Loading…
Loading…
2,652 results • Best match
Gairkata_Ramsai road__Ch. from 1.90 km____Const of RCC bridge over Machua River near Madhubani Park under Jalpaiguri Divn PWD in the dist of Jalpaiguri
Repairing RCC Bridge at 11th and 22nd km of Kanki Goagaon Road in the district of Uttar Dinajpur under Uttar Dinajpur Highway Division
Construction of RCC bridge replacing existing wooden bridge over river Kunti at Purusattam Bati in Block Polba dadpur P S Polba District Hooghly
Remaining work of Renovation and reconstruction of existing dilapidated RCC bridge over MMC at Fatepur under Block Uluberia-I, P.S Uluberia, District Howrah.
Minor repair to the RCC Bridge near Sahapur Primary school Over singda khal, GP-Sahapur, Block-Patashpur-I, Dist-Purba Medinipur.Scheme ID - APAS
Construction of Foot Bridge Near the H/O Kiran Roy. (L-10mtr, B-6ft) UNDER SALBARI-II GP WITHIN BANARHAT DEVELOPMENT BLOCK UNDER APAS FUND. (SCHEME ID-APAS/01/015/57/0006)
Construction Of Foot Bridge Extension At 1 No Colony From Tapan Sarkar House To Niva Das House In Ward No 7 Under North Dumdum Municipality SCHEME ID- APAS/01/110/135/0001
Construction of R.C.C. Foot Bridge over Kantakhali Main Khal at 90.00 M at Village - Gobindapur Kalicharanpur, Mouza - Gangarampur, Block - Bishnupur-II, P. S. - Bishnupur, Dist-South 24 Parganas under Suburban Drainage Division
M/R to protection work along left bank of branch Nakole khal near Bamboo foot bridge for a length of 75.0 m at Baikunthapur in GP-Nakole, Block-Shyampur-II, District-Howrah.
Construction of Bridge near Kalipada pradhan house under Southkhanda GP Scheme Code - 88965861
Restoration of Road side flank of Baruipur ROB Approach (Kolkata side) by construction toe wall and allied work including repairing and painting of ROB railing under Baruipur Sub-Division 24 Pgs (South)- RnB works-2019-2020.
Execution of P Way work and construction of Bridge in connection with the work of dismantling of UP and DN main line cross over at both ends to eliminate DN main cum UP loop facility by provision of UP loop line and island passenger Platform at Garbeta (GBA) station.
Repair and rehabilation of Barasat ROB under Barasat Division,PWD during the year 2020-2021
Repair and rehabilation of Barrackpore ROB under Barrackpore Division,PWD during the year 2020-2021
Repair and rehabilation of Madhymgram ROB under Barrackpore Division,PWD during the year 2020-2021
Erection of Height Bar on both sides of Sodepore ROB During the year 2024-25.
Repair and rehabilation of Sodepur ROB under Barrackpore Division,PWD during the year 2020-2021
Restoration of damages Barrackpur Bound Road in connection with demolition of Dunlop Road Over Bridge by RVNL Northern Flank on B.T. Road Under Kolkata North Division PWD in the district of North 24 Parganasduring the year 2019_20.
Open e-tender for Civil and Bridge work in connection with Yard remodeling of Bhagalpur station to extend existing running lines to accommodate full length Goods train to enhance terminal capacity under Assistant Engineer/ Bhagalpur in the jurisdiction of Senior Divisional Engineer-II/ Eastern Railway, Malda.
ENGAGEMENT OF AUTHORITYS ENGINEER CUM SUPERVISION ENGINEER FOR SUPERVISION OF FABRICATION and ERECTION OF STEEL STRUCTURE INCLUDING PROOF CHECKING OF FABRICATION DRAWING FOR RETROFITTING OF BAGHAJATIN ROB_OLD AND NEW.
NOTICE INVITING QUOTATION FOR IDENTIFICATION OF BRIDGES UNDER RURAL CONNECTIVITY SCHEME
Installation of Solar Light and Sign Board at R.C.C Foot Bridges
Bridge Zonal Works for maintaining and repairing of bridges including new addition & alteration in the jurisdiction of SSE/BR/SINI under ADEN-Br-Line/CKP in CKP Division period ending up to 30.09.2027 (For Period of Two Years i.e. from 01.10.2025 to 30.09.2027).(2nd Call).
Bridge Zonal Works for maintaining and repairing of bridges including new addition & alteration in the jurisdiction of SSE/BR/SINI under ADEN-Br-Line/CKP in CKP Division period ending up to 30.09.2027 (For Period of Two Years i.e. from 01.10.2025 to 30.09.2027).(4th Call).
