Loading…
Loading…
2,653 results • Best match
M.R to Doltala Wooden Bridges over SAMD Part-I, P.S- Sonarpur Dist- South 24 Pgs under MDD-II.
Emergent M/R of Samukpota wooden Bridges at Ch.27.85 Km over Tollys Nullah Channel under MDD-II.
Repairing of Wooden Bridges over Soadighi Khal near Maity Para, Mouza- Deriachak, Block- Kolaghat under East Midnapore Division.
Bridge Consultant for preparation of PRIORITY LIST OF VULNERABLE BRIDGES AND PRILIMINARY PROJECT REPORT (PPR) IN BANKURA DISTRICT.
Emergent repair of Wooden Bridges at Uiiujhora over SAMD Part -I, PS -Barupur,Dist.South 24 Pgs.Under MDD-II
Annual maintenance works on an urgent basis for different bridges situated at different locations on E. M. Bypass
PROJECT MANAGEMENT SERVICES (PMS) FOR CONSTRUCTION OF 06 NOS (SIX) OF BAILEY BRIDGES IN DIFFERENT LOCATIONS OF NAGALAND.
Clearing and removing of water hyacinth for the period of July 2024 to 30 Th November 2024 in between Kamargoria to Narit Foot Bridge of Lower Rampur Khal and its branch Length 1.80 Km Block Amta II P S Joypur under Lower Damodar Constructio
Repairing of ICDS Centre AWC NO.19645170409, Construction of Foot Bridge at Jumpoi near the H/o Elias Borogaon, CC road from PMGSY road to near the H/o Ranjit Bhowmik at Nararthali Pitrus Tigga to Paladush Toppo under Khoardanga-I GP within Kumar
3 Cells Box Culvert (3.0 m X 3.0 m ) at 2.20 km Salbari High School - Salbari Cold Storage Road, Construction work by replacing old composite minor Bridge under Jalpaiguri Highway Division in the district of Jalpaiguri. Project ID PD202131115S000
Providing and installation of M S Structural steel joists beneath the distressed slab of minor bridge over Sonai Khal ch 2 40 KM on Madhusudan Banerjee Road under Kolkata North Division P W Dte During the year 2025 2026
Emergent Strengthening and Rehabilitation work of a Minor Bridge (Span 2 x 4.90 m with 12 nos 1.0 m dia Hume Pipe) at 4.97 KM of Joypur- Pundag-Karkara Road under Purulia Division, P.W.D. during the year 2018-19.
Stacking earth at Dobandy Section Office complex , near Prajabar RCC Bridge and near Kalai Bazar for emergent flood restoration works during Monsoon 2026 in Mouzas- Ranichak, Prajabar and Kalai, Blocks-Tamluk, Moyna and Panskura
Construction of RCC Bridge at chainage 3.047 km of Mayagoyalini - Kamalpur Road under Diamond Harbour Highway Division in the district of South 24 Parganas at Sagar Island for the Financial Year of 2024-25
Construction of 06 nos single lane RCC Bridge at Mouza Sikmi Kalrigeria over Drainage khal and Routchak Alugeria Antra, Kanchanpur Panchanagar over 4Main canal in Block KharagpurI Kharagpur-II Pingla PS Kharagpur Local Pingla.
M R to Clearing and removal of water hyacinth of Beta-Khagda Canal from Beta Hat RCC Bridge to Balighai Baromile khal at GP.- Dubda, Block- Egra-II, P.S.- Egra, and Dist.- Purba Medinipur
Clearing and removing water hyacinth from Murail khal in between Siddha Ghat and Kaminachak RCC bridge for a length 3.00 km Mouza Kisharchak Blocks Panskura and Kolaghat, District Purba Medinipur under East Midnapore Division.
Construction of 120 m long CC approach road to Mechogram RCC bridge along with RCC retaining wall over left embankment of Dehaty canal at Dakhin Mechagram in Block and PS Panskura District Purba Medinipur
Clearing and removing water hyacinth from Dehaty Channel in between Naranda Hanuman Mandir and Panshila RCC bridge for a length 12.70 km Mouzas Kanakpur , Diglabar and Parit Blocks Panskura and Kolaghat, District Purba Medinipur
Clearing and removing water hyacinth from Joyfully khal in between Ramtarak Mahasweta RCC bridge and Nahala Masjid for a length 6.00 km Mouzas Agar and Nahala, Blocks Sahid Matangini and Kolaghat, District Purba Medinipur
Construction of Approach Road Length of work 210 meter for the newly constructed RCC Bridge at Mohinibazar over Left Embankment of River Kapaleswari in Mouza Narayanbarh Block and PS Sabang and Dist Paschim Medinipur
Clearing and removing water hyacinth from Dewankhali Khal in between Rajgachtala Sluice and Srikristopur RCC Bridge for a length 4.50 km Mouzas Rajnarayanchak, Kalagechia, Purba Chilka and Md. Murad,Block Panskura, District Purba Medinipur
Augmentation of drainage capacity of Sluice near Sethchak RCC Bridge over Left Embankment of Kalimondop Khal at Mouza- Mohar, Block and P.S.- Sabang and Dist. Paschim Medinipur in connection with KKB Basin Drainage Scheme
Clearing removing of water hyacinth including clearing of Jungles along the slope bank and removal of debris for the period upto 15th March 2024 From Kanaidanga to Gabberia RCC Bridge of Rajapur Main Channel
Clearing and removing solid semisolid compact mass from the bank and slope of Adiganga Channel near Chowhati RCC Bridge from 1st May 2025 to 31st May 2026 13 Months in Dist South 24 Parganas.
