Loading…
Loading…
2,652 results • Best match
surgical isolation or surgical masks, Sodium Hypochlorite or Sodium Hypochlorite Solution, Alcohol Based Hand Rub/Hand Sanitizer, bleaching powder stable
M/R to RCC Bridge at 1240 m of Upper Bagjola Khal at RIC Bazar within Ward No. 1 of Baranagar Municipality, District North 24 Parganas under Canals Division.
Construction of 1.5 km concrete inspection path from Radhaban wooden bridge to Kaloi RCC Bridge on Kherai Buxi left embankment in Block P.S Panskura, District Purba Medipipur.2nd call
New construction of RCC Bridge over River TALMA at 15.50 km of Sahu dangi to Belacoba Road, under Jalpaiguri Highway Division in the district of Jalpaiguri. Project ID PD232400410S000.
Clearing removing of water hyacinth for the period of June 2023 to 15 th November2023 From Nilkuti Cross Regulator Gate to Munshirhat PWD RCC Bridge of Kana Damodor River
Soil Test for proposed construction of RCC bridge at 2140.00 m of CC-1 Branch Channel near Hossainpur at Ward No. 108 of KMC, P.S. Anandapur under MDD-II
Construction of RCC bridge by replacement of old dilapidated RCC bidge at Lalpol ch. 735 over Purana Khal in Mouza Uttar Pirpur , Block Uluberia -II , P.S Uluberia , District Howrah
Geotechnical Investigation including soil test in connection with the proposed work Construction of 6 (Six) nos. RCC Bridge 1 (One) no. Sluice in Block PS-Sabang, Dist.-Paschim Medinipur.
Rehabilitation of RCC bridge at Ghera over existing stream at 14 th km of Churamon Itahar Kushmandi road under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Emeregent restoration of LB of Nowi Khal US of Ganganagar RCC Bridge for a length of 30m under Madhyamgram Municipality in PS_Madhyamgram District North 24Parganas Under U D D
Construction of RCC bridge over Palaboni Khal Near Kamala Kanta Mandals House Relacing the existing dilapidated wooded bridge Block Nandigram II P S Nandigram District Purba Medinipur 3rd Call
Sub-Soil investigation work of proposed RCC Bridge at 19.150 Km of Lower Bagjola Khal in place of Wooden Bridge within Block- Bhangar -II under Metropolitan Drainage Division No.I
Construction of wooden bridge over Keorapukur Khal near damaged RCC bridge at Bahiuddin at mouza and G.P-Mohanpur ,Block-Magrahat-II in district-South 24 Parganas under Canals Division.
Re excavation of Begore Khal from Biren Roy Road 0.00M to Sarkarpool RCC Bridge 3335.00M along with Bullah protection work at different stretches at Maheshtala Municipality, Dist.South 24 Parganas.
Protection work of right embankment of Lower Rampur Khal near Satpota RCC bridge a length of 45.0 M in G.P.-Jhamtia in Block-Amta-II, P.S.-Joypur, District - Howrah.
One time clearance removal of water hyacinth of Balighai Baromile Khal from Bhatda to Near Dubda Choumukh RCC Bridge within Block-Egra-I II ,PS-Egra, Dist-Purba Medinipur
DEVELOPMENT OF LIGHTING SYSTEM AT CANAL WEST ROAD FROM 37 / 1 / 1A, CANAL WEST ROAD (ULTODANGA CANAL WEST ROAD CROSSING, BESIDE OLD FOOT BRIDGE) TO 48, CANAL WEST ROAD (FRONT OF DN-18 BUS STAND) AT WARD NO. 12
Construction of foot Bridge along with Approoach road in convergence with BZP Own Fund and MGNREGA over river Dwarka near SONJ Village within Jhakadda Gram Panchayet under Mayureswar-I Panchayer Samityfor the year 2020-219( Paray Samadhan UID-BIR195)
Replacement of damaged wooden bridge with low cost foot bridge at Nawpara over Gurer khal GP Naskarpur PS Panchla Block Panchla Dist Howrah under Lower Damodar Construction Sub Division No IV of Lower Damodar Construction Division during the yea
Comprehensive maintenance Work to IBB Road from B.P. No 157/1-R to B.P. Np 175 MP in jurisdiction of BFD-VII, Murshidabad in West Bengal during 2021-23. SH:- Ordinary/ flood damage repair of main road, link road & feeder road, repair of culverts and ... and bridge repair & ...
Repairing of Wooden Bridges over Kalikakhali Khal at Ghatual, Block -Nandakumar under East Midnapore Division.
Construction of 2nos. of small bridges at Bangla Pool Gousa Molla Pool over Banai Khal
Repairing and Rehabilitation of Bridges at 3.50 Km and 7.90 Km of Luvpur Gunutia Road
SURVEY WORK FOR IDENTIFICATION OF BRIDGES UNDER RURAL CONNECTIVITY SCHEME FOR THE DISTRICT OF BIRBHUM
Estimates for carriageway and structural restoration work on all bridges at North Kolkata zone II
Construction of Permanent Protection Work of Existing Minor Bridge from Flood Water at 6.40 Km of Amta-Jhikira Road under Amta Highway Sub-Division of Howrah Highway Division in the district of Howrah, PWRD
Erecting and placing of Height Barrier at both side approaches of minor bridge over Sonai Khal Ch 2 40 KM on Madhusudan Banerjee Road under Kolkata North Division PWDte during the year 25 26
08PS 1. CC Road from PMGSY road to Bela Suswatha Kendra at Belda under Naipur GP 2. Construction of Bridge near Das Mahapatra Para at Belda under Naipur GP 3. Construction of Bridge near Das Para(Suti Khal) at Belda under Naipur GP .
