Loading…
Loading…
2,654 results • Best match
IDENTIFICATION OF BRIDGES UNDER RURAL CONNECTIVITY SCHEME Brigges under Bankura-I, Bankura-II, Barjora, Chhatna, Gangajal Ghati, Mejhia, Saltora Indpur, Khatra, Hirbandh, Ranibandh Blocks under jurisdiction of WBSRDA Bankura Division
Installation of Signage Board to the Bridges, ROBs and Roads at Lodhasuli - Daijhuri - Kupannad Road (21.00Kmp to 39.00Kmp) and Others Roads under Jhargram Sub-Division in the district of Jhargram.
Installation of Retro-Refletorised Sign Board at different bridges under Burdwan North Highway Division, P.W. (Roads) Directorate in the dist of Purba Bardhaman during the year 2023-24.(2nd Call)
Rehabilitation work of RCC Bridges over river Khari at 7.396km. and 7.792km. Bhatar Samati Road , under Burdwan North Highway Division , P.W.(Roads) Directt. in the dist of Purba Bardhaman_2ND CALL
Special repair to the two nos R.C.C Bridges located at Kudghat and Shantinagar over Tolly s Nullah within ward no-114 , 97 of K.M.C under Metropolitan Drainage Division No-II.
2(Two) Bridges at 2.00 kmp and 10.00 kmp of Bodra-Kalikatala Road, Rehabilitation work under South 24 Pgs. Highway Division in the Dist. of South 24 Parganas.(SL-01)
INSTALLATION OF FENCING OVER THE BRIDGES ACROSS TOLLY S NULLAH TO STOP THROWING OF GARBAGE INTO THE NULLAH IN BETWEEN TOLLYGUNGE BRIDGE TO CHETLA BRIDGE (COMPRISING OF 03 NO. BRIDGE)
Construction of 02 two no. RCC Bridges at Villages Baliyapur Panipia, Biswanathpur Badalpur, Block Contai I and P.S. Contai, Junput Coastal, Dist. Purba Medinipur under Contai Irrigation Division. 2nd call
INSTALLATION OF FENCING OVER THE BRIDGES ACROSS TOLLY S NULLAH TO STOP THROWING OF GARBAGE INTO THE NULLAH ON THE GARIA BRIDGE AND KAMDAHARI BRIDGE (COMPRISING OF 02 NO. BRIDGE)
Carrying out Inspection of structural steel work during Fabrication _Erection, conducting Destructive Non-Destructive test and submission of necessary certificate in connection with bridges at Chainage 3.882KM_Kana River, 5.635KM_Dakatia River
Repairing and rehabilitation of Bridges situated at CH 3.05 KM, 6.90 KM, 9.20 KM and 14.486 KM of Gangajalghati Saltora Road under Bankura Highway Division in the District of Bankura
Minor repair of Piers of Bridges at 12.32 km 13.84 km 15.55 km 16.02km 17.75 km and 19.80 km. of MMC in P.S. Phansidewa Dist. Darjeeling under Mahananda Canal Division
Soil investigation for Sonadhara Ranikote maintenance and repairing at Boro Banka irrigationT Sonadhara ,Mouza- Nabasta Ii , Block-Burdwan-II,Dist.- Purba Bardhaman and Soil investigation for construction of bridge over irrigation channel at samanti
Construction of Connecting Road to Children Park and Construction of Boundary Wall of Block Administration in connection with Construction of Bridge Over Damodar Main Irrigation Canal at Galsi, in the district of East Burdwan
EXPRESSIONS OF INTEREST (EOI) FOR THE ENGAGEMENT OF A BRIDGE CONSULTANT TO PREPARE A DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF BRIDGE OVER DAWAI KHOLA, TODEY TANGTA, GORUBATHAN BLOCK, WITHIN KALIMPONG DISTRICT, G.T.A.
Emergent Repair and Renovation work of DMDC Chamber and setting up new toilet in existing building at SDO Office Mekhliganj under Teesta Bridge Construction Division, P.W.D., Mekhliganj, Cooch Behar.
Clearing the office Compound and painting work of Office Building of Teesta Bridge Construction Division and Sub-Division office, Under Teesta Bridge Constructon Division in the year 2024-25.
Surfacing and Protection work of Bhawlaganj Road from Ch. 0.00 kmp to 3.220 kmp under Teesta Bridge Construction Division, PWD, in the district of Cooch Behar. Project ID - PD232408657S000.
