Loading…
Loading…
1,215 results • Best match
Laying Jointing and Testing of Gravity main 80mm dia (MC) by cutting welding of GI pipe at various RDs along with anchor block and C/O head weir at Kasan Khad near Karnal at Balhi at RD 0 to 15 125 Rmt
(SUB HEAD C/O Dyke 30 mtrs, check dam 25 meters long, Chamber 2 Nos. Percolation well, 2 Nos. pump house, sump well 20000 liters capacity, sump well 65000 liters capacity)
C/o Reed Beds chamber with plantation (abetting pollution/contamination in wastewater), Laying and jointing pipeline, protection work and check dam at site-2 for Rejuvenation of Jattanwala Nala using phytoremediation
Providing and laying of OPGW cable from Ganvi Power House Stage-I to Forbay GPH-I and Ganvi PH-II to Rungcha (Dam Site) under Ganvi Power House Division, HPSEBL, Jeori.
C/O 08 Nos. Check Dam at various location i.e Nagni (near mata temple), Madanpur (on the Danni road), Ladori, Khajjian , Khaseti (Kola Jabbar Khad) Andhoraghat, Kot Plahari and Divku ( Suliali)
SH Construction of retaining wall at R.D.0.025 U.S of existing HPC and 0.030 to 0.070 Left side R.D. 0.025 to 0.043 RHS and providing and laying cement concrete pavement at R.D.0.00 to 0.233
Cons of Head weir, cons RCC Circular Intake Structure, Cons Rectangular Roughing filter at node 2A, RCC Sump well Node-3, C/O WTP 0.83 MLD, Cons RCC Storage reservoir nodes 6 and 7, Cons Fire Hydrant, Providing Laying Jointing and Testing of MSERW
CO 4 Nos. Anchor Block and Providing, laying, jointing, testing and carriage of HDPE pipe 225 mm dia Grade PE-80 PN 6 Kg Cm2 for feeder pipe RD 0 to 125 125 Rmt from head weir to sump well of LIS Noun Pathan
Excavation, Construction of Intake Tank, Cutt of wall,Head Weir,Water Treatment Plant 1.31 MLD ,Sump Well cum Storage Tank at Node No. 2, Node No. 300, Node No. 600, Storage tank at Node 500, Pump houses at 1st 2nd and 3rd stage ic sanitary
SH C O Head weir ,intake,site Development for civil structure, Retaining wall for P House 1st and 2nd stage, Sed tank 14000 Ltrs. ,S Well 2 Nos. 112000 ltrs. cap. each, Main S Tank 89400 ltrs. And P house 2 Nos. Balance work thereof.
Consturction of Head weir 2 Nos Construction of R wall 76 Rmt Construction of RCC Pucca Channel 900 Rmt Construction of pucca field channel 560 Rmt Construction of RCC outlet 4 Nos and Excavation laying jointeing of GI pipe 80 mm dia 2200 Rmt
Head weir 2Nos. Intake chamber2 Nos. Main delivery storage tank at Node 29 1No.Ph 1 of 10000Ltr. Cap., Sector Storage tank at Node 2 of 10000Ltrs. Cap,.Ph II, Sector Storage tank at Node 21 of 25000Ltrs. Cap,.Ph II, Sector Storage tank at Nod
CO Head Weir CO Desilting tank1no. CO RCC Sump Well 1nos 40000 ltr CO Pump House Cum Attendant Room 1nos CO WC Toilet 1nos CO Delivery tank 2 No 10000 Supply and Erection of Pumping Machinery and Providing jointing and Testing of MSERW pipe laying
DPR for the scheme Construction of multi villages water supply scheme MVWSS for Arki constituency from Kol Dam reservoir on Satluj near Padyar in Tehsil Arki District Solan HP in 2nd call
Shifting of existing 22KV HT line of M/S Sai Engineering Foundation Pvt.Ltd. Crossing over Dam Site of 450MW,Shongtong-Karcham HEP,HPPCL in Electrical section Shongtong under ESD HPSEBL Reckong-Peo.
