Loading…
Loading…
2,654 results • Best match
Mayagoyalini- Kamalpur Road from 0.000 kmp to 9.350 km, widening and strengthening work including constn of RCC bridge at ch 3.047 km and at ch 9.123 Km under Diamond Harbour Highway Division in the district of South 24 Parganas. (3rd Call)
Protection work at Rangamati Sluice and R Bank of Rangamati Khal near Sluice in connection with the construction of RCC bridge at Rangamati in Block- Uluberia -I, P.S. - Uluberia, District Howrah under Head Quarter section of Seijberia (I) Sub Divn
Construction of 4 four number Single Lane RCC Bridge in Mouza- Jarura over Jarura Khal, Bishnupur over Dokhali Khal, Kerur over Kalimondop Khal and Tutranga over Sati Khal and construction of 1 one number Sluice cum Bridge at Mouza- Nimkimohar over
AMC of Clearing and Removing of Drainage Congestion from Waterways and Slope of MMC (Reach-VIII) for a length 5.00 K.M. From Gangarampur RCC bridge to Chandipur R.C.C. bridge in Uluberia Municipality under Rajapur Sec of Sei(I) Sub-Divn
A.M.C. of clearing and removing of drainage congestion for waterways and slopes of Maja Damodar Branch Khal for the length of 500.00 from Kamarkhola Sluice to Kamarkhola RCC Bridge in GP-Jhamtia of Amta-II Block, P.S.-Amta underLDCSD-I
A.M.C. of clearing and removing of drainage congestion from waterways and slopes of MMC (Reach-VIII)for the length of 5.00 km from Gangarampur RCC Bridge to Chandipur R.C.C Bridge in Uluberia Municipality in GP-Maheshpur and Chandipur,sej(I)sec
A.M.C of clearing and removing of drainage congestion for waterways and slopes of Maja Damodar Branch Khal for the length of 500.0 from Kamarkhola Sluice to Kamarkhola RCC Bridge in GP-Jhamtia of Amta-II block , P.S-Amta in Dist-Howrah
Repairing of slip/slope failures occurred due to very heavy and intermitent rainfall from 14.09.2024 to 16.09.2024 over Right Ex-Zamindary Embankment of Ganapath Khal for a length of 60 Meter at country side near Simultala RCC Bridge at Mouza-Khorai
Clearing removing of water hyacinth including clearing of Jungles along the slope bank and removal of debris for the period upto 15th March2023 From Kanaidanga to Gabberia RCC Bridge of Rajapur Main Channel in Block PS- Domjur JB PurDist- H
Repairing of 2 Nos. Box Culvert at 4.20 km and 5.00 km and 1 No. RCC Bridge at 5.60 km of Bindol Bishnupur Road in the district of Uttar Dinajpur under Uttar Dinajpur Highway Division during the year 2023-24.
Construction of Single lane RCC Bridge over river Nonagong at 37.30 km of Mouza- Hijlia Block - Habra-II on the right bank and Mouza- Mominpur Municipality-Ashokenagar-Kalyangarh, on the left bank P.S.-Ashokenagar in the Dist. of North 24 Pgs
Rehabilitation of height bar at Keyatala Sluice cum Bridge at Ch 410 over Suryapur Inner channel in connection with Reconstruction of RCC Bridge over Suryapur Inner channel by Public Works Department in GPSankarpur II Block and PS Baruipur Dist Sout
Construction of Low cost RCC Bridge over Metai Khal at Nonakundu near Nonakundu Mannapara fultala and GP Uttar Jhapordah in Block AND PS Domjur Dist Howrah. (Renovation of Nonakundu 1 no Bridge Phase I sch no106972629 from 15th FC 202324Allotme
Special repair of RCC bridge over Udaipur Khal at Ch. 141 in Word no.35 of Kamarhati Municipality P.S. Belghoria District North 24 Parganas under Urban Drainage Division during the year 2025_2620.00 mtr. and construction of concrete road in between
Clearing removing of water hyacinth including clearing of Jungles along the slope bank and removal of debris for the period upto 15th March 2024 From Harer Pole to Mahiary RCC Bridge of Saraswati River in Block PS Domjur Dist Howrah
Clearing removing of water hyacinth including clearing of Jungles along the slope bank and removal of debris for the period upto 15th March2023 From Harer Pole to Mahiary RCC Bridge of Saraswati River in Block PSDomjur, Dist- Howrah under Lo
Flood Protection and mitigation work for reducing vulnerability of people by repair to damages of inspection path at right embankment of Amrakhali khal from Bhanjapur RCC bridge to Kon-Chouki for a length of 1600.00m occured due to very heavy rainfa
Clearing and removing water hyacinth and vegetative growth from SAMD Part-II main Drainage channel starting from (0.00 M) Lenin Sluice to Ramdhari RCC Bridge for a length of 6.30 Km. within Block and P.S. - Baruipur under Mograhat Drainage Division.