Repairing work of Haldibari Jalpaiguri Road in different stretches from Ch. 20.50 Kmp to ch. 23.00 Kmp under Teesta Bridge Construction Division PWD Mekhliganj During the year 2020 2021
Clearing and removing of water hyacinth from SAMD Part II main khal in between Ramdhari RCC Bridge to Daria wooden bridge for a length of 3200 m and branch channel F G H of SAMD Part II main khal for a total chainage of 110 of Block and PS Ba
O and M to the inlet at Singherveri on L/B, Baburveri,Jompukur on R/B over river julkia and inlet at the U/S and D/S of Dank RCC Bridge on the R/B of Dingabhanga Khal under beraberi and Chandanpur GP within block Singur and Haripal Dist. Hooghly.
Repairing of potholes and depression work at Baidyabati-Tarakeswar-Champadanga Road attached to ROB under Hooghly Construction Sub-Division No.-III under Hooghly Construction Division, PWD in the district of hooghlt during the year 2020-2021. PartA
Detailed Scheme for dismantling/demolition of existing ROB with special emphasis on Railway portion for submission to ER, Authority for approval and Detailed Project Report for reconstruction of Chitpur Road Bridge over Railway Track after the demoli
Maintenance and Repairing of potholes ,depressions, in different stretches over the service road attached to the Nalikul ROB on B.T.C Road(S.H-2) under Hooghly Construction Sub Division-III of Hooghly Construction Division,P.W.D of 2020-21
Supplying Labour for Sweeping, Cleaning of Baruipur ROB (including Approaches and Adjacent Elephant Park and Horse Park) for 261 days ( from the date of issue of Work Order) R and B Work during the year 2024-2025.
Maintenance and Repairing of potholes ,depressions, in different stretches over the service road attached to the Nalikul ROB on B.T.C Road(S.H-2) under Hooghly Construction Sub Division-III of Hooghly Construction Division,P.W.D of 2020-21
Minor repairing, uprooting of trees, Sweeping and Cleaning and maintenance of carriageway of Bijan Setu, Dhakuria / Chaitanaya Mahaprabhu ROB and Karunamoyee Bridge under South Divn., R AND B Sector, KMDA for a period of 01 (One) Year.
Emergent Repair to Baruipur ROB Approaches (Kolkata Side) from 0.10 km to 1.50 km in different stretches, under South 24-Parganas Division, PWD in the district of South 24-Parganas-during the year 2025- 2026.(2nd call)
Providing low height boundary wall with railing around site Govt. land and beautification of the same with upgradation of adjacent footpath Dr Deodar Rahaman road from State Music Academy to ROB building Tollygunge of Tollygunge Sub-Division
Repairing of potholes and depression work at Baidyabati-Tarakeswar-Champadanga Road attached to ROB under Hooghly Construction Sub-Division No.-III under Hooghly Construction Division, PWD in the district of hooghlt during the year 2020-2021. PartB
Group maintenance of Civil and Electrical works for all items (as per the requirement) under Govt. of West Bengal PWD schedule of rate for Buildings Works (Volume-I), Sanitary Plumbing Works(Volume- II), Electrical Works and Road and Bridge Works etc
Emergent rain damage Slope Restoration work of RUB Approach Road of Sonapur-Pundibari Road Stretch at 8.50 KMP chainage due to huge raincut under sloped embankment portion under Cooch Behar Highway Division in the District of Cooch Behar.
Construction of 03 thre) no. RCC Bridges at 0.47 Km, 1.41 Km and 1.85 Km of Moyna Newcut Channel in Block and P.S Moyna, District Purba Medinipur under East Midnapore Division.
M/R of 6 nos. wooden bridges at G.P.- Mather Dighi, Jogendranagar, Kalikatola and Deuli-l under Canning-Il Block, P.S.- Jibontala, under Canning Irrigation Sub- Division of Joynagar Irrigation Division.
Construction of 2 two no. R.C.C. Bridges at Villages Panichiara Bhaitgarh near Annapurna Rice mill, Sukunia, Block Contai III, and P.S. Marishda, Dist. Purba Medinipur under Contai Irrigation Division. 2nd call
Renovation of damaged wooden bridges over Kamarnala Khal at Badampur Near Bridge No 2 in G P Bhagabatipur Block Chanditala I Dist Hooghly under Lower Damodar Construction Sub Division No IV
Construction of RCC bridges over drainage channel near C.D structures at ch.923.35, ch 943.35 of Kopai South Main Canal (Total 2 Nos.) within Block and P.S.- Bolpur- Sriniketan, Dist- Birbhum.
