Loading…
Loading…
2,654 results • Best match
Bagnan ROB At 0.3 Km of Bagnan-Srikol-Kamalpur Road Lighting on Bridge and Approach under Uluberia Highway Sub Division of Howrah Highway Division in the District of Howrah During the year 2025-26
Annual Maintenance of Desktop Computers, Photocopier, Printers and peripherals installed at office of The Chief engineer, PIU, ROB, and office of The Superintending Engineer, Mechanical Circle, and offices of The Executive Engineer, N.H. Planning .
Minor repairing Upkeeping and maintenance of carriageway of Bijan Setu Dhakuria Chaitanaya Mahaprabhu ROB and Karunamoyee Bridge under South Divn. RB Sector KMDA from dated 07/02/2026 to 31/12/2026 (328 Days)
Renovation of wooden bridges over Maja Damodar at Gumgar, Garbhabanipur Bazar, Debipur Duttapara, Hariharpur, Balichak, Ghola ,Dihibhursut Hanagora , Dihibhursut Kalitala , Sonatala Karatipara, Rajapur Bramanpara, Kumarchak, Block P.S. Udaynara
Installation of signage board to the Bridges ROBs and Roads under jurisdiction of Barrackpore Division PWD in the District of North 24 Pgs during the year 2023 24
Maintenance and repair to the two nos Steel Foot Bridges (Narkeldanga within Ward No. 28, KMC and Manicktala within Ward No.- 14, KMC) over Beliaghata Khal, District-Kolkata.
Construction of RCC bridges over Kalma Khal near confluence point of Kalma Khal and Jalangi river at Village Radhanagar GP Dhananjoypur within Block and PS Nakashipara District Nadia
Construction of RCC Bridges in place of dilapidated composite steel bridge over Churial Main khal at Ch. 8070.00 at Khanberia, Block -Thakurpukur Maheshtala,P.S.Maheshtala Dist- South 24 Parganas.
Repairing of Railing and Parapet of Bridges and Culverts of Bagdogra-Naxalbari Road in the dist of Darjeeling under North Bengal Construction Division, during the year 2023-24.
Repair of Super-structure of bridges at 15.55 km, 16.02 km, 17.75 km and 19.80 km of Mahananda Main Canal under Mahananda Canal Division in P.S.-Phansidewa, Darjeeling
Preparation of PPR, Survey, Drawing and Design for bridges under jurisdiction of WBSRDA, Barasat Division under RIDF/PMGSY/State fund for next one year from acceptance of tender.
At Sealdah - Construction of Water Treatment cum Recycling Plants of capacity 260 KLD at outlet no. 1 near platform no. 1A/1, 650 KLD outlet no. 2 & 3 near Beliaghata ROB ( Bridge no. S/2 ), 390 KLD at outlet no. 4 near RMS Parcel & cash Office and 300 KLD at outlet no. 5 near Circular canal ( Coal Depot area ) totalling 4 sets of total capacity 1.60 MLD including laying of necessary pipe lines for intake of raw water and discharge of treated water, Provision of valves.
At Sealdah - Construction of Water Treatment cum Recycling Plants of capacity 260 KLD at outlet no. 1 near platform no. 1A/1, 650 KLD outlet no. 2 & 3 near Beliaghata ROB ( Bridge no. S/2 ), 390 KLD at outlet no. 4 near RMS Parcel & cash Office and 300 KLD at outlet no. 5 near Circular canal ( Coal Depot area ) totalling 4 sets of total capacity 1.60 MLD including laying of necessary pipe lines for intake of raw water and discharge of treated water, Provision of valves.
Construction of Bridge over Nokari Khal at 0.75 Km of Ranaghat - Aranghata (Old) Road,in replacement of old bridge under Nadia Highway Division No-II in the district of Nadia.(2nd Call)
Diversion of Laying of Distribution Pipeline for Re-construction of Bridge by I and W Dept. at Chatimtala under Rajhat W/S Scheme under Chinsurah Sub Division Of Hooghly Division PHE Dte
MISCELLANEOUS CIVIL CONSTRUCTION WORKS STRUCTURAL FABRICATION ERECTION WORKS AND ALLIED JOBS FOR VARIOUS SCHEMES OF HALDIA REFINERY YEAR 2025. PART A DHDS OHCU FOB ETP AREAS. PART B LOB TPS GT BS-VI DYIP AND OTHER AREAS INCLUDING OFFSITE
Repair Works to Female Ward and allied works of Mekhliganj Sub-Correctional Home, under Teesta Bridge Construction Division P W D Mekhliganj during the year 2022 2023
Repairing of Immigration Road surfaces from CH 0.0 TO 1.0 KM under Teesta Bridge Construction Division, PWD, in the District of CoochBehar in the year 2025-26.
surfacing work of office Compound under Teesta Bridge Construction Sub Division-II,PWD,Haldibari in the district of Cooch Behar during the year 2024-25. (2nd Call)
Roof treatment and allied works of X-Ray Building of Mekhliganj Sub divisional Hospital, Mekhliganj under Teesta Bridge Construction Division, P.W.D., Mekhliganj during the year 2024-2025.