A.M.C. of clearing and removing of drainage congestion from waterways and slopes of MMC(reach-VIII) for the length of 3.20 km from Uluberia lock gate to Gangarampur RCC Bridge in Uluberia Municipality, Block-Uluberia-I, P.S-Uluberia undersdo(sej)
Emergent restoration of Inspection path on the right bank of river Kana Damodar near Budul RCC Bridge in GP-TK-2 ,Block-Uluberia-II ,District- Howrah under LDC Sub Division No-IV of LDC Division during the year 2022-23
Construction of 4 nos. sluice cum double lane RCC bridge at 8.427 km, 9.64 km, 9.90 km, 10.148 km of South 24 Pargana embankment cum Dhola-Nishchintapur road at Santhiberia, Gobindapur, Laxmipur within Block and PS Kulpi, Dist. South 24 Pgs.
Auction of 124 (One Hundred Twenty Four) Nos. Of Trees in connection with the work Construction of RCC Bridge over River TARAFENI at 31st Km of Dahijuri Binpur Silda Hatiary Road (SH-9) under Jhargram Highway Division in the district o
Construction of single lane RCC bridge over Sealdahgong Main Channel at Kultala ch.10.360 km connecting to Malatipur on right bank and Benki (Taki Road) on left bank in replacement of old dilapidated bridge in Block Basirhat - II, P.S. Basirhat
Repair Works to Mekhliganj Sub Divisional Court Mekhliganj under Teesta Bridge Construction Division P W D Mekhliganj during the year 2022 2023
Rehabilitation work of Dankuni ROB including its viaducts at 2nd km of T.N. Mukherjee Road, Dankuni under Hooghly Highway Division No.-II, in the district of Hooghly. 3rd Call.
Emergent work to Baruipur ROB Approach (LHS) Kolkata Side (Near Najrul Sarani)-Protection of Road side flank by Eucalyptus bullah pilling and earth work during the year 2024-2025
Painting and Allied Works of Uluberia ROB under Uluberia Highway Sub-Division of Howrah Highway Division, in the District of Howrah, in the Year 2024-25under Non Plan Head.
Conversion of 33 KV OH line by 33 KV UG Cable at Panchanantala ROB between Berhampore-Court and Cossimbazar Railway station under Berhampore Division in the district of Murshidabad
Preparation of Detailed Project Report (DPR) for Construction of Bridge over Rakti River at Fulbari Sansad within Patharghata GP under Matigara Developmet Block in the district Darjeeling.
