Loading…
Loading…
897 results • Best match
Construction of RCC culvert at No. 2 Fakriguri, under 15th Finance for the year 2022-23 during 2023-24
REPAIR TO DRAIN PATH CULVERT HARDSTANDING FENCING COMPOUND WALL ETC AT TAMULPUR AND DARRANGA MIL STN UNDER GE RANGIA
SPECIAL REPAIR TO CERTAIN ROADS DRAINS AND CULVERT AT SAGAT SINGH ENCLAVE AT DINJAN MIL STN UNDER GE DINJAN
REPAIR OF FOOT PATH, HARDSTANDING, CULVERT AND OTHER RELATED MISC WORKS ETC AT MASIMPUR MIL STATION UNDER GE SILCHAR
REPAIR OF FOOT PATH, HARDSTANDING, CULVERT AND OTHER RELATED MISC WORKS ETC AT MASIMPUR MIL STATION UNDER GE SILCHAR
SPL REPAIR TO DRAIN, CULVERT, FENCING, PATHWAY AND EXTERNAL LIGHTS OF MES INSTLN AT NAA UNDER GE (N) TEZPUR
Construction of road from Panimajkuchi Chowk to Mini Culvert of Panimajkuchi village in Nalbari District (Length-1.440 KM)
Improvement of Branch Canal 3 from Ch.3270.00M to Ch.3990.00M of Kaldiya FIS and Improvement of Branch Canal 4 from Ch.0.00M to Ch.1410.00M of Kaldiya FIS and Construction of Box Culvert at Ch 3320.00 m of Branch canal-3 of Kaldiya FIS
Improvement of road from Srirampur-Jaraguri PWD road to Gokulkata Bridge via No.2 Dawaguri village in State Govt. Goodwill Project SOPD (G) for the year 2020-21 (Providing E/W in widening, GSB, WBM-III, ICBP including 1 Nos. of RCC Box Culvert.
Construction of a Single Cell Box Culvert on Tihu Feeder Road at Chainage 1.350 km Under Contingency Fund for the work Construction of ROB for Replacement of Railway LC Gate No. SK-26 at RLY KM 326.0-1 at Tihu Town in Nalbari District, Assam
DPRD/BTC/(6th ASFC)-322/2025/16
DPRD/BTC/(15th FC)UT(VIII)Udl-07/2025/10
Construction of Box cell Culvert at Durgapur Bhangrikuchi Tiniali link road under Nikashi VCDC (Durgapur and Daragaon link road over Dirring River) for the year 2022-23.
Box Cell Culvert including Approaches at Nonoi Dakhinpat Road under Mukhya Mantrir Pakipath Nirman Achani for the year 2023-24
SRE_CHI_20_21_01 Construction of Road for Border Out Post under 15th Bn. SSB, Kajalgaon connecting road from Koilamoila BOP to Medinipur BOP in Chirang District ,BTAD (Construction including E/W, GSB, and HP culverts works).
WELCOME MAINT TO OMQS, SMQS AND SLA AND REPAIR/ MAINT/ MISC REPAIRS TO FOOTPATH, HARD STANDING, DRAINS, CULVERTS, COMPOUND WALL/ SECURITY WALL, FENCING AND ALLIED WORKS AT AF STN DINJAN UNDER GE (AF) MOHANBARI
SRE_CHI_20_21_03 Construction of Road for Border Out Post under 15th Bn. SSB, Kajalgaon connecting road from Dhoula BOP to Bishnupur BOP in Chirang District ,BTAD (Construction including E/W, GSB, and HP culverts works) .
SRE_CHI_20_21_04 Construction of Road for Border Out Post under 15th Bn. SSB, Kajalgaon connecting road from Koilamoila Bazar to Koilamoila BOP in Chirang District ,BTAD (Construction including E/W, GSB, and HP culverts works).