Dhaparhat B R K Bari Road Ch. from 0.0 kmp to 5.00 kmp Surfacing work under Teesta Bridge Construction Division, P.W.Dte. in the district of Cooch Behar.
Feasibility study and detailed project report for elimination of Level Crossings with Road Over Bridge at L-xing No. NJ/25(Km29/3-4) (NCBD-JDGP) & NN/104 (Km.164/5-6, SMTA-KAMG), NN/110 (Km.173/3-4, JOQ-SRPB) & SK/141 (Km.134/0- 1, HAS-KCF), SK/162 (Km.93/1-2, CRX-BNQ), SK/196(Km39/5-6, SVQ-BRQ), AB/1(Km.2/6-7, APDJ-APD), AB/3(Km.4/9-5/0, APDC-APD), AB/13(Km.14/1-2, APD- BSW), AB/22(Km.26/1-2, NCB-COB) AB/26(A) Km.30/0-1,COB-DWT), AB/32(Km.37/5-6,DWT-VTG)and L-xing No. AB/47(Km.49/5-6, VTG-DHH), (Total 13 Nos.) under the jurisdiction of ADEN/II/NCB, ADEN/East/APDJ, ADEN/West/APDJ, ADEN/MBZ & ADEN/HQ/APDJ of APDJ Division.
Routine maintenance of DANKUNI ROB over Howrah Bardhaman Chord Line at Dankuni, of Dist. Hooghly of Serampore Bridge Highway Sub-Divn. under Hooghly Highway Division No.-II, P.W. (Roads) Directorate during the year 2024-25
Emergent Dismantling of superstructure substructure comprising deckslab and other ancillary components above pilecap ofdistressed Tallah ROB falling with in the boundary of Eastern Railway with Jaw Crusher and other machineries during the year 19-20
Emergent repair to Baruipur ROB including approaches from Nazrul Sarani to Hospital side in patches with Bituminous profile corrective course and Mastic Asphalt wearing course during the year 2022-2023 under Baruipur Sub-Division, PWD.
Minor repairing, Upkeeping and maintenance of carriageway of Sonarpur ROB, Kamalgazi Flyover and Service Road under Kamalgazi Flyover under South Division, Rand B Sector, KMDA for a period from dated 11.02.2025 to 31.12.2026 324 Days.
Repairing work of Dankuni ROB Service Road fom 0.00 km to 0.500 km under Serampore Bridge Highway Sub-Division of Hooghly Highway Division No-II in the Distrct of Hooghly during the year 2026-27.
Providing Still photography and Videography services at different stages during progress of work and making documentaries for the Bridge work over river Khulnai at 16.90 Km of Odlabari to Kranti road.
Repair of damaged parapet wall of Minor Bridge and Culverts at Ch 56 665 Km 62 180 Km 69 655 Km 71 910 km and 73 260 km and extension of Hume Pipe with slab culvert at Ch 63 774Km 65 605 Km 72 770 Km of NH 114 under Bolpur NH Sub Division
Manufacture and supply of Wider Pre-Stressed Concrete Sleepers for 25T Axle load for B.G. 60kg (UIC)/60 E1/52kg Running rails with 60kg (UIC)/60E1/52kg Guard rail for use on ballasted deck bridges as per RDSO Drg. No. T-8970, Alt-01/ latest alteration and to IRS Specifications No.T-39 (6th Revision-March-2021) and Indian Railway Standard Conditions of Contract, both as amended upto actual tender opening date, duly loaded in Wagon/Road vehicle.
General repairs, maintenance, painting, colour washing of service buildings, staff quarters, Gate lodges, repairs and maintenance of bridges and FOBs under Senior Section Engineer [Works]/ Naihati [ from km 23/7 to 70/11] and and maintenance of new M/C shed and RPF Training Centre, RPF Barrack and other new minor works etc. in the jurisdiction of Senior Section Engineer [Works]/Naihati [from Km 23/7 to 70/11] under Assistant Engineer/ Kanchrapara [Zone No. 02, period ending 30.06.2027].
