Loading…
Loading…
2,654 results • Best match
Erection of Height Bar over both side of dilapidated Motir Pole RCC Bridge over Nowi Khal at Ch630 in Rohanda Chandigarh Gram Panchayet under Block BarasatII Bidhan Nagar Municipal Corporation within PSMadhyamgram and Narayanpur District North24Parga
Clearing and removing water hyacinth from Jofully khal in between Ramtarak Mahasweta RCC bridge and Nahala Masjid ,Mouzas Agar and Nahala for a length of 6.00 Km , Blocks Sahid Matangini and Kolaghat under East Midnapore Division
Comprehensive maintenance to IBB Road (ID 56,56A,57,58,59,60,60A and 61 from BP No. 794/3-S to 860/7-S, Total Length 109.318Kms) under Mekhliganj Border Fencing Sub-Division, West Bengal, during the Year 2023-24, 2024-25 and 2025-26. SH: Ordinary ... Repair, Bridge Repair and ...
Emergent work from Fulbari to Abari-FalakataRoad from chainage 7th km Fulbari-Gazoldoba ROB Crash barrier Painting under Jalpaiguri Highway Division during the year 2024-25.
REPAIRING OF PATCHES/UNDULATED PORTIONS OF EM BYPASS (WESTERN FLANK) FROM NEAR CROSSING OF PATULI CONNECTOR TO BAGHAJATIN ROB IN WARD NO. 110 UNDER BR XI
INSTALLATION BY POLE MAST LIGHTING SYSTEM AT MANMATHA GANGULY ROAD AND 2, B.T. ROAD FOR BETTER LIGHTING SYSTEM OF TALLAH ROB (HEMANTA SETU) UNDER BR-I.
Emergent work to Baruipur ROB Approach (LHS) Hospital Side- Protection of Road side flank by Eucalyptus bullah pilling and earth work during the year 2024-2025.
REPAIRING OF GULAB ROB LANE FROM S.H. ROAD TO SHIMPUKUR LANE JUNCTION BY LAYING HOT MIXTURE WITH ALLIED WORK, IN WARD NO. 139, UNDER BR. -XV.
Removal of Super Imposed Dead Load by means of non vibrational robotic crashing from Carriageway of Belgachia ROB under kolkata North Division during the Year 2019_20
Fire Proofing work of various structures at Haldia Refinery (Phase-II) Part-A ( DHDS Block, OHCU, LOB, FOB and other units) and Part-B (Offsite, Gantry, DYIP and other area)
Construction of Bridge at Harinmuri Khal Dakhin Par under Kushadwip Gram Panchayat within Patrasayer Panchayat Samity during the year 2025-26 Fund- 5th SFC
Soil investigation for proposed construction of Bridge over Bhagirathi River at Chandipur under Rathbari GP, Block Kaliachak II, Dist Malda under Malda Irrigation Division
Construction of Bridge at Harinmuri Khal Uttar Par under Kushadwip Gram Panchayat within Patrasayer Panchayat Samity during the year 2025-26 Fund- 5th SFC
Construction of 05 nos single lane RCC Bridge at Gochhati Kacharipota over Gumrai Khal and at Jote Ghanashyam Lakhsmikundu over Solatopa Khal and at Mouza Jote Ghanashyam Banshkhal over Palaspai Khal in Block-Daspur I and DaspurII
Confirmatory Geothechnical Investigation in connection with Construction of Proposed RCC Bridge in replacement of the existing narrow Bridge at 31st km of Barakar Purulia Road(SH-5) in the District of Purulia.during the year 2024-25. 2nd
clearing of Drainage Congestion occurred due to very heavy and intermitent rainfall from 14.09.2024 to 16.09.2024 in between Mohini Bazar RCC Bridge to Narayanbarh Primary School from River Kapaleswari for a length of-250.00m of Mouza-Narayanbarh,
Removal of water-hyacinth and Drainage Congestion of Baghai river near Biswnathpur RCC Bridge ( Length of work - 1.20km) in GP.- Naipur, Bclock - Patashpur-I, P.S.- Patashpur and Dist.- Purba Medinipur during the year 2023-24 2nd Call
Conducting Geo-Technical Soil Investigation with preparation and submission of requisite report for the Construction of proposed RCC Bridge over river Babla at Lohadaha Ferry Ghat ......in the district of Murshidabad under MHD-II during 2024-25
Protection work to the right bank of Upper Bagjola Khal for a length of 185 M at the downstream of Satin Sen RCC Bridge within Ward No. 17 of Baranagar Municipality, PS - Baranagar, District- North 24 Parganas
Construction of one double lane RCC bridge in replacement of existing dilapidate RCC box culvert at 9.13 km of river Sunti within village Palpara, GP Kemia- Khamarpara, Block- Barasat-II, PSBarasat , Dist.- North 24 Pgs. (2nd call
Repair of 5 nos RCC bridge over DWF Channel at Ghoshpur, Chandipur, Bamunia, Nalmuri and Borali under C.D.O Sub-Division III of C.D.O Division in Block -Bhangore I, Haroa, P.S-Bhangore , Haroa,Dist.-South , North 24 Parganas.
Rehabilitation of 4 nos single lane RCC Bridge at Ch 3, ch 220 ch 303 and ch 409 of Dy 15 of BBC under Vishnupur Irrigation Sub Division of Bankura Irrigation Division during the year 2026 27
Restoration of 10 nos. cart bridges in between Ch.0.730 km to Ch.10.770km of Dy-2 and 8 nos. cart bridges in between Ch.0.367 km to Ch.7.230 km of Minor-3 of Dy-2 of Teesta Mahananda Link Canal_TMLC in P.S.- Rajganj and Sadar, District-Jalpaiguri.