Construction of Ropeways between Chandigarh Manali National Highway (Near Pandoh Dam Reservoir) and Mata Baglamukhi Temple (Bakhli) district Mandi in Himachal Pradesh on CEN Standard (SH Site Development of LTP and UTP
R M of Civil Components of Barrage site of 3x42 MW Larji HEP for the year 2024 25 Sub Head Providing a team crew for carrying out sealing to prevent leakage from the stop logs inserted in Bay No 2 for carrying out the repair and maintenance activ
Improvement, C/o Passing places, CD works, GSB, WBM-II, Wet Mix, side drain, parapets, CC pavement and Tarring work under PMGSY-II (Batch-I, 2019-20) Package No. HP-08-539.
main storage tank 300000 ltrs cap and laying and jointing of distribution system, providing laying of rising main and supply and errection of pumping machinery w
CO of RCC Trench weir at Rokti Nalah CO Wire crate protection wall along the right bank of Rokti KhadRD 9 to 54 Laying, Jointing in trenches and Testing of HDPE Pipe 90mm Nominal dia 2 layers at RD 9 to 460 Jacketing of Sedimentation tank an
C/O head weir, pump house cum attendant qtr, sump well cum storage tank 210500 ltrs , RCC storage tank cum delivery tank 125200 ltrs cap, 64000 ltrs cap,38100 ltrs cap, 25300 ltrs cap, RCC sump cum storage tank, 31200 ltrs,9500 ltrs,12000 ltrs,39000
SH Development of site, C O Pump house, WTP, Delevery tank, Sector storage tanks, Providing L J of GI pipes in distribution system, Providing L J of 200 mm dia Rising main, P F of Pumping Machinery, C/O RCC Head weir cum Intake, Control Chamber, Anch
SH. Const. of Wire Crate Head weir, Laying Jointing and Testing of HDPE pipe 160 mm OD. gravity main On Farm Development Laying, jointing and Testing of HDPE pipes 75mm OD ,90mm OD various RDs, and Const of Out lets chamber 5 Nos Prov.Fix. of MS
SH C O RCC Intake Chambers 3 Nos CO RCC Storage Tank of various capacities 15000 ltr cap 1 No 10000 ltr cap 2 nos C O Retaining wall to protect the storage tank 15 50 mtrs Providing fencing around the Civil structure Head weir and Layin
SH PHASE 1st Site development for all Civil Structures CO Head weir C O Intake chamber 1 no Co Delivery tank 41000 Litrs Cap and RCC Filter Bed 1No 697 Sqmt each and Sed Tank 1No 4000 liters capacity CO 1No Pump house cum chowkidar quarter o
(SH- Provision for Site Development, C/O Head Weir, C/O Crate Wall, C/O Retaining Wall, C/O Feeder Channel, C/O Collection Chamber, C/O Pump House and Attendant Quarter along with Toilet and Septic Tank, C/O Delivery Tank, C/O Hydrant Outlets etc.