DPRD/BTC/15th FC/UT(VIII)/Udl-02/2025/10
REPAIR TO DRAIN PATH CULVERT AND OTHER MISC WORKS AT DOMESTIC AREA AT AF STN KUMBHIRGRAM UNDER AGE I KUMBHIRGRAM
Improvement of BBCA Mission Road with Culvert at Tukrajhar under 15th Finance for the year 2022-23 during 2023-24
REPAIR TO DRAIN PATH HARD STANDING, CULVERT AND CERTAIN MISC B/R REPAIR IN TECH AREA UNDER GE (AF) CHABUA
REPAIRS TO DRAIN, PATH, CULVERT, HARDSTANDING, FENCING, COMPOUND WALL AND OTHER CONNECTED ITEMS AT RANGIA MILITARY STATION UNDER GE RANGIA
REPAIR TO AREA DRAINAGE, PATH, CULVERT, FENCING, COMPOUND WALL, HARD STANDING AT CERTAIN LOCATION IN NAA UNDER GE (N) TEZPUR
Construction of Internal Roads and Construction of RCC Drainage and Culvert at Industrial Estate at Nathkuchi, Tihu, Dist Nalbari, Assam
REPAIR TO STORM WATER DRAINS WALLS CULVERT AND STEEL GATE ETC AT AF STN KUMBHIRGRAM UNDER AGE I AF KUMBHIRGRAM
Construction of 3x 3.00m x 3.00m Box Cell Culvert on Laokhowa Ali under SOPD-G for the year 2025-26
Recovery and Reconstruction of Baganpara Nayabasti Road (culvert at Ch 3100.00) under NDRF (PDNA-2022) for the year 2025-26TN_386_5
(1) Re-construction of Chowkhamting - Nalinipam via Mechu (pkgno AS 04 62) and RCC Box culvert at Bamgaon to Gohain gaon road , (2) Re-construction of LalungTiniali to Kerekoniroad(Pkg No AS-04-46) under SOPD-G for the year 2025-26 under Jonai TRD, 7
MAINT/SOPD-G/2025-26/133 1_Construction of 2 cell 2x2 Box Culvert and repairing of Road from Gossaidubi Bazar to Dharal Bazar (from Ch 990.00 m to Ch 1140.00 m), 2_ Improvement of GWC road from Uttar Shaldhowa Road to Pachim Shaldowa Road, 3_ Improv
DPRD/BTC/(15th FC)UT/V/Udl-03/2024/07
REPAIRS TO DRAINS, COMPOUND WALLS, FENCING AND REPAIRS/ CLEANING OF SEWAGE LINES, MANHOLES, SOAKAGE WELLS AND SEPTIC TANKS AND REPAIRS TO PATHS, HARDSTANDING, CULVERTS AND MISC WORKS AT LIKABALI MIL STN UNDER GE 872 EWS
REPAIRS TO DRAINS, COMPOUND WALLS, FENCING AND CLEANING/ REPAIRS TO SEWAGE LINES, MANHOLES, SOAKAGE WELLS AND SEPTIC TANKS AND REPAIRS TO PATHS, HARDSTANDING, CULVERTS AND MISC WORKS AT LIKABALI MIL STN UNDER GE 872 EWS
Carrying out online health assessment of Offsite piping under culverts, tank dykes, road crossings, underground piping and un-approachable critical piping in process units by Guided Wave Long range Ultrasonic Testing (LRUT) at Guwahati Refinery.
NRL_PHASE_1_23_24_01 Widening and strengthening of road from Pragati Dwar to Assam Bio Refinery Pvt. Ltd. including culverts and drains along with uprooting, site grading of 50 Bighas of land acquired by Numaligarh under Sarupathar TRD
SRE_CHI_20_21_02 Construction of Road for Border Out Post under 15th Bn. SSB, Kajalgaon connecting road from Medinipur BOP to Janata Bazar BOP in Chirang District ,BTAD (Construction including E/W, GSB, and HP culverts works) .
SRE_CHI_20_21_05 Construction of Road for Border Out Post under 15th Bn. SSB, Kajalgaon connecting road from Dhoula BOP to No.1 Sikajhora in Chirang District ,BTAD (Construction including E/W, GSB, and HP culverts works)
DPRD/BTC(15th FC)UT/VI/Udl-61/2024/8
Construction of Box-cell culvert at Martyr Laxman Ramchiary Memorial road under Infrastructure Dev. Bund for the year 2023-24. TN_90_19
REPAIR TO PLASTERING BRICK WORK AND PERIODICAL SERVICES TO BOUNDARY WALL CULVERT AT NORTH SOUTH OF RAILWAY LINE UNDER GE MISAMARI
Construction of Internal Road, RCC Drain, RCC Culvert and Car parking for Agar International Trade Centre at Dabidubi, Golaghat District, Assam
REPAIR AND MAINTENANCE OF HARDSTANDING, AREA DRAINAGE, CULVERT, FOOTPATH, FENCING AND DUST BINS AT AFS STN MOHANBARI UNDER GE (AF) MOHANBARI.
Construction of Approach Road with Box Cell Culvert on Saudarvita Bagrirtary Road (Bhabanipur Road) under SOPD for the year 2018-19.
Construction of RCC culvert at Gubinjan to Tamarchuk Bridge to Major Chapori Road under SOPD-G for the year 2025-26.
Construction of Godown at Kalaigaon ICDS Project also and approach culvert, Kalaigaon in Udalguri District for the financial year 2021-22
Construction of RCC Bridge and Culvert on the road from North Gongia Dhwnguri village main road Phase-I. TN No.130_07
PERIODICAL TO PLASTERING BRICK WORK AND PERODICAL SERVICES TO BOUNDARY WALL CULVERT AT NORTH SOUTH OF RAILWAY LINE UNDER GE MISAMARI
NRL_PHASE_II_23_24_02 Widening and strengthening of road from Pragati Dwar to Assam Bio Refinery Pvt. Ltd. including culverts and drains along with uprooting, site grading of 50 Bighas of land acquired by Numaligarh under Sarupathar Territorial Road
REPAIR/MAINT AND CLEANING OF SEWAGE LINE, SEPTIC TANK, SOAK WELLS, MANHOLES, DRAINAGE SYSTEM, SWTs AND REPAIR/MAINT OF SECURITY WALLS, FENCING, CONCERTINA COIL, SWTS, CULVERTS AND OTHER INFRA OF TECH AREA AT AF STN DIGARU.
DPRD/BTC/(15th FC)UT/V/Udl-04/2024/07