Preparation of DPR for surveying, planning, designing, drawing etc. for the construction of RCC bridge over river Kumlai including approach road on both the sides at Demkujhora Thapa Busty under Mal Block, Dist. Jalpaiguri.
Cleaning and removing weeds and water hyacinth from Joygopal Khal from Murail haat to Kaminachak RCC bridge for a length of 2.00 km in Block and P.S Panskura and Kolaghat under East Midnapore Division
Cleaning and removing weeds and water hyacinth from Murail Khal from Siddha Ghat to Kaminachak RCC bridge for a length of 2.00 km in Block and P.S Panskura and Kolaghat under East Midnapore Division
Repair of Moorum inspection path of length 5400M over Left Embankment of Kaliaghai River from Dehati RCC Bridge to Duria Club in Mouza-Duria, GP-14 No Khursi, Block P.S.-Narayangarh,Dist.-Paschim Medinipur.
Emergent balance work of repairing of damaged portions of concrete surface of Girder marked LG2 and LG3 of span P24 - P25 ( Bakkhali side) of the newly constructed High Level Major Bridge on river Hatania - Doania at Km. 113.297 of NH-117 under NHD-I
Construction of Road side drain adjacent to R.O.B at Katwa-Kalna Link Road Burdwan under Burdwan Division, P.W.D. during the year 2021-2022. (2ND CALL)
Construction of Road side drain adjacent to R.O.B at Katwa-Kalna Link Road Burdwan under Burdwan Division, P.W.D. during the year 2021-2022.
REPAIRING OF ROAD BY LAYING HOT MIXTURE AT GULAB ROB LANE, GULAM MOLLA LANE, SLAUGHTER HOUSE ROAD ETC. IN WARD NO-139, BR-XV.
Emergent Repair to Baruipur ROB Approach (Kolkata Side and Hospital side) with potholes repairing and premix surfacing in patches-during the year 2025-2026.
Construction of CC Drain from Abdur Rob house to Balam house via Kochi house including slab at Jugore Under Sagardighi Gram Panchayat under sagardighi
Service road of Barrackpore ROB from 1_30km repairing work under Barrackpur Division PWD in the District of North 24 pgs during the year 2020_21
SUPPLY OF SERVICES FOR OPERATION AND ROUTINE UP KEEPING OFSTREET LIGHTING SYSTEM FROM VIP BAZAR TO BAGHAJATIN ROB AT E.M. BYPASS UNDER BR-XII.
SUPPLY OF SERVICES FOR OPERATION AND ROUTINE UP KEEPING OFSTREET LIGHTING SYSTEM FROM VIP BAZAR TO BAGHAJATIN ROB AT E.M. BYPASS UNDER BR-XII.
Installation of Submersible with Tank near Abdul Rob house at Seikhpara village under Bokhara-II GP Work Id- 121022461, 2025-26, AAP no-33
Emergent work to Baruipur ROB (Hospital End) -Protection of road side flank by Eucallptus bullah pilling and earth work during the year 2024-2025.
Construction of railing above footpath on Baruipur ROB approach road(kolkata side)at RHS under South 24 Parganas Division - during the year 2026-2027.
IMPROVEMENT OF ROAD AT BAISHNABGHATA PATULI Q BLOCK FROM 267, RABINDRA PALLY TO APPROACH OF BAGHAJATIN ROB IN WARD NO. 110 UNDER BR XI
CONSTRUCTION OF BRIDGE NEAR THE HOUSE OF BAHAR SAHEB AT CHILLAGRAM (J.L NO. 245, DAG NO. 231/246) UNDER NANDIGRAM I BLOCK.
Construction of bridge right abutment return wall,wing wall approach road at Alinagar on Suti River under Raipur G.P in Nowda Block
Soil investigation work in connection with the construction of bridge over River Banka in Vill-Aswathogoria, Block-Bardhaman-II, District-Purba Bardhaman
Construction of Bridge at 11_85 KMP of Memari Chakdighi Tarakeswar Road under Burdwan Division in the district of Purba Bardhaman 2nd Call
Additional works in connection with the Construction of Bridge Over Damodar Main Irrigation Canal at Galsi, in the district of East Burdwan
Construction of bridge over river Mara Naotara 3x12 Mtr. 36 Mtr. Long RSJ bridge within Dawaguri GP under Coochbehar I Dev. Block.
Construction of bridge over river Mara Naotara 3x12 Mtr.36 Mtr. Long RSJ bridge within Dawaguri GP under Coochbehar I Dev. Block.
Construction of bridge left abutment return wall,wing wall approach road at Alinagar on Suti River under Raipur G.P in Nowda Block.