Installation of Signage Board to the Bridges, ROBs and Roads under the Jurisdiction of Katwa Sub-Division under Burdwan Division, P.W.Dte.
5(five) nos. Bridges-Rehabilitation work under Midnapore Highway Division in the District of Paschim Medinipur. Project ID- PD202129246S000. 3rd Call.
Repairing work of Bhagirathi Bridges both side approach road in stretches under Murshidabad Highway Division No.I. during the year 2024-2025.
Installation of Signage Board to the Bridges, ROBs and Roads under the Jurisdiction of Kalna Sub-Division under Burdwan Division, P.W.Dte.
Installation of Signage Board to the Bridges, ROBs and Roads under the Jurisdiction of Burdwan Sub-Division under Burdwan Division, P.W.Dte.
Installation of Signage Board to the different Bridges/ROBs under Barasat Highway Division No.I in the district of North 24 Parganas.
R.C.C Bridges at 1.85 km of Sarda Bhujung Road Rehabilitation Work under Birbhum Highway Division-I in the District of Birbhum
Installation of Signage Board to the Bridges, RoBs and Roads under the Jurisdiction of Murshidabad Highway Division No.II during 2023-24
Clearing of Drainage Congestion occurred due to very heavy and intermitent rainfall from 14.09.24 to 16.09.24 in between Barbhemua Wood steel Composite bridge to Gobindapur RCC Bridge from Ganapath khal for a length of 2480m Mouza Bhemua Gopalpur
Cleaning and removing weeds and water hyacinth from Topa Khal from Talita RCC bridge to Jadupur for a length of 11.00 Km in Mouza Nochipur, Keshapat Hatisal, Ramnagar and Jodupur, Block Panskura and Kolaghat under East Midnapore Division
Clearing removing of water hyacinth including clearing of Jungles along the slope bank and removal of debris for the period upto 15032021 From Harer Pole to Bipannapara RCC Bridge of Saraswati River in Block PS Domjur Dist Howrah
Construction of 4 number Single Lane RCC Bridge in Mouza Jarura over Jarura Khal, Bishnupur over Dokhali Khal Kerur over Kalimondop Khal and Tutranga over Sati Khal and construction of 1 number Sluice cum Bridge at Mouza Nimkimohar
Resectioning of New Monikhali khal from 4.315 Km (Downstream of Sontoshpur Rly. RCC Bridge) to 6.45 Km (Upstream of Akra 6-Vented Sluice gate) within Ward Nos. 7, 8 of Maheshtala Municipality, P.S. Maheshtala, Dist. - South 24 Parganas
Hospitality Work Including Making Pandel Supplying and Installation Of Furnitures Installation Of Electrical And Sound equipments In Connection With The Inaugural Ceremony For The Work Construction Of Rcc Bridge At Ch 4.80 Km Over Kestopur Canal In B
Mechogram -Gabindapur Road from 0.00 kmp to 3.96 km, Excluding 215m for RCC Bridge with approaches over Kangsabati River at Joykrishnapur, named as Sadarghat Bridge at Ch. 2.4 Km., Surfacing work under Tamluk Hway Divn. Project ID PD212244783S000
Construction of 06 (Six) nos single lane RCC Bridge at Mouza Bhuta (Ghanashyam Bati) ,Harekrishnapur over Chandreswar Khal and at Mouza -Barasat over Pyrasi Khal and at Mouza Barasat ,Panchgechhya , Gochhati over Gumrai Khal in Block Daspur II
Construction of 04 (four) nos single lane RCC Bridge at Mouza Chak Purusottampur and Radhaballavpur over Bhasra Khal in Block , P.S.Debra, and Mouza BarBasantapur, Jinshar over Midnapore Main Canal in Block Kharagpur-II, P.S.- Kharagpur (Local) in t
Emergent Protection work on Road side Flank of ROB Approach Near Najrul Sarani (Bihind Asma Dhaba)lay EucaliptasBallah Piling and earth filling, During The Year 2025-2026.
Emergent erection of Metal Beam Crush Barrier at different Spot of Baruipur ROB Approach Road from Sonartari, to Flyover and Hospital End - during the year 2025-2026.
Installation of MS Divider at cut out portion of existing concrete Divider on GT Road from Nababhat to Ullash more (except from ROB end to Birhata Bridge)
Construction of CC Road With Cover Slab drain From House of Rob Kaka to House of Nuro Kena. (Length- 60 Mtr) under Maheshtala Municipality ward No 21
REMOVAL OF SILT FROM DRAINAGE SYSTEM OF M.S. DARGA BYE LANE, GULAB ROB LANE, JAKARIA MOLLA LANE AND ITS SURROUNDING AREA IN WARD NO. 139, BR. XV.
REPAIRING AND RENOVATION WORKS OF STREET LIGHTING SYSTEM AT JAKARIA MOLLAH BUSTEE, GOLAB ROB LANE BUSTEE AND OTHER BUSTEE SURROUNDING AREAS IN WARD NO -139,BR -XV.
Emergent construction of new DWC pipe drain near Baruipur Mukta mancha at Baruipur ROB approach (Kolkata Side) under South 24 Parganas Division- during the year 2025-26
Repairing of Chamber of E.E., A.E., J.E. rooms of PIU ROB South Zone and Chamber of E.E., B.H.Div II, P.W.Roads in the district of north 24 Parganas
Construction of Bridge over a Channel connected with Kalindri river with approch road - Protection work from Kairitola Ghat to Araidang G.P. to Fulbari Ghat, Malda.
Construction of foot bridge over water canals near the H/O Kanai Barman, H/O Sishir Brman, H/O Tapash sen and H/O Goutam Karjee at part no 12/6 and Construction of Sanko repair near towards Buri Torsha River at part no 12/1 under Salkumar-I GP