Construction of Bridge at SWM project site in Chakpara under Bally Jagacha Panchayat Samity on Howrah Drainage 1
Construction of Bridge (Two Cell Box Culvert) connecting Telipara to Ashighar Main Road with both side approach Road)
Construction of bridge deck slab and pier at Alinagar on Suti River under Raipur G.P in Nowda Block
Repair of damaged concrete railing and painting of Punjabi Bridge Km 360 600 Gonpur Bridge Km 367 850 and Mollarpur ROB Km 373 600 including repair of pedestal at Pier no 4 24 27 of Mollarpur ROB along NH 60 New NH 14 under NHD XII Birbhum
Restoration of black top surface portion by bituminous work on Liluah ROB flyover in patches during the year 2025-26.
Construction of RCC Drain along the Right side of Burdwan-Kalna Link Road near ROB Approaches under Burdwan Division, P.W.D.
Re-construction of Abundment Wall aproch of Madhyamgram Rail Over Bridge (ROB) to chanelised Rain water properly under Madhyamgram Municipality.
Repair of Bridge at 11.27 km of Dahijuri Binpur Silda Hatiari Road Repair and Rehabilitation work under Jhargram Highway Division in the District of Jhargram.
Rehabilitation of Bridges and repairing of Approach roads of old and new Bridges at 9.50th Km of Daulatpur - Dehaband Road under Dakshin Dinajpur Highway Division in the district of Dakshin Dinajpur during the year of 2025-2026.
Balance Estimate for Replacement of 5 (Five) No. weak and narrow Bridges to Standard three lane carriageway bridges over different Khari (Tributaries) of river Tangon and on different km of Gazole-Bamongola Road under MHD.......(5th Call ).
General repairs, maintenance, painting, colour washing of service buildings, staff quarters, Gate lodges, horticulture, repairs and maintenance of bridges and FOBs under Senior Section Engineer/Works/Krishnanagar and other new minor works etc. in the jurisdiction of Assistant Engineer/Ranaghat. [15 lakhs for goods shed only][Zone No. 26, Period ending 30.06.2027]
Consultancy Services for Hydrological, topographical and Geotechnical survey including detailed design of culverts or bridges for design of the proposed fencing at GIN 58,59,63,64,65,66,71,72,73,74,75,76,78,79,80,81,82 and 83 (Total Length - 44.52 Km) at Murshidabad district West Bengal. SW: - Washing, mopping and cleaning etc. manually at BFD-VII, IBBZ-I, CPWD, Murshidabad during 2026-27.
Ordinary repair, Flood damage repair of Culverts, Painting of Bridge Panga-I, Kurum, and Panga-II Bridges etc. At various locations in the AOR of 93 BN between BP No. 750/13-S and 772/6-S along Indo Bangladesh Border in Jalpaiguri District of West Bengal Sector during the year 2024-25
Construction of a New Foot Bridge over River Punarbhaba to connect Nayabazar-Hat Khola Road and Fatak Para (Hat Khola Road as Link Road of Gangarampur-Tapan Road) under DDHD, in the District of Dakshin Dinajpur(2nd CALL) Project ID PD252634882S000
Soil investigation work for re-excavation of the Branch contai nala near Ranioara Foot Bridge (length-4.5 km), Dakshin Kancheswar khal (length- 4.0 km), Gova khal (length-3.0 km),Argoal drainage khal (length-17.0 km),Ghatua canal (length-2.5km)wit
Repairing walls with painting works related to outside walls at the entrance of Honble Judges gate near foot bridge at F gate and North West corner wall including repairing the damaged wall surface along with dismantling the false ceiling of Study
Engagement Agency for Construction Supervision and Consultancy providing assurance of checking verification of necessary appropriate testing including Documentation submission of reports for the fabrication steel structure for RCC bridge Madhubani
Soil Investigation work in connection with Construction of proposed RCC Bridge at Ch 15550 over Adiganga Channel in Shikharbali I GP under Block and PS Baruipu, Dist. South 24 Paraganas.
Clearing removing of water hyacinth for the period of June 2023 to 15 th November2023 From Munshirhat P.W.D R.C.C Bridge to RCC Bridge near Sovarani Collage of Kana Damodor River
CONSTRUCTION OF RCC BRIDGE OVER CANAL AT ROYPARA OF BAHADURPUR(ES) SANSAD UNDER RADHAPUR GRAM PANCHAYAT UNDER BHAGWANPUR II PANCHAYAT SAMITY DIST PURBA MEDINIPUR,JL NO 131 PLOT NO 4570
Restoration of Approach Road of a length of 475.0 Mtr to access Sluice Cum RCC Bridge at RRI campus, Haringhata under BARRACKPORE-I BLOCK, PS BIZPUR, DIST- NORTH 24 PARGANAS
Emargent re-construction of Damaged Wooden Bridge near Jhamtia RCC Bridge over Maja Damodar under Block - Amta-II, GP- Jamtia, under L.D.C.Sub Division No-I of Lower Damodar Construction Division.