Loading…
Loading…
2,652 results • Best match
Clearing and removing water hyacinth from Pratapkhali Khal in between Rajarampur RCC bridge and Tengrakhali Chhoiprokar for a length 6.00 km, Block- Nandakumar, District Purba Medinipur under East Midnapore Division.
Construction of concrete inspection path from Upaldah RCC bridge to Bhoumik para on right bank of Buxi for a length of 2.60 km in Block P.S Pingla, District Paschim Medinipur.
CONSTRUCTION OF 03 NOS SINGLE LANE R.C.C. BRIDGES IN REPLACEMENT OF EXISTING DILAPIDATED BRIDGES AT CH. 6050, CH. 6157, CH.16666 OVER DWF CHANNEL WITHIN B.M.C., BLOCK BHANGORE-II, P.SS- BIDHANNAGAR , KOLKATA LEATHER COMPLEX, DIST-SOUTH 24 PGS
(B) Construction of wooden bridges (3 nos.) inside of Rose Garden within Eco-Park, Newtown, Kolkata.
Installation of Signage Board to the Bridges and ROBs under the jurisdiction of Barasat Division P.W.Dte.
Kulik Bridge over Kulik river at Sohoraii rehabilitation of the bridges under Uttar Dinajpur Highway Division
Day to day maintenance work on M B Road except Belghoria ROB and Birati ROB cleaning rubbish removing chokage of gully pit and repairing grill and painting works etc from ch 0 00 Kmp to Ch 7 20 Kmp under Kolkata North Division P W D during the year
Reconstruction of 4 lane Tallah ROB (Hemanta Setu) Adjacent TO Tallah Railway Station On Barrack pore Trunk Road, Kolkata, West Bengal
Repairing of Link road of Mourigram ROB under Shibpur Sub Division under Howrah Division during the year 2025-2026 ( Alampur Side).
Special Repair and rehabilitation of Tentulia ROB at 15th Tentulia Maslandapur Road under Barasat Division,PWD during the year 2020-2021
SUPPLY AND DELIVERY OF ENERGY EFFICIENT LIGHT FITTINGS FOR THE EASTERN AND WESTERN SIDE OF BAGHAJATIN ROB TO VIP BAZAR BYPASS.
Repairing of Link road of Mourigram ROB under Shibpur Sub Division under Howrah Division during the year 2025-2026 Chunavati Side.
CONSTRUCTION OF SANITARY LATRINE AT DIFFERENT PLACES OF GOLAM ROB LANE, HAJI RATAN LANE AND ITS SURROUNDING AREA IN WARD 139
Emergent work to Baruipur ROB approach (Hospital End) to dispose of stagnant water over road surface during the year 2024-2025.
Bagnan ROB at 0.30 Km of Bagnan-Sricol-Kamalpur Road, Rehabilitation work, Under Howrah Highway Division in the District of Howrah
Consultancy Services for preparation of DPR for the work construction of road over bridge at change Km. 20.575, Km. 22.882 , Km. 22.882 (Over Railway Level crossing No.-27) at Habra of NH-35 under NH Divn-V, P.W.(Rods) Dte in the Dist of N24 Pgs, W.B
Sonadanga Bridge repair at 4th Km of Kusumgram-Samaspur Road under Kalna Sub-Division, P.W.D in the district of Purba Bardhaman_2nd CALL.
Consultancy Services for Preparation of DPR for Construction of RCC Bridge over Bhudeb Babur Khal at village Dekhnamari and Purba Sankardaha in Boyermari-I and II G.P. under Sandeshkhali - I Block
Geotechnical Investigation including soil testing for construction of RCC Bridge at Mouza-Jagadishpur- Jhikuria over New Cossye river Block and PS-Panskura,Dist.-Purba Medinipur under East Midnapore Division 2nd Call
Clearing and removing weeds and water hyacinth from Joygopal Khal in between Murail Hat to Kaminachak RCC Bridge for a length 2.20 km , Blocks Panskura and Kolaghat under East Midnapore Division
Rehabilitation of 7 nos minor distressed RCC bridge at Hazrasura Katapukur Samanta Khali Jhingleswari Mathjashora Kalagachia and Murali in Block and PS Nandakumar, Mahisadal, Panskura, Moyna and Kolaghat District Purba Medinipur
Construction of 6 number Single Lane RCC Bridge in between Mouza Bhikni Batitaki Laksha and Chak Abdulla Chandagogra over River Deuli at Mouzas Panchpara and Barampur over Benedighi Khal Sub-Kapaleswari.
Repairing cum Rehabilitation of 16.50 m Span RCC Bridge at 6.50 Km of Dhundhulia - Shyampur Road under Uluberia Highway Sub-Division of Howrah Highway Division in the district of Howrah, PWRD
Improvement of drainage capacity of Kolla khal from house of Bhutunath Jana Mouza Purbakola to outfall Gangakhali Khal near Khamarchak RCC bridge Mouza Harashankar Khamarchak for a length of 3 Km
Sub-Soil Investigation for proposed new RCC bridge, replacing the existing damaged cart bridge at Ch 25 of Khardah Khal in Panihati and Khardah Municipalities, P.S. Raharah, Distt - North 24 Paraganas.
Construction of Double lane RCC Bridge in replacement of existing dilapidated RCC box culvert in Bamunmura at 12.02 KM over river Sunti under Barasat Municipality, P.S. Barasat, District North 24 Parganas.
