Loading…
Loading…
1,214 results • Best match
C/O Head weir, intake cum filter box, manifold distributor ,RCC chamber with locking arrangement, Runoff, spillover channel, Rain water harvesting structure site development, square wire mesh fencing, rain water harvesting tank of 2035000 ltr cap 2
Day to day cleaning of Intake trench weir trash rack forebay trash rack and regulation of all gates under the supervision of regular HPSEBL staff time to time around the clock during rainy season Khauli Power House
Source Strengthening WSS Sadarpur Thanpuri Rajiana and WSS Jandrah JJM SH Drilling lowering of assembly Tube well Construction of Trench weir WTP Construction of various UG Reservoir Construction of Pump House Supply and errection of pumping mac
Preparation of detailed project report etc
C/O Gabion structure in wire crate, C/O open well cum pump house and attendant Qtr, C/o 30 Nos anchor block, C/o boundary wall around the pump house, C/O Retaining wall for protection of pump house and C/O RCC MDT 2 Nos) under NABARAD
Laying and jointing of HDPE pipes in distribution system) under NABARD
SH Providing and laying renewal coat by providing 30mm thick Bituminous concrete in Km0/0 to Km4/0 along with road marking
SH- C/O Head weir ,C/O Desilting Tank ,Provision for Site development , P/L G.I /HDPE pipe in Main and Distribution network , C/O Delivery tank 5000 ltrs , C/O 20 Nos Out let Chamber Phase 2nd
CO RCC Trench Weir, CO Desilting tank , CO water treatment plant of 2.12 MLD capacity consisting Raw water tank, Pre settling tank, inlet chamber channel, Alum solution tank,Mixing channel, Flocculator, Settling tank, Rapid sand gravity Air blower
C/O Head weir, intake cum filter box, manifold distributor ,RCC chamber with locking arrangement, Runoff, spillover channel, Rain water harvesting structure site development, square wire mesh fencing, rain water harvesting tank of 572000 ltr cap in G
Cleaning and clearing of Trench weir trash rack intake channel for maintaining and diversion of regular inflow including operation of Hydro mechanical installations ie regular flushing of hopper NO 1 2 3 at intake site of Thirot HEP
Supply, Installation Calibration of Sensor Encoder with digital display for Gate Position Indicating System of Radial Gate no. 1 , 3 at Dam of Chamera II Power Station.
Development of Ropeway between Chandigarh Manali National Highway near Pandoh Dam Reservoir and Mata Baglamukhi Temple (Bakhli) District Mandi in Himachal Pradesh on EPC mode CEN Standard
Construction of Coffer Dam and Hiring of Hydraulic Excavator for Diversion of water and Construction of RCC Shaddle Block from RD 105 to RD 140 at Riyagri
R M of Civil Components of Barrage site of 3x42 MW Larji HEP for the year 2025 26 Sub Head Providing a team crew for removing sand silt slush etc from Stoplog gate grooves of Radial Gate No 5 at Larji HEP
RM of Hydro Mechanical installation of different component of 3 42MW Larji Hydro Electric Project for the year 2026 27 Sub Head Hiring of tractor for transportation disposal of all type of trashes dead animals etc from Barrage site of Larji HEP
C o source intake with trench weir system, Providing installation of pre fabricated water treatment plant C o Storage tank Providing, laying Jointing of HDPE pipe for Raw Water Main Pure gravity main Distribution system house hold connection Sur
SH CO head weir CO Intake chamber Co Sedimantation tank Co filter bed CO storage tank 25000 litres capcity laying and jointing of the GI pipes of various dia CO PCC Rwall CO barbed wire fencing and providing FHTCs
SH Construction of Head weir Construction of Sum Well 151200 liters capacity Construction of Pump house cum attendant quarter 48 sqm Construction of RCC Main storage tank 151200 litrs Capacity providing fencing around the pump house and storage tank
Excavation, Construction of Trench weir, Desilting Tank cum Clear water tank, Water Treatment Plant 0.82MLD, Sump Well cum Storage Tank of 300000 litre capacity at Node No. 2,3,4,5, 100000 litre capacity at Node 2,2,3,6, sector storage tank 25000 Lit
Site development and protection works, Construction of Head Weir, Nallah Intake, Sedimentation Tank 37400 Ltr., RCC Storage tank 10000 Ltr. 2 Nos , RCC Storage Tank 14000Ltr, RCC Storage tank 16500 Ltr, Slow Sand filter bed 93.48 Sqm and provision
Dewatering and Hiring of Hydraulic Excavator 210 TATA Hitechi or its equivalent 1.00/1.35 Cum capacity for removal of mucks and other debries near Riyagri Source Intake including Transportation Charges and testing of Trash Rack over Trench weir and
Providing and laying Interlocking Paver Block at RD 0/410 to 0/470, 0/670 to 0/735,1/0 to 1/030 and Construction of U-Shape Drain at RD 0/250 to 0/280 )
Repair of pot holes and patches in RD 45/500 to 53/00)
Providing Hydraulic Excavator Chain mounted for removal of muck debris etc accumulated in downstream of stilling basin of larji Dam and diversion of pondage water of river Beas
R M f Hydro Mechanical Installations and other related civil works of Beeling MHEP for the year 2025 26 Sub Head Clearing and cleaning of trench weir trash racks intake channel for maintaining and diversion of regular inflow including operation
SH_ Construction of intake weir, Water Treatment Plant 0.60 MLD, Over head storage tank of 135000 liter capacity, 56000 liters capacity, 61000 liter capacity and 40000 liters capacity of 10 meter staging height, Under Ground storage tank of 55000 lit
C/O 1 No trench weir intake chamber 1 No, WTP 1.40 MLD, C/O RCC Main Storage tank 1 No, Sub storage tank 6 Nos, Over Head Tank 4 Nos Laying, jointing and testing of Gravity main and Distribution system.