Bridge Zonal Works for maintaining and repairing of bridges including new addition & alteration in the jurisdiction of SSE/BR/SINI under ADEN-Br-Line/CKP in CKP Division period ending up to 30.09.2027 (For Period of Two Years i.e. from 01.10.2025 to 30.09.2027).(2nd Call).
Maintenance , Repair to krishnamati R.C.C bridge (Ch 15.034KM) , Jirangachi RCC bridge (ch. 14.013 km) over Lower Bagjola Khal, PS - Kashipur, Dist- South 24 parganas
CONSTRUCTION OF WING WALL AND OTHER ALLIED WORKS FOR THE RCC BRIDGE OVER KANSAI RIVER IN BETWEEN KONAPARA AND KESHARGARH VILLAGE IN PURULIA DISTRICT.
Construction of Single Lane RCC bridge replacing the old dilapidated bridge over Gaighata Khal at village Bankura, Block Bagnan-I , P.S Bagnan , District Howrah.
Geotechnical investigation for construction of RCC bridge over Pairatungi Khal near house of Sarafraj Nawaj Mouza Bhubankalua in Block Tamluk under East Midnapore Division.
Construction of RCC Bridge in replace of Nonai Bridge- Gairkata Ramsai Road at Chainage 6.25 Km. in the district of Jalpaiguri under Jalpaiguri Division
Maintenance and Repair of Tepul Mirzapur RCC bridge over Baldeghata Khal at ch 01 km within Block and PS Swarupnagar Dist North 24 Parganas
Bullah piling work below both sides foundation in connection with construction of Steel Foot Bridge over Upper Bagjola Khal at Arun Mondal Pally Ward No 18 of Baranagar Municipality District North 24 Parganas
CONSTRUCTION OF BRIDGE FROM BSTHAN TO MORA MAHANADA NODI AT KHURIAL UNDER ALIHANDA GP
Construction of Bridge in road Tupchibar to Kabarstan under Patashpur GP Scheme Code - 88965574
Construction of bridge culvert at Bandarkonda harinmuri khal at pandua Fund- 5th SFC TIED
Erection_job_1, Erection_job_2, Erection_job_3, Erection_job_4, Erection_job_5, Erection_job_6, Erection_job_7
Erection Job 1, Erection Job 2, Erection Job 3, Erection Job 4, Erection Job 5
Please check NIT
Weighbridge1, Weighbridge2, Weighbridge3, Weighbridge4, Weighbridge5, Weighbridge6, Weighbridge7, Weighbridge8, Weighbridge9, Weighbridge10
Signalling work in connection with Re-girdering of (1) Br. No. 27 on up Main, Dn Main, Line No.7 and common Line in between station BNXR and DDJ in SDAH-DDJ Section, (2) Br No 7 on UP Main and DN Main line in between station SDAH and BNXR in SDAH-DDJ ... ( RUB ) ... X-23( RUB ) ... ( RUB ) ...
Repair and Rehabilitation works of Minor Bridge at 41.61 Km. and 42.20 Km. of Contai-Belda Road SH-5 under Midnapur Division, P.W.D., in the district of Paschim Medinipur
Rajagram Bridge approach Road, Rajagram Bridge at 1.20 km and a minor Bridge at 1.50 km, Rehabilitation and protection work under Bankura Highway Division in the district of Bankura.
Restoration of damaged carriageway at the approach road of Liluah ROB during the year 2025-26.
Repair and rehabilation of Birati ROB under Kolkata North Division,PWD during the year 2020-2021
PAINTING OF KERB AND RAILING AT EM BYPASS FROM PATULI TO BAGHAJATIN ROB UNDER BR XI
Zonal work for General repairs and maintenance of station, Platform, station building, service buildings, staff quarters and others new minor works etc in Sealdah south section km 0/53 to LC no 5/S/T upto KM 5/29 (SPR approach) including Kankurgachhi ... all bridges , ... of bridges (sub ...
Re-construction of notch cum foot bridge at ch. 1.00 K.m over Ratan Pur canal of 1-Main canal at ch. 7.48 km. at Block- KGP-II and P.S- Kharagpur Local Dist-Paschim Medinipur.
Comprehensive Electrical Installation Operation and maintenance of different Compactor Stations situated under BMC (WT - 13, Mahbir Bikash, 4no. Foot Bridge, Baishakhi, SW - 4, City Center, FE, Island, Kestopur Stack Yard, CK,Salua) for 1year
Construction of new concrete road with road protection structure from 206 Foot bridge to Thakdari Road and other branch roads under ward no. 25 and 26 within BIdhannagar Municipal Corporation. (Fund -Road Restoration Fund)
Construction of RCC Bridge at Vekutia Gayanbari over Tengua khal near Tapan Maitys house in Block Nandigram I P S Nandigram District Purba Medinipur2nd call