Construction of Bridge cum regulator structure at Ch. 78.00 over Alampur Khal at Bagpara G.P.- Satgachiya, P.S.- Nodakhali, Block - Budge -Budge II, 24 Parganas (S) (Civil Part)
Construction of Bridge over Charial Canal near Charial More at 22nd KM of Budge Budge Trunk Road under South 24 Parganas Division, PWDte during the year 2018_2019
CONSTRUCTION OF BRIDGE WITH PROTECTIVE WALL BETWEEN KAMALGACHH BSF ROAD TO KAMALGACHH VILLAGE AT BARAPANI SANSAD, KHUDIGACHH WITHIN CHATHAT BANSGAON G.P. (PHASE I) UNDER PHANSIDEWA BLOCK (BADP)
Rehabilitation of Distressed Bridges at 8.49 Km 10.30 Km and 11.49 Km of MMC and 11 no of bridges in between 0.245 Km 2.595 Km of Dy 1 of MMC and 0.503 Km and 0.724 Km of Dy2 of MMC and 1.64 Km 1.89 Km 2.40 Km 4.977 Km of Dy 4 of MMC within
(A)Re-girdering & jacketing with provision of Sub-bank & other ancillary work of Bridge no-12, 17 & 18 (MDP-GRD) under AEN/BRL/ASN,(B)Re-girdering & other ancillary works of Br. No. 520/B in between KAN-ASN ML line section under ... of Foot Over Bridge with ...
M R to wooden bridges at Ghanoshyamchak and Manuchak over Link channel of Maja Damodar within G P Amoragori Block Amta II Dist Howrah
Installation of Signage Board to the Bridges, ROBs and Roads under the jurisdiction of the Midnapur Division, PWD in the District of Paschim Medinipur.
INSTALLATION OF SIGNAGE BOARD TO THE BRIDGES AND ROADS UNDER KALIMPONG SUB-DIVISION - III P.W.D. IN THE DISTRICT OF KALIMPONG UNDER KALIMPONG DIVISION, PWD.
Preparation of PPR of Bridges under Rural connectivity within 25 (twenty five) No. Blocks under WBSRDA, Purba Medinipur Division and Contai Division, Purba Medinipur.
Supplying and installation of signage board to the Bridges ROBs and Roads under Galsi Highway Section of Durgapur HighwaySub-Division under Asansol Highway Division
Erection/Launching and de-launching of Bailey type portable steel Bridges at various location in India to be executed as per SOTR (Annexure-I).
Repair and Rehabilitation work of bridges and culverts on Dahijuri-Binpur-Silda-Hatiary Road from 0.00 kmp to 31.50 kmp under Jhargram Highway Division
Rehabilition and restoration of two nos major distressed bridges over River Lower illsurah at Milky and Bagghata in Block and P.S Dhaniakhali, District Hooghly.
Installation of Signage Board to the Bridges ROBs and Roads of Jhargram Highway Sub Division under Jhargram Highway Division in the Dist of Jhargram
Installation of Signage Board to the Bridges, ROBs and Roads of Gopiballavpur Highway Sub Division under Jhargram Highway Division in the Dist. of Jhargram.
Construction of plant and manifold room with connecting bridges for set up of MGPS connection for new 100 bedded building, Habra SGH - EI work.
Non-Comprehensive Maintenance Contract for M/s Honeywell Automation India Limited(HAIL) make DCS and PLC systems OF LOB, FOB, FCCU, VDU-II, SRU-IV and OM and S with OEM M/s HAIL.
Installation of Sign Board and Fencing work on PWD Land under Teesta Bridge Construction Division, Mekhliganj, Cooch Behar in the year 2024-25.
Surfacing and Protection work from Haldibari-Kharibari Road V.Rr. from 0.00 Kmp. To 2.621 Kmp. under Teesta Bridge Construction Division. Project ID- PD232409481S000
Repairing and maintainance works of Haldibari rest shed Under Teesta Bridge Construction Sub-Division-II, P.W.D, Haldibari, CoochBehar. during the year 2025 - 2026.
Repair and Rennovation works to X-Ray room of Mekhliganj Sub -Divisional Hospital, Mekhliganj under Teesta Bridge Construction Division, PWD, Mekhliganj, Cooch Behar.