(SH- C/O Head weir , Intake structure , Filter bed 162 Sqm . Pump house , Sump well 64500 ltrs , CWT 128500 ltrs,, Main Storage tank 260000 ltrs , sector storage tank of various capacity , Thrust block for rising main, Fencing panel around the civil
C/O Head Weir C/O Sedimentation tank 20000 Ltr. Capacity C/O Filter Bed 40.00 Sqmtrs C/o Clear water tank 65000 Ltrs.Cap. 1 No. Construction of Main Storage tank 65000 Ltrs. cap I No.and Repair Pump HouseUnder JJM
Repair and Restoration of Flushing Gate at Weir Site Including Gate Height Extension, Seal Replacement, Mechanism Servicing, and Repair of 300 mm Sluice Valve with De silting Tank Cleaning and Removal of Blockage from 40-m Flushing Pipe at Rukti HEP
RM of Hydro Mechanical Installations and other related civil works of Beeling MHEP for the year 2025 26 Sub Head Estimate for clearing and cleaning of trash weir trash racks intake channel for maintaining and diversion of regular inflow includin
Hiring of hydraulic excavator 220 n Dumpers for removal of silt debris , muck boulders from down stream of the trench weir between RD 0/00 to 155.00 mtr and shifting of road towards newly constructed spillway channel culvert and Shingle flushing
R M of civil components of Barrage site of 3x42 MW Larji HEP for the year 2025 26 Sub Head Providing a team crew fo r removing sand silt slush etc. from top of bottom stoplog gate of Radial Gate No 2 at Larji HEP
.
C/O R/wall at RD 53/070 to 53/079
C_O RCC Sump well cum clear water tank 95000 ltr cap at node B and C 2Nos C_O RCC Circular main storage tank 120000 ltr cap at node E and C_O pump house cum attendant room above 50HP 2Nos C_O Thrust Block under JJM
Const of RCC main channel (1000 mts) at different RDs, Laying, jointing of HDPE pipes of various dia (110mm OD, 90mm, 75 mm PN-4 (PE-63) in distribution main, distribution channel 5550 m, outlet chambers, head weir, retaining wall 40 m, 2
Site development, prov and laying of distribution system in HDPE pipe of various dia, feeder pipe and C/O head weir, pump house cum attendant qtr sump well, delivery tank, outlet/ B.P. Tank, internal wiring in pump house, rising main 150mm dia, prov
CO RCC trench Weir RCC De siltting chamber 2 Nos RCC Lining of Main channel cut and cover 2520 mtrs RCC main channel 7865 Rmts and CO out let chamber De- silting Drainage system CO Aqueduct Foot path crossing and Retaining wall etc
Head weir Const. of Sedimentation Tank 49000 Ltrs Caps. Providing Placing Filter media in exiting filter Bed of 39.00 Sqm. each in 2 unit C.O. RCC Sump well 90000 Ltrs Caps. C.O. Pump House and C.O RCC Main Storage Tank 90000 Ltrs Caps.
head weir, RCC sump well 36651 ltrs cap, delivery tank 10000 ltrs cap at Node 2, pump house cum attendant qtr, outlets / B.P. Tank 11 Nos HDPE pipe for feeder line, distribution system, providing and errection of pumping machinery, laying and jointin
SH Cons of Temporary head weir Cons Intake Chamber 1 No Cons Water Treatment Plant 0.59 MLD Coons Pump House cum Attendant and quarter Con Toilet above 50 BHP Ist and IInd Stage, Providing Sanitary and electrical installation in pump house, Con
Sainj Nallah to Gharog Ghandal, C/O Head weir at Neukar Khad, LWSS Dafoug, Laying and jointing of G.I. pipes in distribution system of storage tank Ghandal to Saden, storage tank Sheel to vill. Dafoug, storage tank Kalihatti to village Ghech (Kotla)
Construction of percolation well, C/O pump house cum Chowkidar Qtr., C/O Cut off Wall/ Cross weir, C/O Septic tank and Toilet room, Providing, laying ,jointing and testing of rising main, Supply and Erection of pumping machinery , C/O wire crate ..
CO Head Weir Intake Chamber Sedimentation tank Filter bed in three unit Clear water tank of Sump Well of at Point B Main Storage tank at point D Pump house cum attendant quarter Toilets Electric wiring for pump houses and Barbed wire fencing
SH Pattra cutting Co diversion weir Co destling tank Co collection tank 100 KL capacity Co main delivery tank 45 KL capacity Co sector delivery tank 20KL capacity and 25 KL capacity Co approach road protection work to pump house Co pump
Varnishing Overhauling of 40 HP Motor Pump at 1st 2nd stage Kasan Providing and fixing of Electrical Accessories Mechancial spare parts and repair butt welding of gravity main from head weir to pump house at 1st stage KAsan, C/O Retaining wal
CO Diversion Weir Crate walls Inlet Chamber Retaining Wall Anchor Blocks RCC Pillars Providing laying jointing and testing of HDPE pipe 355mm dia including Pattra cutting 450 Rmt MSERW pipe 350mm dia 6 Rmt at various location in between RD 7350 to
Laying Jointing and Testing of Gravity main 80mm dia (MC) by cutting welding of GI pipe at various RDs along with anchor block and C/O head weir at Kasan Khad near Karnal at Balhi at RD 0 to 15 125 Rmt