complex-I, Digha, Purba Medinipur
Construction fo Foot Bridge over River Fulleswari at Sahid Colony at ward no 35
REPAIR OF FOOT BRIDGE ON 3 NO CANEL NEAR NABIN TUNG HOUSE AT CHAUPANYA
Repair and rehabilitation of existing distressed Bridges of NH 60 (New NH 14) under Package-3 -(Bakreswar Bridge at km 322.550, Bramhoni Bridge at km 398.450 and Gambhira Bridge at km 418.918) in the district of Birbhum, West Bengal in the year 24 25
Proposed Construction of RCC Bridge over River Srimati on the U/S Side and D/S Side at 27.30 Km on Raiganj Kaliyaganj Buniadpur Road under Uttar Dinajpur Division, PWD in the district of Uttar Dinajpur (3rd Call).
Khasbalanda Three PointRaikhan RCC Bridge Under Haroa BLOCK
Construction of Bridge over Sruti Khal at Tutranga mouza Narma GP under Narayangarh Panchayat Samiti in the Dist of Paschim Medinipur (15th CFC 2022-23-untide)
Painting work on Structural Steel Girder Above water body and installation of Rain Water Down Pipe at Sonarpur R.O.B.
Asansol Division: Telecom work i/c/w the work (1) Asansol Division: Regirdering & strengthening of embankment & other ancill. work of Br.No.9 & 9A on UP & DN DSP line between KAN-ASN sec. under AEN/BRL/ASN (2) Replacement & renovation of PSC girder for Br.No-20, protection & other ancillary works at UDL under DEN/4/ASN. (3) Replacement of BGML girder, jacketing & protection work along with other ancil. works of br. no.3 in between SCN1-TOP in sec. AEN/BRL/ASN
S&T portion of work for (i) Closure of LC Gate No. KY-21 due to connectivity of road with National Highway at NMP R Yard. (ii) Construction of 01 No. RUB (Road Under Bridge) in lieu of LC No. 86 in Balichak- Jhargram Section (iii) improvement of road approach with cover shed, sump well, pump house & drain at LC No.87 of KGP- TATA Section under ADEN/JGM. (iv) Improvement of road approach with cover shed, sump well, pump house & drain at LC No.95 of KGP-TATA Section under ADEN/JGM.
PROPOSED RCC BRIDGE AT CH. 1350 OVER MAYURAKSHI BRANCH CANAL IN MOUZA- UPLAI, P.S- KHARGRAM, DIST.- MURSHIDABAD (2nd call in connection with the 1st call bearing e-NIT No. WBIW/EE/MNCD/NIT-3(e)/2025-26, Sl.No.3)
Construction of concrete road by converting bituminous road with renovation of drain along the of ROB to Junc. Of Jatindas Nagar Road and M.B.Road under Ward no.34
Construction of Cement Concrete Road from abdul Rob house towards Jama Maszid at Milangarh Sansad within Chathat Bansgaon GP under 15th CFC fund for the year 2022 23
Construction of 3 number Single Lane RCC Bridge over Kalimondop Khal at MouzaUchitpur Uddhabpur Bahabalpur in Block PS Sabang and Dist-Paschim Medinipur in cw Construction of 133 numbers of RCC bridges over Drainage Channels.
Minor repairing, Uprooting of trees, Sweeping and Cleaning and maintenance of carriageway of 10 nos Bridges, Flyover and ROB (i.e. Bijan Setu, .........KMDA for a period of 01 Year.