INSTALLATION OF FENCING OVER THE BRIDGES ACROSS TOLLY S NULLAH TO STOP THROWING OF GARBAGE INTO THE NULLAH IN BETWEEN NARKEL BAGAN BRIDGE TO RATHTALA BRIDGE (COMPRISING OF 03 NO. BRIDGE)
Rehabilitation of various Joist Pile Bridges at 1st km of Connecting road from 4.50 km of Coochbehar - Baneswar - Alipurduar Road (Gopalpur Bazar) to 8.00 kmp of Pundibari - Baneswar Road (Chagolber Bazar)
INSTALLATION OF FENCING OVER THE BRIDGES ACROSS TOLLY S NULLAH TO STOP THROWING OF GARBAGE INTO THE NULLAH ON THE KUDGHAT BRIDGE AND RISHI ASHRAM BRIDGE (COMPRISING OF 02 NO. BRIDGE)
INSTALLATION OF FENCING OVER THE BRIDGES ACROSS TOLLY S NULLAH TO STOP THROWING OF GARBAGE INTO THE NULLAH ON THE IRRIGATION BRIDGE NEAR SATI MAYER GHAT (COMPRISING OF 01 NO. BRIDGE)
Soil Investigation work for proposed construction of R.C.C Bridges at Madhabpur and Hamarjita over Kudi Khal and K.D.C, G.P.- Barida and Jerthan in Block-Egra-I, P.S.-Egra, Dist-Purba Medinipur
Repairing of existing wooden Bridges near Madurdaha over DD1 East branch channel at 2050.00 M within the ward no. 108 of KMC, P.S- Anandapur during the year 2026-27. (3rd Call)
Biennial Rate Contract BRC for transportation of Portable Steel Bridges and Bridge materials by Road from GRSE Ltd, DEP-Ranchi to various destinations in India, Nepal and Bhutan and vice-versa.
Soil investigation in connection with construction of bridge over Kamakhya Khal under Damodar Canal Division at Village-Chandipur, G.P.-Mertala, Block- Purbasthali-II. Purba Bardhaman. (IW/SI-94/2025-26), Project ID- IW2526343055000 (3rd Call)
Soil exploration for proposed construction of bridge over a Bapuli Canal (maintained by the I and W Dept) for a length of 20.00 m at Mouza -Tentulberia , G.P.- Debipur, Block - Mathurapur - I South 24 Parganas.
"Ranchi Adra Division"- Conversion of existing bridges into Composite girders/Ballasted decks for running of 25T Axle loaded freight trains @ 100Kmph in (a) Bridge no. 398 (3x18.3m) of ORGA-HATIA section (b) Bridge no. 378 DN (4x18.3m) of Hatia-Muri section (c) Bridge no. 83DN (3x18.3m), 89DN (1x18.3m) and 98DN (2x18.3m) of BKSC-KSX section (d) Bridge no. 19 (2x6.10m+5x18.3m) and 31 (1x18.3m) of TLE-BKSC section (e) Bridge No. 403 UP (2x6.10m+2x12.2m+1x18.3m) of ADRA - GMO section."
Consultancy services for hydrological investigation, topographical surveying, and geo- technical investigation of sites including submitting detailed architectural and structural drawing of all cross drainage structures like (Culvert and bridges) with detailed project report (DPR) and detailed estimate duly vetted from IIT/NIT or any other Govt. Engineering college along GIN 58, 59,63, 64, 65, 66, 71, 72, 73, 74, 75, 76, 78, 79, 80, 81, 82 and 83 (Total Length 44.52 Km) at Murshidabad district, West Bengal. Subwork/Packages: Same as Name of Work
Emergent patch repair works to Sarunadi Bridge Firingihat Road portion from 0.00 Kmp to 6.00 Kmp under Teesta Bridge Construction Division PWD, Mekhliganj Cooch Behar During the year 2020 2021
Repairing of Bhowlaganj Road surfaces from CH 0.0 TO 3.220 KM Incl. Allied works, under Teesta Bridge Construction Division, PWD, in the District of CoochBehar in the year 2025-26.