Clearing and removing water hyacinth from Soadighi khal in between Kaktiya Durga Mandir and Kishorchak RCC Bridge ,Mouzas Hogalberia and Kishorchak for a length of 10.00 Km in Blocks Sahid Matangini
Clearing and removing water hyacinth from Buxi Khal in between Kalidan Wooden Bridge and Mohimpur RCC Bridge for a length 0.82 km Mouzas Kalidan,Mohimpur, Block Panskura, under East Midnapore Division.
One time clearance,removal of water hyacinth of Balighai Baromile Khal from Chhatri Khal outfall to Near Dubda Choumukh RCC Bridge within Block-Egra-I and IIPS-Egra, Dist-Purba Medinipur.
Estimate for urgent repairing of concrete hand rails/Crash barriers of existing bridges and culverts and painting of RCC hand railing and repairing of footpath of bridges and culverts on EM Bypass in view of the G-20 summit
Up-gradation of road to cement concrete road
Ordinary repair, Flood damage repair of culverts, Construction of gabion wall and Toe wall, Painting of Bridges etc. at various locations in the AOR of 93 Bn between BP No. 750/13-S to 770/1-S along Indo Banagladesh Border in Jalpaiguri District of West Bengal sector during the year 2026-27 Subwork/Packages: Civil work
Protection of roof and ceiling with MSAngles and IRC net including repairing roof for the hanging foot bridge in between Main Building and Annex Bldg at 2nd floor level with in the compound of High Court Calcutta during the year 2022 23
Maintenance and Repair to l one no tubular truss foot Bridge at Modanmohan Ch.17_ 85 KM over Nowikhal under Barasat ll Block and BM Corporation within PS Madhyamgram and Naraynpur in District North 24 Parganas under Urban Draianage Division during t
Flood Precautionary Measure and sluice sealing of 20 nos of sluices located at Both Left and right bank of Lower Rampur Khal from Ronjoyber to Narit Foot Bridge within G P Joypur Jhamtia, Thalia and Gazipur Block Amta II Dist Howrah for the
Augmentation of lighting system from Baisakhi foot Bridge to near Deer Park, Booth no. 137 within ward no-30 under BMC. (Fund - APAS Fund) (Booth no-137, Ref ID- APAS/01/116/137/0001) Booth No- 137/116 Bidhannagar A/C, Scheme 1
Renovation of Single vent HP Inlet near Keoratala RCC Foot Bridge at Ch 618 over Right Bank of Hobka Khal Lower Reach II in Mouza Charaghata Block Joynagar II PS Joynagar Dist South 24 Paraganas of Mograhat I Sub Division under Mograhat D
Clearing and removing of water hyacinth for the period of June 25 to November 25 in between Kansona Sluice to Ranjoybar of Kharibon Khal Ranjoybar to Narit foot bridge of Lower Rampur Khal and Mahishamuri Bansbagan to SPIC sluice of Mahishamuri Kh
Annual Clearing and removing (year 2024-25) water hyacinth from Gunghir Khal from U/s of Nimai Tirtha Road bridge and U/s and D/s of Syphon and Khurigachi Foot bridge for a length of 810 m within Baidyabait Municipality, Dist. Hooghly.
Consultancy services for preparation of Detailed Project Report for construction of Sluice/ Grill/ drop gate for culverts (106 Nos.) and bridges (6 Nos., i/c. 1 bridge of 4 spans) from GIN-105 to GIN-255 having BP No. 243/9-S to 790/7-S in the state ... and bridges (6 ...
Installation of Signage Board to the Bridges, ROBs and Roads under the Jurisdiction of Alipurduar Division, P.W.D
CONSTRUCTION OF CONCRETE PAVEMENT FROM CHECK POST WEIGH BRIDGES TO BIO-REMEDIATION GATE AT DHAPA DUMPING GROUND.
Installation of Sign Board to the Bridges, ROBs and Roads of Midnapore Highway Division, P.W. (Roads) Directorate
Repairing of Wooden Bridges over Dehaty Khal in G.P. Siddha-II, Block-Kolaghat under East Midnapore Division.
PBMC work from km 0.00 to km 50.000 except Talit ROB Bhedia ROB of total length 45.56 km of NH 2B New NH 114 under NH Division No. III and XII in the district of Purba Bardhaman and Birbhum WB during the year 2023 24 Job No. 2B WB 2023 24....
Construction of Bridge with approach road at Baliadangi in Chutiakhore GP, under Chopra Block in the district of Uttar Dinajpur.
Preparation of DPR for Construction of Bridge on Un-bridge Gap over PMGSY Road namely MRLO4-BADSANAGAR TO BADSANAGAR KARBALA
CONSTRUCTION OF BRIDGE OVER THE BABUI KHAL IN BETWEEN KAJIPARA TO KAKRAJIT GRAM SANSAD, PLOT 18, 29 JL NO 79,80
Special Repair of bridge over Dauk Aqueduct at Ch. 6.790 KM of Dy No. 11L of Mahananda Main Canal within Block and PS- Chopra, Dist- Uttar Dinajpur.
Shifting of temporary pump house in connection with the work construction of single lane RCC bridge at Daspara over Guniagachi branch channel, Ward no. 109 of KMC, P.S. Purba Jadavpur, Dist. Kolkata.