Tender for Petty repair of various components of Holi HEP i e PF of trash rack pannels on Trench weir at Intake welding of Ms pipe joints removal of silt from Power channel and Forebay and PF of RCC slippers on channel of water conductor system
SH C O Head weir Phase Lahi , intake chamber Phase Lahi and laying, jointing and testing of GI pipe 25 mm dai at RD 0 to 1500 1500 Rmt Point 2 and 3 , at RD 0 to 1800 1800 Rmt Pont 2 to 4 Job I
SH Development of site and Co retaining wall to protect the civil structure Co Head Weir at Batheri Khad C o intake chamber at Batheri Khad C o Sedimentation tank 22000 Ltr Capacity C/o slow sand filter bed 54.16sqm capacity Co RCC Dome type circ
Development of site C/O Head Weir at point A source intake chamber 6 Nos Sedimentation tank 23000 Ltr Slow sand Filter Bed 570 Sqm Cap RCC Main Storage Tank at Point B 70500 Ltr Cap RCC Sector Storage Tank 19500 Ltr Cap at point E 10000
CO head weir CO RCC intake chamber CO desilting tank CO 5 No. RCC circular sub delivery tank of 30000 ltr. capacity each laying jointing and testing of GI pipe 150mm dia and CO damaged main channel repair of existing kuhl and CO retaining wall at var
SH Development of Site Head weir Intake Cum filter Box C o Run Off and spilover channel C o Silt Trap and Prov bar bed wire fencing around the Rain water harwesting structure C o reservior 1 53 Lakh Ltr cap for Irrigating of Horticulture Land
Providing and fixing of different types of LED lights at Ganvi 1, Ganvi 2, Dam Site Rungcha and all colony complex at Jeori, Kotla, Ganvi and Rungcha under Ganvi Power House Division, HPSEBL, Jeori
SUPPLY AND INSTALLATION OF PREFABRICATED AMPHI-THEATRE AT SUKHNARA ECO-TOURISM COMPLEX AT NAGROTA SURIAN, DISTT KANGRA (HP)
SUPPLY AND INSTALLATION OF PREFABRICATED CAFETARIA AT SUKHNARA ECO-TOURISM COMPLEX AT NAGROTA SURIAN, DISTT KANGRA (HP)
SUPPLY AND INSTALLATION OF PREFABRICATED GAZEBOAT SUKHNARA ECO-TOURISM COMPLEX AT NAGROTA SURIAN, DISTT KANGRA (HP)
C/O multipurpose Dam-I, C/O MDT, Laying and Jointing of Rising Main and supplying and errection and commissioning of pumping machinery with allied accessories and C/O RCC sump well ) Job No . I
SH C-O RCC over head storage tank 40000 liters Capacity 10 meter staging height. 3 Nos RCC storage Tank 25000 liter capacity each with dome slab and C-O 18 mtrs Long Check Dam
Construction of balance work of road including providing woven plain GI wire mesh fencing from Guide Bund to Chamsu Village RD plus/minus 415m to RD plus/minus 1777.50 m in the left bank of Pabbar River at Barrage site of Sawra Kuddu HEP 111 MW in Tehsil Jubbal District Shimla HP
Site Development Phase I, II and III Const. of Retaining wall, Const. of Head weir, Const. of Intake Chamber 3 Nos, Const. of Civil work of Phase-1, II and III, Const. of Pump house for 1 and III stage, Const. of Toilet for pump house, Providing and
C/O Head Weir C/O Field Out Lets18 Nos C/O R/Wall C/O Chamber for protection of Hydrents 29 Nos C/O Delivery tanks 3 Nos and Laying Jointing and testing of HDPE pipe of various dia in distribution systems and Laying Jointing Testing of Rmain
Laying Jointing and testing of Gravity main 65mm dia (M) by cutting welding of GI pipe at various RDs C/O RCC Anchor Blocks 7 Nos Laying joiting and testing of Gravity main 65mm dia 300 Rmt 50mm dia 250 Rmt and C/o Head weir at Kasan Khad
.
C/o Reed Beds chamber with plantation (abetting pollution/contamination in wastewater), Laying and jointing pipeline, P/F barbed wire fencing, protection work and check dam at site-1 for Rejuvenation of Jattanwala Nala using phytoremediation
Custom Bid for Services - Monitoring, Interpretation and submission of report of the Geoteechnical Instruments data installed at Dam Left Bank of LHEP-I Similar Category Testing Service for On-Board/Commissioned Equipment/Instrument related to Plant
Maintaining of electrical wiring system of Kotla colony, Jeori colony, Det. Jeori Colony, Ganvi colony, intake sites, power house complex, dam sites of stageI stageII power house complex for the year of 2026-27 (135 days)
Filter bed 172 Sqm 3 Units , Pump house stage -1 and Stage 2nd , P/L/J of Rising main , Thrust block 23 Nos , Installation of Pumping machinery with allied accessories. , MDT 80000 Ltrs capacity at Node 1 , Clear water tank MDT 205000 ltrs and
C/O head weir and feeder line, pump house Ist 2nd stage, raw water tank, add sed tank 9000 ltrs filter bed, sump well Ist 2nd stage and side storage tank at Node E 10000 ltrs cap, main storage tank 40000 ltr at Node M, side storage tank 20000 ltr