General repairs, maintenance, painting, colour washing of service buildings, staff quarters, Gate lodges, repairs and maintenance of bridges and FOBs under Senior Section Engineer [Works]/ Naihati [ from km 23/7 to 70/11] and and maintenance of new M/C shed and RPF Training Centre, RPF Barrack and other new minor works etc. in the jurisdiction of Senior Section Engineer [Works]/Naihati [from Km 23/7 to 70/11] under Assistant Engineer/ Kanchrapara [Zone No. 02, period ending 30.06.2027].
Maintenance and repairing of wooden bridges up to 15th November2023 over Maja Damodar at Hariharpur, Balichak, Shibpur, Rajapur Bramanpara, Dakshin Singty, Debipur Kamarpara, Garbhabanipur Bazar, in Block P.S. - Udaynarayanpur
INSTALLATION OF FENCING OVER THE BRIDGES ACROSS TOLLY S NULLAH TO STOP THROWING OF GARBAGE INTO THE NULLAH ON THE KHIDIRPUR DOI GHAT BRIDGE (COMPRISING OF 01 NO. BRIDGE)
Rehabilitation of distressed Bridges at 16.680 KM and 20.395 KM and Head regulator of Dy-2 and Dy-10 of TMLC with in Block and P.S - Rajganj, District- Jalpaiguri.
Yearly routine maintenance of various Bridges with approaches and removal of plants, unserviceable soil dust on bridge deck slab under Bongaon Sub- Division, PWD during the year 2023-24
Supplying of unskilled mazdoor labour for patrolling and watching of river embankment canal canal bank canal hydraulic structures bridges under Champadanga Irrigation Sub Division of Lower Damodar Irrigation Division.
Supplying unskilled mazdoor labour for Patrolling and Watching of N1B and N1 canal canal bank canal hydraulic structures bridges under Jamalpur Irrigation Sub Division of Lower Damodar Irrigation Division.
Soil investigation work for the proposed re-construction of Bridge at Ch. 390,00 over Dy-4 of Kopai South Main Canal under Kirnahar Irrigation Sub-Division of Mayurakshi South Canals Division, Bolpur, Birbhum.
Engagement of an Independent Inspecting and Monitoring Agency ......Construction of Bridge over river Dwaraka at 21.454 Km of Berhampore-Kandi-Sultanpur Road, replacing existing old and narrow bridge, under Murshidabad Highway Division No.II
Repairing Works in different stretches over damaged roadway surfaces and hard shoulder of Bagdogra Fulkadabri Road under Teesta Bridge Construction Division , P.W.D., Mekhliganj during the year 2024 - 2025
Repairing of Jhurirhat - Boalmari Road surfaces from CH 0.0 TO 3.50 KM , under Teesta Bridge Construction Division, PWD, in the District of CoochBehar in the year 2025-26.
Renovation work by Surfacing of Sarundi Bridge Firingihat Road from Ch. 0.00 kmp to 7.10 Kmp under Teesta Bridge Construction Diviasion, PWD in the District of Cooch Behar.
Construction of Composite Bridge over River Saniajan at Kangratali on Immigration Road at Mekhliganj under Teesta Bridge Construction Division, P.W.D., Mekhliganj In the District of Coochbehar. (2nd Call)
Construction of service road and allied R.C.C. Drain on both side of ROB at the northern side of Railway line (Near Municipal office Building) including dismantling of old Drain at ward no-07, within Jhargram Municipality
Minor repairing, Upkeeping and maintenance of carriageway of Sonarpur ROB, Kamalgazi Flyover and Service Road under Kamalgazi Flyover under South Divn., R B Sector, KMDA for a period from dated 19.01.2025 to 31.12.2025 i.e ( 347) days.
Emergent spl restoration of Belgharia side approach and attached portion of Birati ROB damaged due to prolonged water stagnation during heavy and incessant rainfall of 2025 and emergent restoration of other locations damaged due to unauthorized
Bhagirathi Bridge at Jangipur and ROB at Miapur - Carriageway-Patch Repair ( Bituminous Potholes, 20 mm P.C. and seal coat in stretches) under Raghunathganj Highway Sub-Division of Murshidabad Highway Division No.I in the district of Murshidabad
Minor repairing, Upkeeping and maintenance of carriageway of Derozio / Durgapur ROB, Samprity Flyover and Shoni Mondir Bridge over Keorapukur Khal under South Divn. RB Sector, KMDA for a period from dated 01.04.2026 to 31.03.2027 (365 Days).
RHM25R2087 2810952072, 2810952252, 2815990783, 2810210052, 2810952292, 2810952302, 2810952312, Dimantl and Install of Condn coil DHDS, Dimantl and Install of Condn coil TPS, Dimantl and Install of Condn coil FOB, Dimantl and Install of Condn coil ... coil FOB , ...