Construction of Abatment wall and wing wall near Khosaghat for foot bridge at Hossainpur village
Construction of Foot Bridge from Pucca road to Alaruddin house at Fataipur under Madhupur GP
2 (Two) nos. Bridges and 4 (Four) Nos. Culverts at Kuli Moregram Road, Bridge over Khal at 12.40 Km of Ramnagar Bazarsaw Chourigacha Khagraghat Road and Bridge over Khal at 7.40 Km of Sherpur Bishnupur Road, Rehabilitation work under Murshidaba
Preparation of DPR for construction of Bridge Halda alongwith Topographical survey, Hydrographical Survey and Geotechnical Investigation within Debra block under jurisdiction of WBSRDA Paschim Medinipur Division I
Repair of damaged insulation and miscellaneous ENCON related jobs as per walk through inspection, CUI etc. at LOB, OHCU, Flare, TPS, Offsite areas, FOB, BS-VI and other units of Haldia Refinery.
Custom Bid for Services - Replacement Painting of worn out damaged Instrument cable ducts laying of cable trays for existing cables in FOB and TPS block of Haldia refinery Similar Category Support Services
CONSTRUCTION OF ENTRY AND EXIT GATE NEAR ENTRANCE OF NEW ADMINISTRATION BUILDING AND NEAR BRIDGES OVER GBC ALONGWITH FACADE LIGHTING OF NEW ADMINISTRATION BUILDING.
Condition Survey as well as Health Check-up of different bridges along NH-60 New NH-14 in the district of Bankura, West Bengal
Annual comprehensive Maintenance Contract and Stamping for 3 Nos of Pitless Static Weigh Bridges Capacity 100 MT each with Weigh Cabins at DPL, Durgapur
Biennial Service Contract for Supply of Manpower for Round the Clock Operation of existing three (3) Nos. In-Motion Weigh Bridges (IMWB) of BTPS
Drawing and design work for Construction of RCC Bridge over Nunia River at Bidaigarh Subhaspara on the road of Sitarampur to NH2 at Ward No. 20., Under A.M.C. Three copy drawing and design both vetted by Jadavpur Univercity
Construction of 3 nos RCC bridge at Ch 92.50
Construction of 01 no RCC bridge at Ch 81
Construction of 01 nos RCC bridge at Ch 1338
Construction of 06 nos RCC bridge at Ch 1455
Construction of 2 nos RCC bridge at Ch 520.00
Construction of 03 no RCC bridge at Ch 75
Construction of 1 no RCC bridge at Ch 1066
Construction of 03 nos RCC Bridge at Ch 674
Emergent Repair to the wooden bridges 3 nos at Raghunathpur over Kharobon Khal in Bhawanipur Bidhichandrapur G P Gazipur Dighirpar over Suti Khal in Gazipur G P Block Amta II and Narit Foot bridge over Lower Rampur Channel in Jhamtia G P
Laying of Cement Concrete block at damage locations along service road of Bhadul More ROB(Raniganj side) of NH-60 from 228.028 to 228.385 km along LHS under N H Division No-III in the district of Bankura, West Bengal during the year 2021-22
Special repair of 08(eight) Nos. of Steel Foot Bridge and 01(one) No. of RCC Foot Bridge over New Cut Canal and Kestopur Khal within South Dum Dum Municipality and Bidhannagar Municipal Corporation, North 24 Parganas.
Extra Ordinary repair of IBB Road Link road Length 34.5 Km and epoxy painting of steel bridges in various stretches of malda district of West Bengal. Subwork/Packages: EOR of IBB Road Link road Length 34.5 Km and epoxy painting of steel bridges in various stretches of Malda district of West bengal.
Construction of Pucca Drain from the house of Rob Master to the house of Hossain Biswas at Mathura JL No 67 Mouza Mathura under Bodai GP of Amdanga Block.
ROB at Ch. 3.00 km of Buxa Forest Road in Alipurduar Town-- Replacement of Bearings under Alipurduar Division, P.W.D in the district of Alipurduar during the year 2022-23.
CONSTRUCTION OF 2 LANE ROB WITH APPROACHES IN LIEU OF LC NO. 22 AT KM 17/1-2 BETWEEN BARHAN-ETAH SECTION ON PRAYAGRAJ DIVISION OF NORTH CENTRAL RAILWAY